City of Marietta, GA
“Requested by Council Member Waters 20260818 Data Center Ordinance and Georgia Tech Proposal Discussion regarding the development of an ordinance to address data center zoning applications.”
Every local moratorium on data centers we know of in Ohio, Michigan, New York, North Carolina, Georgia, Indiana and Virginia: 623 records, 499 in force or recently adopted, 74 pending or proposed, plus 20 upcoming hearings and votes on data center moratoria and siting rules.
Data last changed (02:41 UTC) · page regenerated daily, last on
| State | In force or adopted | Pending or proposed | Ended | All records | Upcoming items |
|---|---|---|---|---|---|
| Ohio | 147 | 6 | 9 | 160 | 2 |
| Michigan | 193 | 50 | 11 | 250 | 12 |
| New York | 25 | 9 | 1 | 35 | 0 |
| North Carolina | 56 | 8 | 4 | 68 | 1 |
| Georgia | 50 | 5 | 20 | 73 | 3 |
| Indiana | 24 | 5 | 4 | 31 | 2 |
| Virginia | 4 | 1 | 1 | 6 | 0 |
“Pending or proposed” also counts upcoming zoning amendments and siting ordinances for data centers. Coverage differs by state; see coverage by state.
| Month | Moratorium Nation | Siting Radar | Total |
|---|---|---|---|
| Sep 2026 | 28 | 9 | 37 |
| Aug 2026 | 53 | 10 | 63 |
| Jul 2026 | 54 | 14 | 68 |
| Jun 2026 | 61 | 7 | 68 |
| May 2026 | 60 | 10 | 70 |
| Apr 2026 | 44 | 4 | 48 |
| Mar 2026 | 43 | 7 | 50 |
| Feb 2026 | 56 | 10 | 66 |
| Jan 2026 | 25 | 2 | 27 |
| Dec 2025 | 18 | 2 | 20 |
| Nov 2025 | 7 | 1 | 8 |
| Oct 2025 | 2 | 0 | 2 |
| Sep 2025 | 9 | 0 | 9 |
| Aug 2025 | 0 | 0 | 0 |
| Jul 2025 | 0 | 0 | 0 |
| Jun 2025 | 2 | 0 | 2 |
| May 2025 | 1 | 0 | 1 |
| Apr 2025 | 0 | 0 | 0 |
| Mar 2025 | 1 | 0 | 1 |
| Feb 2025 | 1 | 0 | 1 |
| Jan 2025 | 0 | 0 | 0 |
| Dec 2024 | 0 | 0 | 0 |
| Nov 2024 | 0 | 0 | 0 |
| Oct 2024 | 0 | 0 | 0 |
“Requested by Council Member Waters 20260818 Data Center Ordinance and Georgia Tech Proposal Discussion regarding the development of an ordinance to address data center zoning applications.”
“…to hold a public hearing on the petition to vacate an alley right-of-way in Metamora Township, Franklin County, Indiana, to consider an ordinance amending the Franklin County Zoning Code as presented by Area Plan…”
“and development, and permit applications for data centers while the County's proposed regulations WHEREAS, without an extended moratorium, there may be a rush of rezoning, land are being studied, prepared, and…”
“The data center ordinance we just set aside required a host community agreement or community benefits agreement.”
“The process is intended to provide reliable information to the Town Council, Planning Board, staff, and community before consideration of potential Data Center text amendments to the Town’s Land Development Ordinance.”
“First reading of an ordinance to amend Chapter 50, Article 4.1 of the Zoning Ordinance for a moratorium on data centers and similar uses (Action: Motion to offer for first reading and schedule a public hearing for…”
“Public Hearing – Artificial Intelligence Data Center Ordinance”
“a. Data Center Ordinance”
Hearing notice: data center moratorium, Planning Commission; meeting Oct 6, 2026. The notice text is not reproduced here; open the original notice to read it.
On the agenda (before the vote): data center moratorium, Planning Commission; meeting Oct 6, 2026. The notice text is not reproduced here; open the original notice to read it.
Hearing notice: data center moratorium, Township Board; meeting Oct 8, 2026. The notice text is not reproduced here; open the original notice to read it.
“s Motion by:____________ supported by:_________________ to schedule a Public Hearing for the October 8th, 2026 Planning Commission Meeting to consider proposed text amendments to the Charter Township of Washington…”
623 records
| Date | State | Government | County | Uses | Status | Details and source |
|---|---|---|---|---|---|---|
| NC | City of Kings Mountain | Gaston County | Data centers | Pending Hearing notice, Feb 23, 2027 |
Hearing notice for a proposed data center moratorium — City Council Meeting Agendas and Minutes, Feb 23, 2027. Source document (opens in a new tab) (Siting Radar) | |
| MI | Jamestown Charter Township | Ottawa County | Data centers | Pending Hearing notice, Feb 15, 2027 |
Hearing notice for a proposed data center moratorium — Planning Commission, Feb 15, 2027. Source document (opens in a new tab) (Siting Radar) | |
| MI | Fredonia Township | Calhoun County | Battery storage (BESS), Data centers | Pending Hearing notice, Oct 14, 2026 |
Hearing notice for a proposed battery storage/data center moratorium — Planning Commission, Oct 14, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Hope Township | Barry County | Data centers | Pending Hearing notice, Oct 13, 2026 |
Hearing notice for a proposed data center moratorium — Planning Commission, Oct 13, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Blair Township | Grand Traverse County | Data centers | Pending Hearing notice, Oct 13, 2026 |
Hearing notice for a proposed data center moratorium — Oct 13, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Freeman Township | Clare County | Data centers | Pending Hearing notice, Oct 8, 2026 |
Hearing notice for a proposed data center moratorium — Township Board, Oct 8, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Pennfield Charter Township | Calhoun County | Data centers | Pending Public hearing, Oct 6, 2026 |
Public hearing on a proposed data center moratorium — Planning Commission, Oct 6, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Penn Township | Cass County | Data centers | Pending Hearing notice, Oct 6, 2026 |
Hearing notice for a proposed data center moratorium — Planning Commission, Oct 6, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | City of Kalamazoo | Kalamazoo County | Data centers, Battery storage (BESS), Crypto mining | Pending Hearing notice, Oct 5, 2026 |
Hearing notice for a proposed data center moratorium — City Commission, Oct 5, 2026. Source document (opens in a new tab) (Siting Radar) | |
| GA | Walker County | — | Data centers | Pending On the agenda (before the vote), Oct 1, 2026 |
Drafting of a data center moratorium — Board of Commissioners, Oct 1, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | Town of Butner | Granville County | Data centers | Pending On the agenda (before the vote), Oct 1, 2026 |
Drafting of a data center moratorium — Town Council, Oct 1, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NY | City of Buffalo | Erie County | Crypto mining, Data centers | Proposed On the agenda (before the vote), Sep 29, 2026 |
Vote scheduled on a proposed crypto mining/data center moratorium — Common Council, Sep 29, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Rives Township | Jackson County | Data centers | Proposed On the agenda (before the vote), Sep 28, 2026 |
Discussion of a possible data center moratorium — Sep 28, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NY | Frankfort Town | Herkimer County | Crypto mining, Data centers, Battery storage (BESS), Solar, Wind | Proposed On the agenda (before the vote), Sep 24, 2026 |
Vote scheduled on a proposed battery storage/crypto mining/data center/solar/wind moratorium — Sep 24, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Clay Township | St. Clair County | Crypto mining, Data centers | Proposed Hearing notice, Sep 23, 2026 |
Hearing notice for a proposed crypto mining/data center moratorium — Planning Commission, Sep 23, 2026. Source document (opens in a new tab) (Siting Radar) | |
| IN | Owen County | — | Data centers | Proposed On the agenda (before the vote), Sep 22, 2026 |
Discussion of a possible data center moratorium — 🗂️ Commissioners Agendas, Sep 22, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | City of Dearborn | Wayne County | Data centers | In force Active |
Zoning ordinance amendment establishing a temporary moratorium and a data-center definition (ordinance number not located) (Moratorium Nation) | |
| MI | Port Huron Charter Township | St. Clair County | Data centers | In force Active |
Ordinance No. 257, Temporary Moratorium on Data Centers and Other High Resource Demand Facilities (also adds Zoning Ordinance Sec. 114 authorizing... (Moratorium Nation) Earlier item in our records: Hearing notice, Jul 9, 2026 |
|
| OH | Fayette County | — | Data centers | In force Active; runs to Jun 1, 2027 |
Board of County Commissioners resolution (county zoning authority, emergency) imposing a moratorium on data center-related applications, zoning... (Moratorium Nation) | |
| MI | East China Township | St. Clair County | Data centers | Adopted Adopted, Sep 21, 2026 |
Data center moratorium adopted — Township Board, Sep 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Columbia Township | Jackson County | Data centers | Proposed On the agenda (before the vote), Sep 21, 2026 |
Vote scheduled on a proposed data center moratorium — Sep 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| GA | City of East Point | Fulton County | Data centers | Proposed On the agenda (before the vote), Sep 21, 2026 |
Vote scheduled on a proposed data center moratorium — City Council, Sep 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Caledonia Township | Kent County | Data centers | Proposed On the agenda (before the vote), Sep 21, 2026 |
Vote scheduled on a proposed data center moratorium — Caledonia Planning Commission, Sep 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Brighton Township | Livingston County | Data centers | In force Active |
Charter Township of Brighton ordinance 'to Enact a Temporary Moratorium on Data Centers' (MTA model general ordinance, one-meeting adoption);... (Moratorium Nation) | |
| MI | Acme Township | Grand Traverse County | Data centers | Proposed On the agenda (before the vote), Sep 21, 2026 |
Drafting of a data center moratorium — Planning Commission, Sep 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Pulaski Township | Jackson County | Data centers | Proposed On the agenda (before the vote), Sep 18, 2026 |
Vote scheduled on a proposed data center moratorium — Sep 18, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Egelston Township | Muskegon County | Data centers | Adopted Adopted, Sep 17, 2026 |
Data center moratorium adopted — Board of Trustees, Sep 17, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Anderson Township | Hamilton County | Data centers | Proposed On the agenda (before the vote), Sep 17, 2026 |
Discussion of a possible data center moratorium — Board of Trustees, Sep 17, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Village of McDonald | Trumbull County | Data centers | In force Active |
Emergency ordinance of McDonald Village Council (ordinance number not published in sources found) (Moratorium Nation) | |
| NY | Village of Andover | Allegany County | Crypto mining, Data centers | Proposed On the agenda (before the vote), Sep 16, 2026 |
Planning commission recommendation on a proposed crypto mining/data center moratorium — Allegany County Planning Board, Sep 16, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NY | Onondaga County | — | Crypto mining, Data centers | Proposed On the agenda (before the vote), Sep 16, 2026 |
Planning commission recommendation on a proposed crypto mining/data center moratorium — Onondaga County Planning Board (Syracuse-Onondaga County Planning Agency staff), Sep 16, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NY | Massena Town | St. Lawrence County | Data centers | Proposed On the agenda (before the vote), Sep 16, 2026 |
Vote scheduled on a proposed data center moratorium — Massena Town Council, Sep 16, 2026. Source document (opens in a new tab) (Siting Radar) | |
| VA | Loudoun County | — | Data centers | In force Active |
Board of Supervisors action taken September 16, 2026 enacting a temporary pause on Board consideration of certain legislative (Special Exception)... (Moratorium Nation) | |
| IN | City of Gary | Lake County | Data centers | In force Active |
Executive Order signed by Gary Mayor Eddie D. Melton on 2026-09-16, pausing approval of new data center development in the city (Moratorium Nation) | |
| MI | Cedar Creek Township | Muskegon County | Data centers | Proposed Hearing notice, Sep 16, 2026 |
Hearing notice for a proposed data center moratorium — Planning Commission, Sep 16, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Volinia Township | Cass County | Data centers | Proposed On the agenda (before the vote), Sep 15, 2026 |
Planning commission recommendation on a proposed data center moratorium — Planning Commission, Sep 15, 2026. Source document (opens in a new tab) (Siting Radar) | |
| IN | Steuben County | — | Data centers | In force Active |
Resolution adopted by the Steuben County Board of Commissioners on 2026-09-15, formalizing an August 2026 Steuben County Plan Commission... (Moratorium Nation) | |
| MI | Richland Township | Kalamazoo County | Data centers | Adopted Extended, Sep 15, 2026 |
Data center moratorium extended — Township Board, Sep 15, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | Montgomery County | — | Data centers | Proposed On the agenda (before the vote), Sep 15, 2026 |
Vote scheduled on a proposed data center moratorium — Board of Commissioners, Sep 15, 2026. Source document (opens in a new tab) (Siting Radar) | |
| GA | Lamar County | — | Data centers | Proposed On the agenda (before the vote), Sep 15, 2026 |
Vote scheduled on a proposed data center moratorium — Sep 15, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Dorr Township | Allegan County | Solar, Data centers | Proposed On the agenda (before the vote), Sep 15, 2026 |
Drafting of a data center moratorium — Sep 15, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Village of Pioneer | Williams County | Data centers | In force Active |
Pioneer Village Council legislation imposing a six-month moratorium on data centers (form and number not reported) (Moratorium Nation) | |
| NC | Vance County | — | Data centers | In force Active |
Vance County 60-day data center moratorium (number not located), N.C.G.S. 160D-107; the legal notice advertised 60 days, so a 6-month motion was... (Moratorium Nation) | |
| MI | London Township | Monroe County | Data centers | Adopted Adopted, Sep 14, 2026 |
Data center moratorium adopted — Board of Trustees, Sep 14, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | East Bay Township | Grand Traverse County | Data centers | Adopted Extended, Sep 14, 2026 |
Data center moratorium extended — Township Board, Sep 14, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | City of Statesville | Iredell County | Data centers | In force Active |
City of Statesville data center moratorium ordinance (number not located), N.C.G.S. 160D-107 (Moratorium Nation) | |
| OH | City of Lima | Allen County | Data centers | In force Active |
Ordinance 198-26, 'An ordinance enacting an eighteen-month moratorium on the establishment, development, processing, review and approval of... (Moratorium Nation) | |
| GA | Chatham County | — | Data centers | In force Active |
Ordinance of the Chatham County Board of Commissioners creating new subsection 3-102 of Article I, imposing a temporary moratorium on development... (Moratorium Nation) | |
| MI | Emmett Charter Township | Calhoun County | Data centers | Adopted Adopted, Sep 10, 2026 |
Data center moratorium adopted — Township Board, Sep 10, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | City of Southport | Brunswick County | Data centers | In force Active |
City of Southport data center moratorium ordinance, N.C.G.S. 160D-107 (ordinance number not located); recommended by the Planning Board (Moratorium Nation) | |
| MI | Kasson Township | Leelanau County | Data centers | Ended Rescinded, Sep 9, 2026 |
Data center moratorium rescinded — Board of Trustees, Sep 9, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | City of Warren | Trumbull County | Data centers | In force Active |
Ordinance of Warren City Council establishing a one-year moratorium on data centers larger than 1,000 sq ft and directing the mayor to form a Data... (Moratorium Nation) | |
| OH | Northfield Center Township | Summit County | Data centers | In force Active |
Trustee Resolution 26/09-08 B imposing a temporary moratorium on the acceptance, processing and issuance of zoning certificates, permits and... (Moratorium Nation) | |
| NC | Nash County | — | Data centers, Crypto mining | In force Active |
Nash County temporary development moratorium ordinance on data centers, data processing facilities, cryptocurrency mining and similar high-impact... (Moratorium Nation) | |
| OH | Fairfield Township | Butler County | Data centers | In force Active |
Fairfield Township (Butler County) Resolution No. 26-85, 'Resolution Imposing a Six-Month Data Center Moratorium for Fairfield Township' (Moratorium Nation) | |
| OH | City of Westlake | Cuyahoga County | Data centers | In force Active |
City of Westlake Ordinance No. 2026-99 (emergency), moratorium on zoning approvals and occupancy permits for data centers as a use, not to exceed... (Moratorium Nation) | |
| NC | City of Lincolnton | Lincoln County | Data centers | In force Active |
Lincolnton City Council motion/ordinance adopting a moratorium on data center applications (2026-09-03) (Moratorium Nation) | |
| NC | City of Hendersonville | Henderson County | Data centers | In force Active; runs to Sep 3, 2027 |
Ordinance #O-26-29, Ordinance Imposing a Temporary Moratorium on Data Centers, N.C.G.S. 160D-107 (Moratorium Nation) | |
| OH | Village of Newton Falls | Trumbull County | Data centers | In force Active |
Emergency ordinance of Newton Falls council imposing a 12-month moratorium on data center permits (number not found) (Moratorium Nation) | |
| MI | Goodwell Township | Newaygo County | Data centers | Adopted Adopted, Sep 2, 2026 |
Data center moratorium adopted — Township Board, Sep 2, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Zeeland Charter Township | Ottawa County | Data centers, Solar, Wind, Battery storage (BESS), Crypto mining | In force Active |
Township Board resolution 'A Resolution Enacting Temporary Moratoria on Energy Facilities and Data Centers' adopted 2026-09-01 under Section 3.36... (Moratorium Nation) | |
| MI | Wales Township | St. Clair County | Data centers | Adopted Extended, Sep 1, 2026 |
Data center moratorium extended — Township Board, Sep 1, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Somerset Township | Hillsdale County | Data centers | Proposed Hearing notice, Sep 1, 2026 |
Hearing notice for a proposed data center moratorium — Planning Commission, Sep 1, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | City of Miamisburg | Montgomery County | Data centers | In force Active |
City of Miamisburg Council legislation imposing a nine-month moratorium on data center development (ordinance/resolution number not located) (Moratorium Nation) | |
| OH | City of Defiance | Defiance County | Data centers | In force Active; runs to Feb 28, 2027 |
Emergency ordinance of Defiance City Council placing a six-month moratorium on 'the acceptance, review, processing and approval of applications... (Moratorium Nation) | |
| 2026-09 | NC | Town of Newport | Carteret County | Data centers, Crypto mining | In force Active |
Town of Newport moratorium on data centers, data processing facilities, cryptocurrency mining operations and associated uses in town limits and... (Moratorium Nation) |
| 2026-09 | OH | Northwest Township | Williams County | Data centers | In force Active |
Northwest Township (Williams County) trustee resolution (number not found) (Moratorium Nation) |
| 2026-09 | OH | Bridgewater Township | Williams County | Data centers | In force Active |
Bridgewater Township (Williams County) Board of Trustees action approving a 12-month moratorium on data centers; instrument number not found (Moratorium Nation) |
| IN | Wabash County | — | Data centers | In force Active |
Wabash County Board of Commissioners ordinance imposing a temporary moratorium on improvement-location permits for data center development,... (Moratorium Nation) | |
| NC | McDowell County | — | Data centers | In force Active |
McDowell County data center moratorium (number not located), N.C.G.S. 160D-107 (Moratorium Nation) | |
| GA | City of Forest Park | Clayton County | Data centers | In force Active |
Forest Park City Council 90-day data center moratorium (instrument number not published) (Moratorium Nation) | |
| NC | Town of Cary | Wake County | Data centers, Crypto mining | In force Active |
Ordinance Establishing a Temporary 18-month Moratorium on the Acceptance, Processing, and Approval of Development Applications for Data Centers,... (Moratorium Nation) | |
| IN | Clark County | — | Data centers | In force Active |
Ordinance approved by the Clark County Commissioners (unincorporated county); ordinance number not confirmed (Moratorium Nation) | |
| GA | City of Savannah | Chatham County | Data centers | In force Active |
City Council ordinance imposing a 155-day temporary moratorium on data centers of 10 MW or greater and on conversion of industrial buildings of... (Moratorium Nation) | |
| IN | City of Elkhart | Elkhart County | Data centers, Battery storage (BESS) | In force Active |
Elkhart Common Council ordinance, adopted 9-0 at a special meeting on 2026-08-27, pausing acceptance of new data center and battery energy storage... (Moratorium Nation) | |
| MI | Resort Township | Emmet County | Data centers | Proposed Hearing notice, Aug 25, 2026 |
Hearing notice for a proposed data center moratorium — Planning Commission, Aug 25, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NY | Orangetown Town | Rockland County | Battery storage (BESS), Data centers | In force Active |
Town of Orangetown Local Law No. 5 of 2026, adding Article XX to Chapter 43 (Zoning) (Moratorium Nation) | |
| GA | Lowndes County | — | Data centers | In force Active |
Board of Commissioners moratorium on accepting applications for data center permits in unincorporated Lowndes County (instrument number not published) (Moratorium Nation) | |
| MI | Garfield Charter Township | Grand Traverse County | Data centers, Crypto mining | In force Active; runs to Aug 25, 2027 |
Township Board Resolution for Temporary Moratorium on Data Centers and Cryptocurrency Mining Facilities (adopted 2026-08-25; resolution number not... (Moratorium Nation) | |
| NC | City of Whiteville | Columbus County | Data centers, Crypto mining | In force Active |
City of Whiteville moratorium on data centers and cryptocurrency mining (ordinance number not located) (Moratorium Nation) | |
| MI | City of Warren | Macomb County | Data centers | In force Active |
City Council moratorium resolution prepared by council attorney Jeffrey Schroeder (Plunkett Cooney); number not located (Moratorium Nation) | |
| MI | Village of Mattawan | Van Buren County | Data centers | Adopted Adopted, Aug 24, 2026 |
Data center moratorium adopted — Village Board, Aug 24, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | Town of Hildebran | Burke County | Data centers | In force Active |
Town of Hildebran data center moratorium (number not located); adopted after the town's March 2026 permanent data center zoning regulations (Moratorium Nation) | |
| NC | Durham County | — | Data centers, Crypto mining | In force Active; runs to May 18, 2027 |
Ordinance imposing a temporary moratorium on the permitting of large-scale data centers, data processing facilities, cryptocurrency mining... (Moratorium Nation) | |
| OH | City of Chillicothe | Ross County | Data centers | Ended Rescinded |
City of Chillicothe Ordinance 44-26 (emergency), moratorium on accepting/issuing zoning permits and approvals for new (auxiliary and large-scale)... (Moratorium Nation) | |
| NC | Town of Highlands | Macon County | Data centers, Crypto mining | In force Active |
Town of Highlands temporary moratorium ordinance on data centers, cryptocurrency mining and other high-intensity computing facilities (number not located) (Moratorium Nation) | |
| MI | Dayton Township | Newaygo County | Data centers | Adopted Adopted, Aug 20, 2026 |
Data center moratorium adopted — Aug 20, 2026. Source document (opens in a new tab) (Siting Radar) | |
| GA | City of Bloomingdale | Chatham County | Data centers | In force Active |
Resolution No. 2026-012 (City of Bloomingdale) declaring a moratorium on acceptance of applications relating to establishment or expansion of data centers (Moratorium Nation) | |
| NC | Warren County | — | Data centers | In force Active |
Ordinance imposing a 12-month moratorium on development approvals for data centers and related high-impact facilities (number not located) (Moratorium Nation) | |
| IN | Indianapolis (Marion County) (City) | Data centers | In force Active; runs to Dec 31, 2027 |
Proposal 238-2026, a zoning text amendment and moratorium, advanced by the City-County Council 23-1 on 2026-08-10 (sponsored by Council President... (Moratorium Nation) | ||
| MI | Ypsilanti Charter Township | Washtenaw County | General / multiple uses, Data centers | In force Active |
Charter Township of Ypsilanti Resolution 2026-21, A Resolution Establishing a Temporary Moratorium on the Establishment, Construction, Expansion,... (Moratorium Nation) | |
| MI | Sheridan Charter Township | Newaygo County | Data centers | Adopted Adopted, Aug 18, 2026 |
Data center moratorium adopted — Township Board, Aug 18, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | Jackson County | — | Data centers | In force Active |
Jackson County data center moratorium ordinance (number not located), N.C.G.S. 160D-107; bars zoning, development, building and demolition... (Moratorium Nation) | |
| VA | City of Virginia Beach | Virginia Beach city | Data centers | In force Active |
Resolution adopted by Virginia Beach City Council on August 18, 2026, pausing the issuance of permits related to any new data center for 12 months... (Moratorium Nation) | |
| NC | City of Greensboro | Guilford County | Data centers | In force Active |
City Council moratorium ordinance pausing acceptance, processing and approval of development applications for data centers, data storage and... (Moratorium Nation) | |
| NC | Yadkin County | — | Data centers | In force Active |
Yadkin County data center moratorium ordinance, N.C.G.S. 160D-107 (ordinance number not located) (Moratorium Nation) | |
| OH | Village of Mount Gilead | Morrow County | Data centers | In force Active |
Village of Mount Gilead Ordinance 2027, temporary moratorium not to exceed one year on new permits and on receipt/processing of permit... (Moratorium Nation) | |
| OH | Village of Jefferson | Ashtabula County | Data centers | In force Active |
Village of Jefferson (Ashtabula County) emergency ordinance establishing a moratorium on accepting for filing and consideration, and/or issuing... (Moratorium Nation) | |
| IN | Howard County | — | Data centers | In force Active |
Ordinance 2026-BCCO-32 (Moratorium Nation) | |
| MI | City of Kalamazoo | Kalamazoo County | Data centers, Battery storage (BESS), Crypto mining | In force Active; runs to Aug 16, 2027 |
City Commission resolution establishing a moratorium on the acceptance and/or processing of applications for Data Centers, Battery Energy Storage... (Moratorium Nation) | |
| OH | City of Fairborn | Greene County | Data centers, General / multiple uses | In force Active |
Resolution 38-26 (City of Fairborn), placing 12-month temporary moratoriums on data centers, self-storage facilities, gas stations, convenience... (Moratorium Nation) | |
| NC | Alamance County | — | Data centers | In force Active |
Ordinance Imposing a Temporary Moratorium on Development Approvals for data centers in unincorporated Alamance County, N.C.G.S. 160D-107... (Moratorium Nation) | |
| MI | Presque Isle County | — | Data centers | Adopted Adopted, Aug 13, 2026 |
Data center moratorium adopted — Board of Commissioners, Aug 13, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NY | Mohawk Town | Montgomery County | Data centers | In force Active |
Town of Mohawk local law imposing a six-month moratorium on data center permitting (Moratorium Nation) | |
| NY | Le Ray Town | Jefferson County | Data centers | In force Active |
Town of LeRay local law establishing a moratorium on data centers (Moratorium Nation) | |
| GA | City of Ball Ground | Cherokee County | Data centers | In force Active; runs to Feb 9, 2027 |
Ball Ground City Council moratorium on data center applications (instrument and term not published in accessible sources) (Moratorium Nation) | |
| MI | Burlington Township | Calhoun County | Battery storage (BESS), Data centers | Adopted Adopted, Aug 13, 2026 |
Battery storage/data center moratorium adopted — Township Board, Aug 13, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Village of Garrettsville | Portage County | Data centers | In force Active |
Ordinance No. 2026-16 (Village of Garrettsville), emergency, imposing a twelve-month moratorium on acceptance of any zoning application for data centers (Moratorium Nation) | |
| MI | Vevay Township | Ingham County | Battery storage (BESS), Data centers | Adopted Adopted, Aug 12, 2026 |
Battery storage moratorium adopted — Township Board, Aug 12, 2026. Source document (opens in a new tab) (Siting Radar) | |
| IN | Warrick County | — | Data centers | In force Active |
Warrick County Area Plan Commission recommendation (2026-08-10 monthly meeting) approved by the Warrick County Board of Commissioners at a special... (Moratorium Nation) | |
| NC | Town of Waxhaw | Union County | Data centers, Crypto mining | In force Active |
Ordinance ORD2026014, An Ordinance Imposing a Temporary Moratorium on the acceptance, processing and approval of development applications for data... (Moratorium Nation) | |
| MI | Pere Marquette Charter Township | Mason County | Data centers | In force Active |
Ordinance No. 162 (temporary data center moratorium, adopted 2026-08-11) and Ordinance No. 163 (zoning ordinance amendment adding Article 33.07,... (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), Jul 14, 2026 |
|
| NY | Islip Town | Suffolk County | Data centers | In force Active |
Town of Islip Town Code Chapter 68-761, an 18-month moratorium on data center development (Moratorium Nation) | |
| MI | Grattan Township | Kent County | Data centers | Adopted Adopted, Aug 11, 2026 |
Data center moratorium adopted — Township Board, Aug 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Garden Township | Delta County | Data centers | Adopted Adopted, Aug 11, 2026 |
Data center moratorium adopted — Township Board, Aug 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Burnside Township | Lapeer County | Data centers | Proposed On the agenda (before the vote), Aug 11, 2026 |
Vote scheduled on a proposed data center moratorium — Planning Commission, Aug 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Village of Plain City | Madison County | Data centers | In force Active; runs to Aug 10, 2027 |
Ordinance 37-2026, 'Establishing a Temporary Moratorium on Data Center Development Within the Corporate Limits of the Village of Plain City and... (Moratorium Nation) | |
| MI | Ovid Township | Branch County | Data centers | Adopted Adopted, Aug 10, 2026 |
Data center moratorium adopted — Township Board, Aug 10, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Fayette Township | Hillsdale County | Battery storage (BESS), Data centers, Wind | Adopted Adopted, Aug 10, 2026 |
Battery storage/data center/wind moratorium adopted — Township Board, Aug 10, 2026. Source document (opens in a new tab) (Siting Radar) | |
| IN | City of Valparaiso | Porter County | Data centers | In force Active; runs to Jul 31, 2028 |
Ordinance No. 16-2026, "An Ordinance Establishing a Temporary Moratorium on New Data Center Development," adopted by the Valparaiso Common Council... (Moratorium Nation) | |
| GA | Putnam County | — | Data centers, Battery storage (BESS), Solar | In force Active; runs to Nov 18, 2026 |
Board of Commissioners moratorium on new data centers, battery energy storage facilities and solar farms (instrument number not published) (Moratorium Nation) | |
| NC | Town of Nashville | Nash County | Data centers, Crypto mining | In force Active |
Ordinance 2026-23, temporary moratorium on data centers, data processing facilities, cryptocurrency mining operations and similar uses, N.C.G.S. 160D-107 (Moratorium Nation) | |
| GA | Appling County | — | Data centers | Ended Expired |
Appling County Board of Commissioners Resolution declaring a temporary 40-day emergency moratorium on data center facilities (electrical permits,... (Moratorium Nation) | |
| NC | Town of Farmville | Pitt County | Data centers | In force Active |
Town of Farmville data center moratorium ordinance (number not located), N.C.G.S. 160D-107 (Moratorium Nation) | |
| NY | Tonawanda Town | Erie County | Data centers | In force Active |
Local law imposing a one-year moratorium on data centers of 20 MW or more, Town of Tonawanda, Erie County; signed/filed text not located. (Moratorium Nation) | |
| GA | Madison County | — | Data centers | In force Extended; runs to Feb 22, 2027 |
Madison County Board of Commissioners moratorium actions (30-day moratorium, early August 2026; extended/readopted 2026-08-31); instrument numbers... (Moratorium Nation) | |
| NC | Edgecombe County | — | Data centers | In force Active |
Edgecombe County two-year moratorium on accepting, processing and approving development applications and permits for data centers and related uses... (Moratorium Nation) | |
| MI | City of Marshall | Calhoun County | Data centers | In force Active |
City of Marshall Council Resolution Instituting a Temporary Moratorium on Approval of Data Centers (Resolution No. 2026-__; number not shown on... (Moratorium Nation) | |
| IN | City of Jeffersonville | Clark County | Data centers | In force Active |
Jeffersonville City Council ordinance, adopted 8-0 on 2026-08-03, halting approval of new data center development for one year (Moratorium Nation) | |
| OH | City of Athens | Athens County | Data centers | In force Active |
City of Athens Ordinance 70-26 (0-70-26), temporary moratorium on data centers (AI and large-scale data storage), emergency measure (Moratorium Nation) | |
| NC | Camden County | — | Data centers, Crypto mining | In force Active |
Camden County moratorium ordinance on development related to data centers, data processing facilities and cryptocurrency mining (number not located) (Moratorium Nation) | |
| OH | Athens Township | Athens County | Data centers | In force Active |
Athens Township Trustees Resolution 08-01-2026, temporary moratorium on receipt, processing or approval of zoning certificate applications for... (Moratorium Nation) | |
| 2026-08 | GA | Banks County | — | Data centers | In force Extended; runs to Mar 9, 2027 |
Banks County Board of Commissioners initial 30-day emergency moratorium on data center applications (August 2026, to update the county code),... (Moratorium Nation) |
| MI | Orleans Township | Ionia County | Battery storage (BESS), Data centers, Solar, Wind | Adopted Adopted, Jul 30, 2026 |
Battery storage/data center/solar/wind moratorium adopted — Township Board, Jul 30, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Village of Lawrence | Van Buren County | Data centers | Adopted Adopted, Jul 29, 2026 |
Data center moratorium adopted — Village Council, Jul 29, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Perry Township | Lake County | Data centers | In force Active |
Perry Township (Lake County) Trustee Resolution 2026-30, 'Resolution Imposing a Zoning Moratorium for Data Center Uses Located in Perry Township'... (Moratorium Nation) | |
| GA | Paulding County | — | Data centers | In force Active |
Paulding County Board of Commissioners resolution suspending new data center applications, zoning requests, and civil plan reviews (Moratorium Nation) | |
| GA | City of Albany | Dougherty County | Data centers | In force Active |
Albany City Commission vote adopting a 12-month halt on all new data center development (Moratorium Nation) | |
| OH | Village of Buckeye Lake | Licking County | Data centers | In force Active |
Village of Buckeye Lake Resolution No. 2026-13 (emergency, under Village Charter home-rule powers), a one-year moratorium on accepting and issuing... (Moratorium Nation) | |
| MI | Kalamazoo Charter Township | Kalamazoo County | Data centers | In force Active |
Charter Township of Kalamazoo Ordinance No. 647, moratorium on data centers (Moratorium Nation) | |
| OH | Clear Creek Township | Warren County | Data centers | In force Active |
Clearcreek Township (Warren County) trustee resolution imposing a one-year moratorium on issuance of permits for data centers (number not found) (Moratorium Nation) | |
| GA | City of Toccoa | Stephens County | Data centers | In force Active |
Toccoa City Commission data center ordinance moratorium (instrument number not published) (Moratorium Nation) | |
| MI | Marion Township | Livingston County | Data centers | Adopted Adopted, Jul 24, 2026 |
Data center moratorium adopted — Planning Commission, Jul 24, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NY | Tyre Town | Seneca County | Data centers | In force Active |
Town of Tyre Local Law No. 2 of 2026, "A Local Law Establishing a Moratorium on Data Centers and Artificial Intelligence Computing Facilities... (Moratorium Nation) | |
| GA | Cherokee County | — | Data centers | In force Extended; runs to Feb 14, 2027 |
Cherokee County Board of Commissioners resolution instituting a 30-day moratorium on data center applications (July 2026), extended by a Board... (Moratorium Nation) | |
| MI | Ross Township | Kalamazoo County | Data centers | Adopted Extended, Jul 21, 2026 |
Data center moratorium extended — Township Board, Jul 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Independence Charter Township | Oakland County | Data centers | In force Active |
Township Board resolution adopted 2026-07-21 (number not located) (Moratorium Nation) | |
| MI | Delta County | — | Data centers, Crypto mining | In force Active; runs to Jul 21, 2027 |
Delta County Board of Commissioners 'Resolution for a Moratorium on Data Centers and Cryptocurrency Mining Construction in Delta County', adopted... (Moratorium Nation) | |
| OH | City of North Royalton | Cuyahoga County | Data centers | In force Active |
City of North Royalton Ordinance No. 26-118 (emergency), temporary one-year moratorium on zoning, occupancy, conditional use and building permit... (Moratorium Nation) | |
| MI | City of Imlay City | Lapeer County | Data centers | Proposed On the agenda (before the vote), Jul 21, 2026 |
Discussion of a possible data center moratorium — Jul 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| VA | City of Chesapeake | Chesapeake city | Data centers | In force Active |
Resolution 26-R-042, adopted by Chesapeake City Council 9-0 on July 21, 2026 (Moratorium Nation) | |
| GA | City of Chamblee | DeKalb County | Data centers | In force Active |
Chamblee City Council temporary moratorium suspending acceptance of applications relating to new data centers (sponsored by At-Large Councilmember... (Moratorium Nation) | |
| MI | Fruitland Township | Muskegon County | Data centers | Adopted Adopted, Jul 20, 2026 |
Data center moratorium adopted — Jul 20, 2026. Source document (opens in a new tab) (Siting Radar) | |
| GA | Dougherty County | — | Data centers | In force Extended; runs to Feb 27, 2027 |
Dougherty County Commission vote adopting a 45-day pause on data center projects (Moratorium Nation) | |
| GA | City of Warner Robins | Houston County | Data centers | In force Active |
Warner Robins City Council temporary six-month moratorium on acceptance, processing or issuance of zoning, building permit, business license and... (Moratorium Nation) | |
| MI | City of St. Ignace | Mackinac County | Data centers | Adopted Adopted, Jul 20, 2026 |
Data center moratorium adopted — City Council, Jul 20, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Blackman Charter Township | Jackson County | Data centers | Adopted Adopted, Jul 20, 2026 |
Data center moratorium adopted — Township Board, Jul 20, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Hagar Township | Berrien County | Data centers | In force Active |
Board of Trustees-approved moratorium (ordinance/resolution number not located) (Moratorium Nation) | |
| MI | Lake Township | Huron County | Data centers | In force Active |
Board-adopted moratorium (ordinance number not located; the official ordinances page did not contain the adopted text as of 2026-07-31) (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), May 21, 2026 |
|
| IN | City of New Albany | Floyd County | Data centers | In force Active |
Ordinance Z-26-02, a temporary moratorium on construction of new data centers in the city and its two-mile fringe planning jurisdiction; proposed... (Moratorium Nation) | |
| NC | City of Mount Airy | Surry County | Data centers, Crypto mining | In force Extended; runs to Dec 13, 2026 |
Ordinance No. 2027-002 (initial 60-day moratorium, adopted 2026-07-16); extended by Ordinance No. 2027-008 (ninety-day extension, public hearing... (Moratorium Nation) | |
| OH | City of Clayton | Montgomery County | Data centers, Crypto mining | In force Active; runs to Jul 16, 2027 |
City of Clayton Resolution No. R-07-26-46 (immediate temporary 365-day moratorium on zoning, conditional use and building permit applications for... (Moratorium Nation) | |
| NY | Brookhaven Town | Suffolk County | Data centers | In force Active; runs to Dec 31, 2027 |
Chapter 17 ('Moratorium'), Article I ('Data Centers') of the Town Code of the Town of Brookhaven, added by a local law unanimously adopted 6-0... (Moratorium Nation) | |
| NY | East Greenbush Town | Rensselaer County | Data centers | In force Active |
Local Law No. 3 of 2026 (Town of East Greenbush), 'A Local Law Imposing a Moratorium on Applications for Permits, Site Plans or Other Land Use... (Moratorium Nation) | |
| OH | City of Cleveland | Cuyahoga County | Data centers | In force Active |
Ordinance 556-2026, following Councilmember Charles Slife's initial proposal; advanced by the Utilities Committee (chaired by Brian Kazy) and... (Moratorium Nation) | |
| MI | Wheeler Township | Gratiot County | Data centers | In force Active |
Township Board temporary data center moratorium adopted 2026-07-14 (instrument number not stated in the notice of adoption) (Moratorium Nation) | |
| MI | West Branch Township | Marquette County | Crypto mining, Data centers | Adopted Adopted, Jul 14, 2026 |
Crypto mining/data center moratorium adopted — Zoning Board of Appeals, Jul 14, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Lovells Township | Crawford County | Data centers | Adopted Adopted, Jul 14, 2026 |
Data center moratorium adopted — Township Board, Jul 14, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Green Township | Harrison County | Data centers, General / multiple uses | In force Active |
Trustee resolution (number not published) imposing a 12-month moratorium on new development; adopted alongside a resolution to begin establishing... (Moratorium Nation) | |
| MI | Ellington Township | Tuscola County | Data centers | In force Active |
Resolution 2026-07R (Moratorium Nation) | |
| MI | Dryden Township | Lapeer County | Data centers | In force Active |
Police-powers moratorium on data centers dated 2026-07-14 (number not located) (Moratorium Nation) | |
| OH | City of Willoughby | Lake County | Data centers | In force Active |
City of Willoughby Resolution No. 2026-98 (emergency), a temporary one-year moratorium on permits and on plan consideration, review or approval... (Moratorium Nation) | |
| OH | City of Springfield | Clark County | Data centers | In force Active |
City Commission ordinance, passed 5-0 on second reading; Ordinance 159-26 (Moratorium Nation) | |
| OH | City of Hudson | Summit County | Data centers | In force Active |
City Council legislation (six-month stay/moratorium on filing, review and approval of new data center applications), adopted on consent agenda... (Moratorium Nation) | |
| NC | Town of Hot Springs | Madison County | Data centers, Crypto mining | In force Active |
Town Board moratorium pausing special use applications for data centers, cryptocurrency mining facilities, server farms and high-density digital... (Moratorium Nation) | |
| MI | Pinconning Township | Bay County | Data centers | Adopted Extended, Jul 13, 2026 |
Data center moratorium extended — Township Board, Jul 13, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Haring Charter Township | Wexford County | Data centers | In force Active |
Board of Trustees motion adopted 2026-07-13 approving a 6-month moratorium on data center applications (no ordinance or resolution number recorded... (Moratorium Nation) Earlier item in our records: Hearing notice, Jun 30, 2026 |
|
| MI | Cooper Charter Township | Kalamazoo County | Data centers | Adopted Adopted, Jul 13, 2026 |
Data center moratorium adopted — Township Board, Jul 13, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | City of Lansing | Ingham County | Data centers | In force Active |
Chapter 878 of the city code (Moratorium Nation) | |
| OH | City of Jackson | Jackson County | Data centers | In force Active |
City of Jackson Resolution No. 19-2026 (emergency), temporary moratorium on establishing or converting structures into data centers (Moratorium Nation) | |
| OH | City of Girard | Trumbull County | Data centers | In force Active; runs to Jul 13, 2027 |
Girard City Council emergency ordinance imposing a 12-month moratorium on data center permits (passed on third reading 2026-07-13; ordinance... (Moratorium Nation) | |
| GA | Walker County | — | Data centers | In force Extended; runs to Feb 2, 2027 |
Board of Commissioners vote approving a 30-day moratorium barring acceptance of applications to locate data centers in unincorporated Walker County (Moratorium Nation) | |
| OH | Village of Middlefield | Geauga County | Data centers | In force Active |
Village of Middlefield Ordinance 26-136 (emergency), twelve-month moratorium on accepting any zoning application for data centers (Moratorium Nation) | |
| NY | Newfield Town | Tompkins County | Data centers, Crypto mining | In force Active |
Local Law Imposing a Temporary Town-Wide One Year Moratorium on Data Processing Centers, Town of Newfield, Tompkins County; the town's public Town... (Moratorium Nation) | |
| NY | Manlius Town | Onondaga County | Data centers, Crypto mining | In force Active |
Manlius Town Board local law/resolution (unanimous, 7-0) (Moratorium Nation) | |
| MI | City of Houghton | Houghton County | Data centers | In force Active |
Council-adopted moratorium (resolution/ordinance number not located; the adopted text was not found in the city's online document portal) (Moratorium Nation) | |
| NY | Canton Town | St. Lawrence County | Data centers | In force Active |
Town of Canton local law establishing a moratorium on data center development (Moratorium Nation) | |
| MI | Howard Township | Cass County | Battery storage (BESS), Data centers | Proposed Hearing notice, Jul 7, 2026 |
Hearing notice for a proposed battery storage/data center moratorium — Planning Commission, Jul 7, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NY | Clifton Park Town | Saratoga County | Data centers | In force Active |
Local Law No. 9 of 2026 (Moratorium Nation) | |
| MI | Burleigh Township | Iosco County | Data centers | Adopted Adopted, Jul 7, 2026 |
Data center moratorium adopted — Township Board, Jul 7, 2026. Source document (opens in a new tab) (Siting Radar) | |
| VA | Town of Front Royal | Warren County | Data centers | In force Active |
Resolution Establishing a Temporary Ninety (90) Day Moratorium on the Acceptance of Data Center Land Use Applications, adopted 6-0 by Front Royal... (Moratorium Nation) | |
| NC | Town of Franklin | Macon County | Data centers | In force Active |
Ordinance No. 2026-002 (Moratorium Nation) | |
| GA | Oglethorpe County | — | Data centers, Crypto mining | Ended Replaced by permanent rules |
Oglethorpe County Board of Commissioners 90-day moratorium on data center applications (added to agenda on motion of Commissioner Tracy Norman);... (Moratorium Nation) | |
| GA | Franklin County | — | Data centers | In force Active |
Franklin County Board of Commissioners moratorium on data centers (instrument number not published) (Moratorium Nation) | |
| NC | Davie County | — | Data centers | In force Active; runs to Jul 5, 2027 |
Ordinance Imposing a One-Year Moratorium on the Development of Data Centers in Davie County ('Temporary Data Center Moratorium'; unnumbered),... (Moratorium Nation) | |
| OH | City of Alliance | Stark County | Data centers | In force Active |
City Council ordinance/legislation approved 5-1 (Councilman Phillip Mastroianni opposed; Councilwoman Jennifer Kiko absent), denying permits for... (Moratorium Nation) | |
| MI | City of Adrian | Lenawee County | Data centers | Adopted Adopted, Jul 6, 2026 |
Data center moratorium adopted — City Commission, Jul 6, 2026. Source document (opens in a new tab) (Siting Radar) | |
| GA | City of Adel | Cook County | Data centers | In force Active |
Resolution No. 26-02, imposing a 180-day moratorium on accepting, processing, or considering data center site applications and issuing construction permits (Moratorium Nation) | |
| MI | Waverly Township | Van Buren County | Data centers | Adopted Adopted, Jul 2, 2026 |
Data center moratorium adopted — Planning Commission, Jul 2, 2026. Source document (opens in a new tab) (Siting Radar) | |
| 2026-07 | GA | Town of Maysville | Jackson County | Data centers | In force Active |
Maysville City Council 180-day moratorium on data center requests (instrument number not published) (Moratorium Nation) |
| 2026-07 | GA | Terrell County | — | Data centers | In force Active |
Terrell County Board of Commissioners six-month moratorium on new data centers (instrument number not published) (Moratorium Nation) |
| 2026-07 | OH | City of Upper Sandusky | Wyandot County | Data centers | In force Active |
City of Upper Sandusky council legislation (number not found) imposing a six-month moratorium on acceptance and processing of new data center... (Moratorium Nation) |
| 2026-07 | GA | City of Marietta | Cobb County | Data centers | In force Active; runs to Dec 31, 2026 |
Marietta City Council resolution/ordinance adopting a 6-month moratorium on new data centers (Moratorium Nation) |
| OH | City of Aurora | Portage County | Data centers | In force Active |
City of Aurora (Portage County) Ordinance 2026-117 (emergency), moratorium on filing, consideration and issuance of zoning/occupancy permits... (Moratorium Nation) | |
| NY | Clay Town | Onondaga County | Data centers, Crypto mining | In force Active |
Local Law No. 6 of 2026 (Town of Clay, Onondaga County), 'A Local Law providing for a Temporary Moratorium for Twelve (12) Months prohibiting any... (Moratorium Nation) | |
| MI | Forsyth Township | Marquette County | Data centers, Crypto mining | In force Active; runs to Jun 25, 2027 |
Data Center and Cryptocurrency Mining Moratorium Resolution, adopted by the Township Board on 2026-06-25 by 5-0 roll call (agenda item 10j; motion... (Moratorium Nation) | |
| NY | East Fishkill Town | Dutchess County | Data centers | In force Active; runs to Jul 1, 2029 |
Local Law No. 3 of 2026 (Town of East Fishkill), titled 'A Local Law to Extend, Consolidate and Impose a Moratorium on Certain Properties Within... (Moratorium Nation) | |
| OH | City of Xenia | Greene County | Data centers | In force Active |
City of Xenia ordinance (number not found) establishing a one-year moratorium on applications to establish, construct or convert buildings for data centers (Moratorium Nation) | |
| NY | Bethlehem Town | Albany County | Data centers | In force Active |
Local law establishing a temporary 12-month moratorium on development or construction of data centers, Town of Bethlehem, Albany County;... (Moratorium Nation) | |
| MI | Arcadia Township | Lapeer County | Data centers | Proposed Hearing notice, Jun 24, 2026 |
Hearing notice for a proposed data center moratorium — Township Board, Jun 24, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Garfield Township | Newaygo County | Data centers | Proposed Hearing notice, Jun 23, 2026 |
Hearing notice for a proposed data center moratorium — Planning Commission, Jun 23, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | City of Middleburg Heights | Cuyahoga County | Data centers | In force Active |
City of Middleburg Heights Ordinance No. 2026-42 (emergency), moratorium on filing/issuing zoning and occupancy permits for data centers, not to... (Moratorium Nation) | |
| NC | City of Asheville | Buncombe County | Data centers | In force Active |
City Council moratorium ordinance applying to new development, uses, or changes of use within NAICS 518210 or functionally equivalent facilities;... (Moratorium Nation) | |
| OH | Village of Mayfield | Cuyahoga County | Data centers | In force Active |
Mayfield Village Ordinance No. 2026-12 (emergency), 12-month temporary moratorium on rezonings, variances, conditional use permits,... (Moratorium Nation) | |
| MI | Texas Charter Township | Kalamazoo County | Data centers | In force Active |
Resolution 26-12, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) | |
| MI | Melrose Township | Charlevoix County | Data centers | Proposed Hearing notice, Jun 22, 2026 |
Hearing notice for a proposed data center moratorium — Planning Commission, Jun 22, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | City of Wickliffe | Lake County | Data centers | In force Active |
City of Wickliffe Ordinance No. 2026-39 (emergency), a moratorium on accepting, considering or issuing zoning and occupancy permits for data... (Moratorium Nation) | |
| OH | City of St. Marys | Auglaize County | Data centers | In force Active |
City Council Emergency Resolution 2026-08 (Moratorium Nation) | |
| OH | City of Broadview Heights | Cuyahoga County | Data centers, Crypto mining | In force Active |
City of Broadview Heights council resolution imposing a six-month moratorium on accepting for filing, consideration, review and approval of new... (Moratorium Nation) | |
| OH | City of Avon Lake | Lorain County | Data centers | In force Active; runs to Jun 22, 2027 |
City of Avon Lake Ordinance 26-60, a one-year moratorium on the development or construction of data centers (Moratorium Nation) | |
| MI | Marshall Township | Calhoun County | Battery storage (BESS), Data centers | Adopted Extended, Jun 18, 2026 |
Battery storage/data center moratorium extended — Township Board, Jun 18, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Prairieville Township | Barry County | Data centers | Adopted Extended, Jun 17, 2026 |
Data center moratorium extended — Township Board, Jun 17, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Montgomery Township | Ashland County | Data centers | In force Active; runs to Jun 16, 2028 |
Township trustee resolution under R.C. Chapter 519 (Moratorium Nation) | |
| OH | Village of Clinton | Summit County | Data centers | In force Active |
Resolution No. R-26-06 (Village of Clinton), a resolution implementing a moratorium on the development of data centers within the village and... (Moratorium Nation) | |
| NC | Town of Holly Springs | Wake County | Data centers, Crypto mining | In force Active; runs to Jun 16, 2027 |
Ordinance 26-19 (up to 12-month moratorium on acceptance, processing and approval of development applications for data centers, cryptocurrency... (Moratorium Nation) | |
| IN | Madison County | — | Data centers | In force Extended; runs to Jun 16, 2027 |
Ordinance 2026-BC-O-05, adopted unanimously by the Board of Commissioners, following the Plan Commission's 8-1 recommendation after a 2026-06-09... (Moratorium Nation) | |
| GA | Coweta County | — | Data centers | In force Active |
(second instrument, June 2026) Coweta County Board of Commissioners resolution imposing a 180-day moratorium on acceptance of permits, land use... (Moratorium Nation) | |
| MI | Chikaming Township | Berrien County | Data centers | In force Active |
Chikaming Township (Berrien County) Ordinance 167 (Moratorium Data Center, police-power) and Ordinance 168 (Moratorium Data Center - Zoning, under... (Moratorium Nation) | |
| OH | Butler County | — | Data centers | In force Active |
Board of County Commissioners resolution; Resolution 26-06-00963, covering unincorporated areas of Hanover, Lemon, Madison, Milford, Oxford, and... (Moratorium Nation) | |
| MI | Orion Charter Township | Oakland County | Data centers | In force Active |
Board resolution establishing a data center moratorium, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) | |
| NC | Cumberland County | — | Data centers, Crypto mining | In force Active; runs to Dec 15, 2026 |
Board of Commissioners moratorium on data center site-plan review and zoning and building permits; instrument number not located in reviewed sources (Moratorium Nation) | |
| GA | City of Milton | Fulton County | Data centers | In force Extended; runs to Jan 16, 2027 |
City Council resolution enacting a 30-day pause on data center applications and permits, subsequently extended (Moratorium Nation) | |
| GA | City of Garden City | Chatham County | Data centers, Crypto mining | In force Active |
Adopted resolution establishing an immediate six-month moratorium on new applications and permits for establishing, constructing, or expanding... (Moratorium Nation) | |
| OH | City of Berea | Cuyahoga County | Data centers | In force Active |
City Council emergency ordinance; Ordinance 6-6 (Moratorium Nation) | |
| IN | Boone County | — | Data centers | In force Active |
Board of Commissioners ordinance adopting a one-year moratorium, following the Area Plan Commission's 6-0 recommendation (first made 2026-05-06,... (Moratorium Nation) | |
| MI | Blendon Township | Ottawa County | Data centers | In force Active |
Resolution 2026-06.1, 'to Enact a Temporary Moratorium on Data Centers' (adopted 2026-06-15) (Moratorium Nation) | |
| MI | Rome Township | Lenawee County | Data centers | Adopted Adopted, Jun 11, 2026 |
Data center moratorium adopted — Township Board, Jun 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Forest Township | Genesee County | Data centers | Proposed On the agenda (before the vote), Jun 11, 2026 |
Discussion of a possible data center moratorium — Township Board, Jun 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Stronach Township | Manistee County | Data centers | In force Active; runs to Dec 31, 2026 |
Township Board resolution enacting a data center moratorium (adopted 2026-06-10; resolution number not reported) (Moratorium Nation) | |
| OH | Howland Township | Trumbull County | Data centers | In force Active; runs to Dec 7, 2026 |
Township trustee resolution under R.C. Chapter 519 (resolution number not confirmed in sources reviewed) [VERIFY] (Moratorium Nation) | |
| MI | Evergreen Township | Montcalm County | Battery storage (BESS), Data centers | Adopted Adopted, Jun 10, 2026 |
Battery storage/data center moratorium adopted — Township Board, Jun 10, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Ellsworth Township | Mahoning County | Data centers | In force Active |
Ellsworth Township (Mahoning County) Board of Trustees data center moratorium (instrument number not located) (Moratorium Nation) | |
| OH | Ashtabula Township | Ashtabula County | Data centers | In force Active |
Ashtabula Township Board of Trustees 12-month moratorium on issuing permits for data centers (resolution number not located) (Moratorium Nation) | |
| MI | Weldon Township | Benzie County | Battery storage (BESS), Data centers | Proposed On the agenda (before the vote), Jun 9, 2026 |
Discussion of a possible battery storage/data center moratorium — Township Board, Jun 9, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Sherman Township | Huron County | Data centers | In force Active |
Resolution and Ordinance 2026-0609DC, a police-power moratorium (Moratorium Nation) | |
| MI | Mecosta Township | Mecosta County | Crypto mining, Data centers | Adopted Adopted, Jun 9, 2026 |
Crypto mining/data center moratorium adopted — Township Board, Jun 9, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Matteson Township | Branch County | Battery storage (BESS), Data centers | Proposed Hearing notice, Jun 9, 2026 |
Hearing notice for a proposed battery storage/data center moratorium — Planning Commission, Jun 9, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Lincoln Charter Township | Berrien County | Data centers | In force Active |
Data center moratorium ordinance, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) | |
| MI | Hillsdale Township | Hillsdale County | Data centers, Solar, Wind, Battery storage (BESS) | In force Active |
Ordinance No. 2026-06-02, Zoning Ordinance Amendment: Temporary Moratorium Authority, Data Center Temporary Moratorium and Temporary Large... (Moratorium Nation) | |
| NY | Highland Town | Sullivan County | Data centers | In force Active |
Local Law No. 1 of 2026, 'Data Center Moratorium,' Town of Highland, Sullivan County; unanimously adopted by the Town Board on 2026-06-09... (Moratorium Nation) | |
| GA | Floyd County | — | Data centers | Ended Replaced by permanent rules |
County Commission vote approving an 80-day moratorium on data center projects (Moratorium Nation) | |
| MI | City of Allen Park | Wayne County | Data centers | In force Active |
Emergency ordinance imposing a six-month moratorium on data centers (number not located) (Moratorium Nation) | |
| MI | Norvell Township | Jackson County | Data centers | In force Active |
Norvell Township Resolution 2026-06 under Zoning Ordinance Section 16.11 Temporary Moratoriums (added by Ordinance 2026-02) (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), Feb 17, 2026 |
|
| MI | Ingersoll Township | Midland County | Data centers | Adopted Adopted, Jun 8, 2026 |
Data center moratorium adopted — Township Board, Jun 8, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | City of Geneva | Ashtabula County | Data centers | In force Active |
City of Geneva emergency ordinance imposing a 12-month moratorium on the acceptance and processing of applications for zoning and/or occupancy... (Moratorium Nation) | |
| MI | City of Flint | Genesee County | Data centers | In force Active |
City Council vote; details not confirmed beyond aggregator report in this pass (Moratorium Nation) | |
| NC | City of Charlotte | Mecklenburg County | Data centers | In force Active; runs to Nov 5, 2026 |
Ordinance Imposing a Temporary Moratorium on Acceptance, Processing, and Approval of Applications for New Telecommunications and Data Storage... (Moratorium Nation) | |
| OH | City of Bellevue | Huron County | Data centers | In force Active |
Ordinance No. 15-26 (City of Bellevue), emergency, imposing a temporary moratorium on the establishment or conversion of buildings into data... (Moratorium Nation) | |
| MI | Beaver Township | Bay County | Battery storage (BESS), Data centers | Proposed On the agenda (before the vote), Jun 8, 2026 |
Planning commission recommendation on a proposed battery storage/data center moratorium — Board of Trustees, Jun 8, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Allendale Charter Township | Ottawa County | Data centers, Battery storage (BESS), Solar, Wind | In force Active |
Ordinance 2026-07, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) | |
| MI | Maple Valley Township | Sanilac County | Data centers | Proposed Hearing notice, Jun 6, 2026 |
Hearing notice for a proposed data center moratorium — Planning Commission, Jun 6, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Village of North Perry | Lake County | Data centers | In force Active |
North Perry Village Council resolution (number not published) imposing a 12-month moratorium on granting permits for data centers (Moratorium Nation) | |
| NY | Perth Town | Fulton County | Data centers | In force Active |
Local law imposing a one-year moratorium on data center development, Town of Perth, Fulton County; full signed text not located behind the Leader... (Moratorium Nation) | |
| NY | Van Buren Town | Onondaga County | Data centers, Crypto mining | In force Active |
Local Law 2-2026 (Moratorium Nation) | |
| MI | Pine Grove Township | Van Buren County | Data centers | In force Active |
Ordinance 06-03-2026, a police-power moratorium (Moratorium Nation) | |
| MI | Filer Charter Township | Manistee County | Data centers | In force Active |
Board motion imposing a moratorium on data centers, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), May 7, 2026 |
|
| GA | Colquitt County | — | Data centers | In force Extended; runs to Feb 28, 2027 |
Colquitt County Commission moratorium on construction of data centers (and cryptocurrency mining centers under the planned ordinance), proposed by... (Moratorium Nation) | |
| NC | City of Boiling Spring Lakes | Brunswick County | Data centers, Crypto mining | In force Active |
Ordinance (temporary moratorium on data centers, data processing facilities, cryptocurrency mining operations, and associated uses); incidental... (Moratorium Nation) | |
| OH | Braceville Township | Trumbull County | Data centers | In force Active; runs to Nov 29, 2026 |
Township trustee resolution under R.C. Chapter 519 (resolution number not confirmed in sources reviewed) [VERIFY] (Moratorium Nation) | |
| MI | Batavia Township | Branch County | Data centers | Adopted Adopted, Jun 2, 2026 |
Data center moratorium adopted — Jun 2, 2026. Source document (opens in a new tab) (Siting Radar) | |
| GA | Augusta-Richmond County (County) | Data centers | Ended Replaced by permanent rules |
Augusta Commission action on a Planning and Development recommendation; 49-day moratorium adopted 2026-06-02, extended 60 days 2026-07-21.... (Moratorium Nation) | ||
| NC | Town of Whitakers | Edgecombe County | Data centers | In force Active |
Town of Whitakers data center moratorium (instrument not located) (Moratorium Nation) | |
| NC | Surry County | — | Data centers | In force Extended; runs to Jul 20, 2028 |
Ordinance Imposing a Temporary Moratorium on Development Approvals for Data Centers and Related High-Impact Facilities in All Areas Subject to... (Moratorium Nation) | |
| MI | Niles Township | Berrien County | Data centers | In force Active |
Niles Charter Township Board moratorium on granting permits for data centers (instrument number not located); companion zoning-ordinance... (Moratorium Nation) | |
| OH | City of Hubbard | Trumbull County | Data centers | In force Active; runs to Jun 1, 2027 |
City Council emergency ordinance (ordinance number not confirmed in sources reviewed) [VERIFY] (Moratorium Nation) | |
| OH | City of Grove City | Franklin County | Data centers | In force Active |
City Council emergency ordinance; Ordinance C-22-26, passed 6-1 (Moratorium Nation) | |
| OH | City of Cortland | Trumbull County | Data centers | In force Active; runs to Jun 1, 2027 |
City Council emergency ordinance (ordinance number not confirmed in sources reviewed) [VERIFY] (Moratorium Nation) | |
| 2026-06 | OH | Washington Township | Pickaway County | Data centers | In force Active |
Washington Township (Pickaway County) Board of Trustees data center moratorium (instrument not seen; legal notice at publicnoticesohio.com ID 297107) (Moratorium Nation) |
| 2026-06 | OH | City of Brooklyn | Cuyahoga County | Data centers | In force Active |
City of Brooklyn Resolution 2026-21 (emergency) imposing a 180-day moratorium on building permits / certificates of occupancy for data centers (Moratorium Nation) |
| OH | Madison Township | Lake County | Data centers | In force Active |
Madison Township (Lake County) Board of Trustees Resolution #26-074, a 12-month moratorium on establishing, permitting, approving, locating,... (Moratorium Nation) | |
| OH | Village of Carrollton | Carroll County | Data centers | In force Active |
Village of Carrollton Ordinance No. 2026-10, 'An Ordinance Authorizing a Moratorium on Data Centers in the Village of Carrollton' (effective at... (Moratorium Nation) | |
| NC | Town of Hillsborough | Orange County | Data centers, Crypto mining | In force Extended; runs to May 27, 2027 |
Ordinance 20260527-5.A (initial 60-day term, adopted 2026-05-27); extended by Ordinance #20260622-5.A, adopted 3-0 on 2026-06-22 after a public... (Moratorium Nation) | |
| NY | Salina Town | Onondaga County | Data centers, Crypto mining | In force Active |
Local Law No. 5 of 2026 (Moratorium Nation) | |
| MI | Huron County | — | Data centers | In force Active |
Huron County Zoning Ordinance Text Amendment ZA 2026-02 (adding Article XV, Section 15.02.13, 'Data Center Moratorium'). The Planning Commission's... (Moratorium Nation) | |
| MI | Cascade Charter Township | Kent County | Data centers, Crypto mining | In force Active |
Resolution 024-2026, 'A Resolution Imposing a Six (6) Month Temporary Moratorium on Data Centers and Cryptocurrency Mining Facilities' (adopted... (Moratorium Nation) | |
| IN | Town of Merrillville | Lake County | Data centers | In force Active |
Town Council vote (7-0) imposing a one-year moratorium on data center project approvals; ordinance or resolution number not captured in sources reviewed (Moratorium Nation) | |
| GA | Hart County | — | Data centers | In force Active |
Board of Commissioners vote (5-0) imposing a 180-day moratorium on construction of data centers (Moratorium Nation) | |
| MI | Elba Township | Lapeer County | Data centers | Adopted Adopted, May 26, 2026 |
Data center moratorium adopted — Township Board, May 26, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | City of Hart | Oceana County | Data centers, Crypto mining | In force Active |
Ordinance 2026-02, adding Section 1242.07 to the city code (Moratorium Nation) | |
| NY | Southeast Town | Putnam County | Data centers | In force Active |
Local Law No. 3 of 2026 (Moratorium Nation) | |
| MI | Penn Township | Cass County | Data centers | In force Active |
Township Board non-zoning (general law) data center moratorium ordinance (number not located) (Moratorium Nation) | |
| MI | Jefferson Township | Cass County | Battery storage (BESS), Data centers | Adopted Adopted, May 21, 2026 |
Battery storage/data center moratorium adopted — Township Board, May 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | City of Wilson | Wilson County | Data centers, Crypto mining, Battery storage (BESS) | In force Active; runs to May 21, 2027 |
City Council moratorium ordinance; ordinance number not located in reviewed sources (Moratorium Nation) | |
| MI | Washington Charter Township | Macomb County | Data centers | In force Active |
Resolution 2026-14, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) | |
| NY | Thurston Town | Steuben County | Data centers, Crypto mining | In force Active |
Resolution 20 and Local Law No. 5 of 2026 (Moratorium Nation) | |
| OH | Hamilton Township | Warren County | Data centers | In force Active; runs to May 20, 2027 |
Hamilton Township (Warren County) Trustee Resolution 26-0520B (emergency) under limited home-rule and R.C. 519.02 (Moratorium Nation) | |
| OH | City of Niles | Trumbull County | Data centers | In force Active |
Emergency ordinance of Niles City Council placing a 180-day moratorium on granting/issuing permits and receiving/processing applications for data... (Moratorium Nation) | |
| OH | City of New Franklin | Summit County | Data centers | In force Active |
Resolution No. 26-R-28 (City of New Franklin), declaring a 6-month stay on the filing, consideration, review and/or approval of all new... (Moratorium Nation) | |
| MI | City of Melvindale | Wayne County | Data centers | In force Active |
Melvindale City Council moratorium on data center reviews and approvals (instrument number and term not located) (Moratorium Nation) | |
| MI | Arlington Township | Van Buren County | Data centers | Adopted Adopted, May 20, 2026 |
Data center moratorium adopted — Township Board, May 20, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Village of Grafton | Lorain County | Data centers | In force Active; runs to May 18, 2031 |
Village Council emergency ordinance 'Establishing a Temporary Moratorium on Data Center Development in the Village of Grafton' (on the 2026-05-19... (Moratorium Nation) | |
| NC | Town of Woodfin | Buncombe County | Data centers | In force Active |
Ordinance 2026-04 (Moratorium Nation) | |
| NC | Town of Garner | Wake County | Data centers, Crypto mining | In force Active |
Ordinance No. (2026) 5383, An Ordinance Instituting a Temporary Moratorium on the Permitting and Issuance of Development Approvals for Data... (Moratorium Nation) | |
| MI | Meridian Charter Township | Ingham County | Data centers | In force Active |
Board of Trustees resolution, unanimous vote; specific resolution number not confirmed in this pass (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), May 7, 2026 |
|
| MI | Watertown Township | Tuscola County | Data centers | In force Active |
Resolution 5-18-2026-1, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) | |
| OH | Village of Yellow Springs | Greene County | Data centers | In force Active |
Village Council emergency ordinance; Ordinance 2026-08 (Moratorium Nation) | |
| NC | Town of Bailey | Nash County | Data centers | In force Active |
Board of Commissioners moratorium on accepting, processing, or approving data center applications in the town and its extraterritorial... (Moratorium Nation) | |
| NC | Pasquotank County | — | Data centers, Crypto mining | In force Active |
Board of Commissioners moratorium ordinance; N.C.G.S. 160D-107 (implied) (Moratorium Nation) | |
| OH | City of North Ridgeville | Lorain County | Data centers, Crypto mining | In force Active |
City of North Ridgeville Ordinance No. 2026-57 (emergency), a 12-month moratorium on planning, zoning and building approvals for data centers,... (Moratorium Nation) | |
| NY | Oneonta Town | Otsego County | Data centers, Crypto mining | In force Active |
Proposed local law: "Moratorium on the Development, Construction, and Operation of Data Centers and Commercial Cryptocurrency Mining Operations" (Moratorium Nation) | |
| MI | Park Township | St. Joseph County | Data centers | In force Active |
Park Township (St. Joseph County) Ordinance #26-02, Temporary Moratorium on Data Centers, approved by the Township Board 2026-05-13 (motion Ed... (Moratorium Nation) | |
| MI | Jerome Township | Midland County | Data centers | Adopted Adopted, May 13, 2026 |
Data center moratorium adopted — Township Board, May 13, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Williams Charter Township | Bay County | Data centers | In force Active |
Williams Charter Township (Bay County) Ordinance No. 33-202, Declaring a Moratorium on Data Center Review, Approval and Construction (zoning... (Moratorium Nation) Earlier item in our records: Hearing notice, Mar 17, 2026 |
|
| OH | Village of South Point | Lawrence County | Data centers | In force Active |
Village of South Point ordinance (number not published), a six-month moratorium on AI data centers, passed on third reading (Moratorium Nation) | |
| MI | South Branch Township | Crawford County | Data centers | Adopted Adopted, May 12, 2026 |
Data center moratorium adopted — Board of Trustees, May 12, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Porter Township | Cass County | Data centers | In force Active |
Data Center Nonzoning Ordinance, under the Michigan Zoning Enabling Act (PA 110 of 2006) and township police power (Moratorium Nation) | |
| OH | Painesville Township | Lake County | Data centers | In force Active |
Painesville Township Trustee Resolution 2026-057, an immediate zoning moratorium for data center uses (township zoning under R.C. 519) (Moratorium Nation) | |
| MI | Morton Township | Mecosta County | Data centers | Adopted Adopted, May 12, 2026 |
Data center moratorium adopted — May 12, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Lyndon Township | Washtenaw County | Data centers | In force Active |
Resolution 26-06, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) | |
| OH | Jackson Township | Franklin County | Data centers | In force Active |
Resolution 2026-049, "Data Center Moratorium," Jackson Township Board of Trustees, 3756 Hoover Road, Grove City, Ohio 43123 (Moratorium Nation) | |
| MI | Hadley Township | Lapeer County | Data centers | Adopted Adopted, May 12, 2026 |
Data center moratorium adopted — Township Board, May 12, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Green Lake Township | Grand Traverse County | Data centers, General / multiple uses | In force Active |
Ordinance No. 5122026.2, 'An Ordinance to Enact a Temporary Moratorium' (adopted 2026-05-12, effective 2026-05-16); a companion zoning-based... (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), Apr 14, 2026 |
|
| OH | Bazetta Township | Trumbull County | Data centers | In force Active |
Trustee Resolution 085-26 imposing a 180-day moratorium on the acceptance of applications, permitting and construction of data centers in Bazetta... (Moratorium Nation) | |
| NC | Town of Mayodan | Rockingham County | Data centers, Crypto mining, Solar | Ended Replaced by permanent rules |
Ordinance Establishing a Temporary Moratorium on Development Approvals for Data Centers and Other High-Impact Facilities, and Ordinance... (Moratorium Nation) | |
| MI | Lincoln Township | Clare County | Data centers | Adopted Adopted, May 11, 2026 |
Data center moratorium adopted — Township Board, May 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Fraser Township | Bay County | Data centers | Adopted Adopted, May 11, 2026 |
Data center moratorium adopted — Township Board, May 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Escanaba Township | Delta County | Data centers | Adopted Adopted, May 11, 2026 |
Data center moratorium adopted — Township Board, May 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| GA | City of Kingsland | Camden County | Data centers | In force Active |
City Council 'Data Center Ordinance Rescission and Moratorium Ordinance' (approved 2026-05-11, passed as amended, unanimous), rescinding Ordinance... (Moratorium Nation) | |
| NY | Lysander Town | Onondaga County | Data centers | In force Active; runs to Nov 7, 2026 |
Local Law No. 4 of 2026, 'A Local Law Establishing a Temporary Six Month Moratorium on Development or Construction of Data Storage Facilities... (Moratorium Nation) | |
| MI | Chesaning Township | Saginaw County | Data centers | In force Active |
Ordinance 26-001, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) | |
| OH | City of Ontario | Richland County | Data centers | In force Active |
Ordinance No. 26-13 (City of Ontario), emergency, imposing a six-month moratorium on applications for licensing, zoning, occupancy or other... (Moratorium Nation) | |
| OH | St. Clair Township | Butler County | Data centers | In force Active |
St. Clair Township (Butler County) Board of Trustees resolution imposing a one-year moratorium on data centers (number not located) (Moratorium Nation) | |
| IN | Fayette County | — | Data centers | In force Active |
Fayette County Commissioners ordinance pausing data center approvals for one year to allow the Area Plan Commission to develop zoning regulations (Moratorium Nation) | |
| GA | Camden County | — | Data centers | In force Active; runs to Nov 1, 2026 |
Camden County Board of Commissioners resolution adopting a 6-month moratorium on data centers, adopted May 5, 2026 with the exclusion of sections... (Moratorium Nation) | |
| OH | Village of Waynesville | Warren County | Data centers | In force Active; runs to Oct 31, 2026 |
Village of Waynesville Ordinance No. 2026-020 (emergency): temporary moratorium on acceptance, processing and approval of applications for... (Moratorium Nation) | |
| OH | Village of Lakeview | Logan County | Data centers | In force Active |
Village of Lakeview (Logan County) Resolution No. 2026-07, a resolution to enact a twelve-month moratorium on the receipt, processing, issuance or... (Moratorium Nation) | |
| OH | Village of Commercial Point | Pickaway County | Data centers | In force Active |
Village of Commercial Point Ordinance 2026-09, 18-month moratorium on data center development under R.C. 715.01 and 713.02, declared an emergency (Moratorium Nation) | |
| NC | Town of Spring Hope | Nash County | Data centers | In force Active |
Resolution 2026-01, imposing a one-year pause on data centers within the town and its extraterritorial jurisdiction (Moratorium Nation) | |
| NC | Northampton County | — | Data centers, Crypto mining | In force Active |
Board of Commissioners moratorium ordinance covering unincorporated areas; ordinance/resolution number not located in reviewed sources; N.C.G.S.... (Moratorium Nation) | |
| IN | Miami County | — | Data centers | Ended Replaced by permanent rules |
Ordinance Imposing Temporary Moratorium On The Development of Data Centers, adopted and recorded by the Board of Commissioners (Moratorium Nation) | |
| NC | Harnett County | — | Data centers, Crypto mining | In force Active; runs to May 4, 2027 |
Ordinance 2026-17, An Ordinance of the County of Harnett Imposing a Temporary Moratorium on Development Approvals for Data Centers (covers data... (Moratorium Nation) | |
| NC | City of Durham | Durham County | Data centers, Crypto mining | In force Extended; runs to May 3, 2027 |
Initial ordinance imposing a temporary moratorium on development approvals for data centers, cryptocurrency mining operations and any use... (Moratorium Nation) | |
| OH | City of Bucyrus | Crawford County | Data centers | In force Active |
City of Bucyrus Ordinance No. 28-2026, 'An Ordinance Implementing a Moratorium on the Development of Data Centers within the City of Bucyrus,... (Moratorium Nation) | |
| MI | Brandon Charter Township | Oakland County | Data centers | In force Extended; runs to Apr 29, 2027 |
Resolution #424-26, Resolution Declaring Temporary Moratorium on the Acceptance of Applications and Site Plan Review for Establishment of Data... (Moratorium Nation) | |
| MI | Mason Township | Cass County | Data centers | In force Active |
Ordinance 2026-01, adopted at a special meeting by 5-0 roll-call vote, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation) | |
| MI | Leoni Township | Jackson County | Data centers | Proposed On the agenda (before the vote), May 1, 2026 |
Discussion of a possible data center moratorium — Township Board, May 1, 2026. Source document (opens in a new tab) (Siting Radar) | |
| 2026-05 | OH | Windham Township | Portage County | Data centers | In force Active |
Windham Township (Portage County) Board of Trustees motion approving a moratorium on AI data centers; resolution number and text not found (Moratorium Nation) |
| 2026-05 | OH | Swan Creek Township | Fulton County | Data centers, Solar | In force Active; runs to Nov 5, 2026 |
Swancreek Township (Fulton County) Board of Trustees motion/resolution imposing a six-month moratorium on zoning permits for data centers and... (Moratorium Nation) |
| 2026-05 | MI | Lyon Township | Roscommon County | Data centers | In force Active |
Township-adopted moratorium on new data center applications; specific resolution/ordinance number not confirmed in this pass (Moratorium Nation) |
| 2026-05 | MI | Lyon Charter Township | Oakland County | Data centers | In force Active |
Township-adopted moratorium on new data center applications; specific resolution/ordinance number not confirmed in this pass (Moratorium Nation) |
| OH | Weathersfield Township | Trumbull County | Data centers | In force Extended; runs to Apr 25, 2027 |
Weathersfield Township (Trumbull County) trustee resolution under R.C. 519 imposing a six-month moratorium on building, zoning or approval of data... (Moratorium Nation) | |
| MI | Frenchtown Township | Monroe County | Data centers, General / multiple uses | In force Active |
Zoning Ordinance No. 300-19, interim/temporary zoning ordinance amendment establishing a temporary moratorium as to Technology Uses, Data Center... (Moratorium Nation) Earlier item in our records: Hearing notice, Apr 1, 2026 |
|
| OH | Boardman Township | Mahoning County | Data centers | In force Active |
Boardman Township (Mahoning County) Board of Trustees one-year data center moratorium (resolution number not located) (Moratorium Nation) | |
| OH | Lake Township | Stark County | Data centers | In force Active |
Lake Township (Stark County) Trustee Resolution 26-177, six-month moratorium on the operation/location of any new data center (Moratorium Nation) | |
| OH | City of Streetsboro | Portage County | Data centers, Crypto mining | In force Active |
Ordinance No. 2026-70 (T-7990), emergency, placing a temporary moratorium on planning, zoning and building permits, approvals and certificates for... (Moratorium Nation) | |
| GA | City of Calhoun | Gordon County | Data centers | In force Extended; runs to Jan 25, 2027 |
Calhoun City Council resolution (adopted unanimously 2026-04-27) halting all applications for zoning decisions, land disturbance permits and... (Moratorium Nation) | |
| MI | Webster Township | Washtenaw County | Data centers, Battery storage (BESS) | In force Active |
Ordinance No. 26-02, Ordinance Establishing Data Center and Battery Energy Storage System Moratorium (Police Power) (Moratorium Nation) | |
| NC | Watauga County | — | Data centers | In force Active; runs to Apr 21, 2027 |
County data center moratorium proposed under N.C.G.S. 160D-107. [Evidence ceiling: Watauga County's BOC agendas/minutes archives at... (Moratorium Nation) | |
| NC | Swain County | — | Data centers | In force Active |
County moratorium ordinance on permitting and development approvals for data centers and other high-impact facilities, agenda voting item V(a) for... (Moratorium Nation) | |
| MI | Sherman Township | Mason County | Data centers | Adopted Adopted, Apr 21, 2026 |
Data center moratorium adopted — Township Board, Apr 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Richfield Township | Roscommon County | Data centers | Adopted Adopted, Apr 21, 2026 |
Data center moratorium adopted — Township Board, Apr 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | Orange County | — | Data centers, Crypto mining | In force Active |
Ordinance establishing one-year moratorium on large-scale data centers; N.C.G.S. 160D-107 (Moratorium Nation) | |
| MI | Exeter Township | Monroe County | Data centers | Adopted Adopted, Apr 21, 2026 |
Data center moratorium adopted — Township Board, Apr 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | City of Findlay | Hancock County | Data centers | In force Active |
Ordinance 2026-042 (Moratorium Nation) | |
| MI | Bingham Township | Clinton County | Data centers | Proposed On the agenda (before the vote), Apr 21, 2026 |
Discussion of a possible data center moratorium — Board of Commissioners, Apr 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Washington Township | Montgomery County | Data centers | In force Active |
Washington Township (Montgomery County) Board of Trustees resolution prohibiting issuance/processing of zoning permits and approvals for data... (Moratorium Nation) | |
| NC | Rowan County | — | Data centers | In force Active |
Adopted under N.C.G.S. 160D-107 following Legislative Hearing Notice issued April 6, 2026 by Clerk Sarah Pack; the Notice expressly limits the... (Moratorium Nation) | |
| OH | City of Vermilion | Lorain County | Data centers | In force Active; runs to Mar 23, 2027 |
Ordinance 2026-17 (Moratorium Nation) | |
| OH | City of Vandalia | Montgomery County | Data centers | In force Active |
City of Vandalia Resolution 26-R-27, temporary moratorium on acceptance, consideration and/or granting of zoning, occupancy or other permits or... (Moratorium Nation) | |
| OH | City of Tiffin | Seneca County | Data centers | In force Active |
Resolution 2026-42 (sharpened from "unnumbered ordinance" — confirmed via tiffinohio.net reporting) (Moratorium Nation) | |
| OH | City of Ravenna | Portage County | Data centers, Crypto mining | In force Active |
City Council ordinance/paperwork reported by Record-Courier [CITE primary text not captured] (Moratorium Nation) | |
| MI | City of Lapeer | Lapeer County | Data centers | In force Active |
Resolution # 2026-05, Data Center Moratorium (Moratorium Nation) | |
| MI | Casco Township | Allegan County | Battery storage (BESS), Solar, Data centers | In force Active |
Casco Township Board Resolution to Establish a Moratorium on the Issuance of Zoning Permits for Battery Energy Storage Systems, Solar Energy... (Moratorium Nation) | |
| OH | Brimfield Township | Portage County | Data centers | In force Active |
Brimfield Township (Portage County) Board of Trustees resolution (Motion #2026-177), six-month moratorium on the operation/location of any new data center (Moratorium Nation) | |
| NC | Town of Clyde | Haywood County | Data centers | In force Active |
Town moratorium under N.C.G.S. 160D-107: "Town shall not accept, process or approve any application for zoning permits, conditional use permits,... (Moratorium Nation) | |
| OH | Providence Township | Lucas County | Data centers | In force Active |
Trustee action using Waterville Township language, per Toledo Free Press [CITE primary text not captured] (Moratorium Nation) | |
| OH | Prairie Township | Franklin County | Data centers | In force Active; runs to Oct 15, 2026 |
Prairie Township (Franklin County) Trustee Resolution No. 18-26, six-month moratorium on zoning permits for data centers (Moratorium Nation) | |
| OH | City of Sunbury | Delaware County | Data centers | In force Active; runs to Jan 31, 2027 |
City of Sunbury Resolution No. 2026.12, temporary moratorium on data centers (permits, certificates of use, development plans, rezoning to L-I)... (Moratorium Nation) | |
| OH | City of Kent | Portage County | Data centers | In force Active |
Ordinance 2026-31 (Moratorium Nation) | |
| NC | Town of Apex | Wake County | Data centers, Crypto mining | In force Active |
Town-wide moratorium noticed under N.C.G.S. 160D-107 and 160D-601; covers acceptance, processing, and approval of development applications for... (Moratorium Nation) | |
| GA | Stephens County | — | Data centers | In force Extended; runs to Oct 14, 2026 |
Board of Commissioners vote extending the moratorium barring acceptance of land-use applications for data centers (Moratorium Nation) | |
| GA | Decatur County | — | Data centers | In force Active |
Decatur County Board of Commissioners moratorium adopted at the April 14, 2026 regular meeting. Per the county's signed minutes: County Attorney... (Moratorium Nation) | |
| OH | City of Twinsburg | Summit County | Data centers | In force Active |
Ordinance No. 2026-065 (City of Twinsburg), emergency, establishing a moratorium on accepting for filing and issuing zoning and/or occupancy... (Moratorium Nation) | |
| OH | City of Avon | Lorain County | Data centers | In force Active; runs to Apr 14, 2027 |
Ordinance 37-26 (text confirmed via cityofavon.com PDF capture) (Moratorium Nation) | |
| MI | Ashland Township | Newaygo County | Data centers | Adopted Extended, Apr 14, 2026 |
Data center moratorium extended — Township Board, Apr 14, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | Town of Wendell | Wake County | Data centers, Crypto mining | In force Active; runs to Dec 31, 2026 |
Town moratorium on acceptance/processing of development applications for data centers, data processing facilities, and cryptocurrency mining;... (Moratorium Nation) | |
| OH | Shawnee Township | Allen County | Data centers, Battery storage (BESS), Solar | In force Active |
Trustee resolution reported by WLIO [CITE primary text not captured] (Moratorium Nation) | |
| NY | Lewiston Town | Niagara County | Data centers, Crypto mining | In force Active; runs to Oct 13, 2027 |
Local Law No. 3 of 2026, 'A Local Law Imposing a Moratorium on the Establishment, Construction, Expansion, or Operation of Data Centers,... (Moratorium Nation) | |
| IN | DeKalb County | — | Data centers | In force Active |
Zoning ordinance amendment adopted by unanimous Board of Commissioners vote on 2026-04-13, following unanimous Plan Commission favorable... (Moratorium Nation) | |
| OH | City of Tallmadge | Summit County | Data centers | In force Active |
Ordinance 2026-38 (Moratorium Nation) | |
| OH | City of Rittman | Wayne County | Data centers | In force Active |
City of Rittman Ordinance No. 8519 (declared an emergency): 180-day moratorium on receipt, processing, issuance and approval of zoning... (Moratorium Nation) | |
| OH | Canton Township | Stark County | Data centers | In force Active |
Trustee resolution drafted by township law director [CITE primary text not captured] (Moratorium Nation) | |
| MI | New Buffalo Township | Berrien County | Data centers | In force Active |
Township Board resolution halting permits, licenses, and approvals for data centers (number not located) (Moratorium Nation) | |
| OH | Village of Ada | Hardin County | Data centers, Crypto mining | In force Extended; runs to Sep 1, 2027 |
Village of Ada Resolution 2026-101 (emergency) imposing a temporary moratorium on data centers and cryptocurrency mining centers; extended by... (Moratorium Nation) | |
| MI | Delhi Charter Township | Ingham County | Data centers | Proposed On the agenda (before the vote), Apr 7, 2026 |
Discussion of a possible data center moratorium — Township Board, Apr 7, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Clay Township | Montgomery County | Data centers | In force Active |
Clay Township (Montgomery County) Trustee Resolution 2026-016 under R.C. 519.01, 519.02, 519.12 (Moratorium Nation) | |
| OH | Washington Township | Stark County | Data centers | In force Active |
Board of Trustees resolution (township zoning, R.C. Chapter 519) placing a twelve-month moratorium on any new data centers; resolution number not given (Moratorium Nation) | |
| OH | Village of Archbold | Fulton County | Data centers | In force Extended; runs to Apr 6, 2027 |
Resolution No. 2026-16 (temporary moratorium on data centers, advanced manufacturing facilities and technology storage facilities, adopted... (Moratorium Nation) | |
| OH | City of Massillon | Stark County | Data centers | Ended Replaced by permanent rules |
City Council ordinance [CITE primary text not captured] (Moratorium Nation) | |
| OH | Trenton Township | Delaware County | Data centers | In force Active |
Trenton Township Board of Trustees resolution imposing a temporary moratorium on zoning certificates, site plans and development applications for... (Moratorium Nation) | |
| MI | Whiteford Township | Monroe County | Battery storage (BESS), Solar, Wind, Data centers | Proposed Hearing notice, Mar 31, 2026 |
Hearing notice for a proposed battery storage/solar/wind moratorium — Planning Commission, Mar 31, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Monitor Charter Township | Bay County | Data centers | In force Active |
Charter Township of Monitor Ordinance 67-U, Declaring a Moratorium on Data Center Construction and Approval for a period of one year (zoning... (Moratorium Nation) Earlier item in our records: Hearing notice, Mar 17, 2026 |
|
| MI | City of Luna Pier | Monroe County | Data centers | Proposed On the agenda (before the vote), Mar 26, 2026 |
Discussion of a possible data center moratorium — Mar 26, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Summit Township | Jackson County | Data centers | Adopted Adopted, Mar 24, 2026 |
Data center moratorium adopted — Township Board, Mar 24, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Plain Township | Stark County | Data centers | In force Active |
Trustee resolution [CITE primary text not captured] (Moratorium Nation) | |
| MI | Northfield Township | Washtenaw County | Data centers | Proposed On the agenda (before the vote), Mar 24, 2026 |
Discussion of a possible data center moratorium — Township Board, Mar 24, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | City of Wixom | Oakland County | Data centers | Ended Replaced by permanent rules |
Resolution No. 2026-06 (moratorium); repealed by Resolution 2026-47 (2026-08-25, 7-0) effective when Ordinance No. 2026-01 took effect on 2026-09-06 (Moratorium Nation) | |
| MI | Waterford Charter Township | Oakland County | Data centers | In force Active; runs to Oct 1, 2026 |
Zoning Ordinance 2026-Z-003 and companion Resolution Establishing a Moratorium on the Approval of New Data Centers (Moratorium Nation) | |
| NC | Town of Boone | Watauga County | Data centers, Crypto mining | In force Active |
Town ordinance banning development of data centers and cryptocurrency mining operations for one year, adopted after public hearing process under... (Moratorium Nation) | |
| GA | City of Cedartown | Polk County | Data centers | In force Active |
Cedartown City Commission Resolution 4, 2026, adopted March 23, 2026 (unanimous). (Moratorium Nation) | |
| MI | Bridgeton Township | Newaygo County | Data centers | Adopted Adopted, Mar 23, 2026 |
Data center moratorium adopted — Township Board, Mar 23, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Locke Township | Ingham County | Data centers | Ended Rescinded, Mar 19, 2026 |
Data center moratorium rescinded — Township Board, Mar 19, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Freedom Township | Portage County | Data centers | In force Active |
Freedom Township (Portage County) Board of Trustees motion 03.18.26.04 imposing a one-year moratorium on data centers (no separate resolution text located) (Moratorium Nation) | |
| MI | Leroy Township | Ingham County | Data centers | Adopted Adopted, Mar 18, 2026 |
Data center moratorium adopted — Township Board, Mar 18, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Colfax Township | Huron County | Data centers | In force Active |
Board of Trustees moratorium resolution (number not located) (Moratorium Nation) | |
| GA | Heard County | — | Data centers | Ended Expired |
Board of Commissioners Resolution (Moratorium Nation) | |
| MI | City of East Lansing | Ingham County | Data centers | In force Extended; runs to Mar 17, 2027 |
City Council moratorium action of 2026-03-17 and extension of 2026-08-11 (instrument numbers not located) (Moratorium Nation) | |
| OH | Village of Wellington | Lorain County | Data centers | In force Active |
Ordinance 2026-07 (Village of Wellington), temporarily halting issuance of zoning certificates for data processing and hosting facilities (Moratorium Nation) | |
| MI | Stockbridge Township | Ingham County | Data centers | In force Active |
Ordinance No. 26-02, adopted by Resolution No. 02, 'Resolution to Adopt an Ordinance to Impose a Moratorium on the Issuance of Permits, Licenses,... (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), Feb 16, 2026 |
|
| IN | Grant County | — | Data centers | In force Active; runs to Mar 16, 2028 |
Ordinance 4-2026, adopted unanimously by the Grant County Board of Commissioners on 2026-03-16, citing IC 36-7-2-8 and IC 36-8-4-603 (Moratorium Nation) | |
| MI | Frankenmuth Township | Saginaw County | Data centers | Adopted Adopted, Mar 16, 2026 |
Data center moratorium adopted — Township Board, Mar 16, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Comstock Charter Township | Kalamazoo County | Data centers | In force Active |
Charter Township of Comstock Ordinance No. 565, temporary moratorium on data centers (PA 359 of 1947) (Moratorium Nation) | |
| NC | City of Brevard | Transylvania County | Data centers | Ended Replaced by permanent rules |
City Council moratorium on data centers and similar high-intensity land uses adopted under N.C.G.S. 160D-107 (Brevard's land-use authority); March... (Moratorium Nation) | |
| OH | Village of Williamsburg | Clermont County | Data centers | In force Active |
Ordinance 1249-26, "An Ordinance Imposing a Moratorium on the Authorization or Establishment of Computer Data Centers within the Village of... (Moratorium Nation) | |
| OH | Village of Blanchester | Clinton County | Data centers | In force Active |
Ordinance 2026.007, "Ordinance Establishing Data Center Moratorium" (Moratorium Nation) | |
| MI | Onondaga Township | Ingham County | Data centers | Adopted Adopted, Mar 12, 2026 |
Data center moratorium adopted — Township Board, Mar 12, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Rose Township | Oakland County | Data centers | Proposed On the agenda (before the vote), Mar 11, 2026 |
Discussion of a possible data center moratorium — Township Board, Mar 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Cascade Charter Township | Kent County | Data centers | Ended Expired |
Ordinance No. 002 of 2026, 'An Ordinance to Impose a Moratorium on the Issuance of Permits, Licenses or Approvals for Data Centers' (adopted by... (Moratorium Nation) | |
| MI | York Charter Township | Washtenaw County | Data centers | In force Extended; runs to Mar 13, 2027 |
York Charter Township Ordinance No. 167, Data Center Moratorium Ordinance (first reading 2026-02-10, adopted 2026-03-10, effective 2026-03-18);... (Moratorium Nation) | |
| MI | Sands Township | Marquette County | Data centers | Proposed On the agenda (before the vote), Mar 10, 2026 |
Discussion of a possible data center moratorium — Township Board, Mar 10, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Oshtemo Charter Township | Kalamazoo County | Data centers | In force Active |
Oshtemo Charter Township Ordinance No. 688, Commercial Data Centers General Moratorium Ordinance (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), Nov 25, 2025 |
|
| MI | Freedom Township | Washtenaw County | Data centers | In force Active |
Freedom Township Ordinance No. 56, Data Center Moratorium (PA 246 of 1945) (Moratorium Nation) | |
| MI | Aurelius Township | Ingham County | Data centers | Adopted Adopted, Mar 10, 2026 |
Data center moratorium adopted — Township Board, Mar 10, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Conway Township | Livingston County | Data centers | Proposed Hearing notice, Mar 9, 2026 |
Hearing notice for a proposed data center moratorium — Planning Commission, Mar 9, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | City of Rochester Hills | Oakland County | Data centers | In force Extended; runs to Mar 4, 2027 |
Ordinance No. 201 (adds Sec. 138-5.301 Temporary Moratorium for Data Centers to Chapter 138 Zoning); extended by City Council action on 2026-08-10... (Moratorium Nation) | |
| MI | City of Gibraltar | Wayne County | Data centers | In force Active |
City Council Resolution #26-072, Resolution Imposing a Temporary Moratorium for a period of twelve (12) months on data centers (Moratorium Nation) | |
| OH | Spencer Township | Lucas County | Data centers | In force Active |
Resolution 2026-03-05, imposing a 12-month moratorium on 'the approval, establishment or construction of advanced manufacturing facilities or... (Moratorium Nation) | |
| OH | Scioto Township | Pickaway County | Data centers | In force Active |
Trustee resolution reported by Scioto Post [CITE: resolution number not posted to township website 2026-04-29] (Moratorium Nation) | |
| MI | Bridgewater Township | Washtenaw County | Data centers | In force Active |
Bridgewater Township Resolution Instituting a Temporary Moratorium on Approval of Data Centers (number not stated) (Moratorium Nation) | |
| OH | Vermilion Township | Erie County | Data centers | In force Active |
Vermilion Township (Erie County) Trustee Resolution 2026-06, twelve-month moratorium on receiving, processing, issuing or approving zoning permits... (Moratorium Nation) | |
| MI | Zeeland Charter Township | Ottawa County | Data centers | Ended Rescinded |
Resolution No. 1027 (Zeeland Charter Township Board, 2026-03-03), temporary moratorium on data centers; repealed by the 2026-09-01 'Resolution... (Moratorium Nation) | |
| OH | Village of Richfield | Summit County | Data centers | In force Extended; runs to Mar 2, 2027 |
Ordinance No. 18-2026 (Village of Richfield), 180-day moratorium on zoning certificates for NAICS 518 data processing, hosting and related... (Moratorium Nation) | |
| OH | Village of Mount Orab | Brown County | Data centers | In force Extended |
Village council ordinance [CITE: ordinance number not posted on Mt.Orab village website 2026-04-29; village site has minimal online presence] (Moratorium Nation) | |
| GA | Polk County | — | Data centers | Ended Replaced by permanent rules |
Board of Commissioners action item 2 of 2026-03-03 Regular Meeting: "Consider an Ordinance Amendment to add 'Chapter 33 – Data Centers' to the... (Moratorium Nation) | |
| OH | Lake Township | Wood County | Data centers | In force Active |
Trustee action reported by The Press/Muck Rack excerpt [CITE primary text not captured] (Moratorium Nation) | |
| MI | City of Ypsilanti | Washtenaw County | Data centers | In force Active |
City Council Resolution No. 2026-046A (365-day moratorium); emergency Ordinances No. 1457 (2026-03-03), No. 1461 (2026-04-21) and No. 1472... (Moratorium Nation) | |
| OH | City of Urbana | Champaign County | Data centers | In force Active |
City of Urbana emergency legislation imposing a 12-month moratorium on new data centers (ordinance number not located) (Moratorium Nation) | |
| GA | Carroll County | — | Data centers, Battery storage (BESS), Solar | In force Extended; runs to Nov 12, 2026 |
Carroll County Board of Commissioners resolution adopted March 3, 2026, applicable only to unincorporated Carroll County; extension resolution... (Moratorium Nation) | |
| OH | Sprigg Township | Adams County | Data centers | In force Active |
Trustee action reported by WCPO [CITE primary text not captured] (Moratorium Nation) | |
| OH | Jackson Township | Clermont County | Data centers | In force Active |
Jackson Township (Clermont County) Board of Trustees resolution establishing a 12-month moratorium on data center development; resolution number... (Moratorium Nation) | |
| IN | Fulton County | — | Data centers | In force Active |
Ordinance No. 3022026 per meeting-summary reporting; signed instrument not located on Fulton County agenda center (CivicEngage agenda center... (Moratorium Nation) | |
| 2026-03 | OH | Portage Township | Wood County | Data centers | In force Active |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found (Moratorium Nation) |
| 2026-03 | OH | Plain Township | Wood County | Data centers | In force Active |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found (Moratorium Nation) |
| 2026-03 | OH | Morgan Township | Butler County | Data centers | In force Active |
Morgan Township (Butler County) Board of Trustees data center moratorium resolution (number not located) (Moratorium Nation) |
| 2026-03 | OH | Monroe Township | Adams County | Data centers, General / multiple uses | In force Active |
Monroe Township (Adams County) Board of Trustees resolution (number not located) imposing a 12-month moratorium on new proposals and development... (Moratorium Nation) |
| 2026-03 | MI | Leoni Township | Jackson County | Data centers | In force Active |
Board of Trustees one-year moratorium on data center conditional use applications (instrument number not located) (Moratorium Nation) |
| GA | Hall County | — | Data centers | In force Extended; runs to Feb 23, 2027 |
Hall County Board of Commissioners moratorium on detention centers, high-density developments, and data centers, voted 2026-02-26 (per WSB-TV... (Moratorium Nation) | |
| MI | Dorr Township | Allegan County | Data centers | In force Active |
Dorr Township Ordinance 01-260, temporary 12-month moratorium on new or expanded data centers (Moratorium Nation) | |
| OH | Village of Monroeville | Huron County | Data centers | In force Active |
Village of Monroeville Resolution 2026-01 (emergency), temporary moratorium on establishing data centers or converting structures into data centers (Moratorium Nation) | |
| OH | Pleasant Township | Franklin County | Data centers | In force Active |
Pleasant Township (Franklin County) Trustee Resolution 11 (2026) placing a moratorium on any building of data centers in the township (Moratorium Nation) | |
| GA | Meriwether County | — | Data centers | In force Extended; runs to Nov 21, 2026 |
Meriwether County Board of Commissioners moratorium on data center applications in unincorporated areas, extended by action of 2026-07-28... (Moratorium Nation) | |
| MI | Marengo Township | Calhoun County | Data centers | In force Active |
Ordinance No. 2026-1 (Moratorium Nation) | |
| MI | Livingston Township | Otsego County | Data centers | Adopted Adopted, Feb 24, 2026 |
Data center moratorium adopted — Board of Commissioners, Feb 24, 2026. Source document (opens in a new tab) (Siting Radar) | |
| IN | Dearborn County | — | Solar, Battery storage (BESS), Data centers | In force Active |
Board of Commissioners action on Plan Commission recommendation, effective 2026-02-25; ordinance or resolution number not captured in publicly... (Moratorium Nation) | |
| GA | Cobb County | — | Data centers | In force Extended; runs to Feb 24, 2027 |
Board of Commissioners moratorium resolution adopted unanimously 2026-02-24; extended by resolution adopted 2026-08-11 (BOC Regular Meeting agenda... (Moratorium Nation) | |
| MI | City of Portage | Kalamazoo County | Data centers, Battery storage (BESS) | In force Active; runs to Dec 31, 2026 |
City of Portage Ordinances O-2-2026 (Chapter 42 Article 13, Secs. 42-1302/42-1303) and O-3-2026 (Sec. 42-140 zoning temporary moratorium) (Moratorium Nation) Earlier item in our records: Hearing notice, Feb 19, 2026 |
|
| NC | City of Kings Mountain | Gaston County | Data centers | In force Extended; runs to Aug 25, 2027 |
Ordinance 26-11, adopted 5-2 on motion by Councilmember Annie Thombs (seconded by Lemmond), enacting 182-day moratorium on permitting new data... (Moratorium Nation) | |
| MI | City of Dearborn Heights | Wayne County | Data centers | In force Active |
City Council resolution (number not located) (Moratorium Nation) | |
| MI | Cheboygan County | — | Battery storage (BESS), Data centers, Solar, Wind | Ended Rescinded, Feb 24, 2026 |
Battery storage/data center/solar/wind moratorium rescinded — Board of Commissioners, Feb 24, 2026. Source document (opens in a new tab) (Siting Radar) | |
| IN | Shelby County | — | Data centers | Ended Replaced by permanent rules |
Resolution 2026-02 (Moratorium Nation) | |
| IN | Huntington County | — | Data centers, Battery storage (BESS) | In force Active |
Ordinance No. 2026-04, "An Ordinance for the Adoption of a Text Amendment to the Unified Development Ordinance (UDO) for Huntington County to... (Moratorium Nation) | |
| MI | Bowne Township | Kent County | Data centers | In force Active |
Township Board vote on a 12-month data center moratorium (2026-02-23); formal instrument and number not located (Moratorium Nation) | |
| MI | Big Rapids Charter Township | Mecosta County | Data centers | In force Active |
Big Rapids Charter Township Data Center Moratorium Ordinance (Moratorium Nation) | |
| MI | Juniata Township | Tuscola County | Crypto mining, Data centers | Proposed On the agenda (before the vote), Feb 19, 2026 |
Planning commission recommendation on a proposed crypto mining/data center moratorium — Township Board, Feb 19, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Iosco Township | Livingston County | Data centers | Adopted Adopted, Feb 19, 2026 |
Data center moratorium adopted — Feb 19, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Parma Township | Jackson County | Data centers | In force Active |
Data Center Moratorium No. 2026-3, Parma Township Board (Moratorium Nation) | |
| MI | Holly Township | Oakland County | Data centers | In force Extended; runs to Feb 15, 2027 |
Township Board moratorium (2026-02-18) and resolution extending it (2026-07-15); instrument numbers not located (Moratorium Nation) | |
| MI | Elmwood Township | Tuscola County | Data centers, Crypto mining | In force Extended; runs to Jun 17, 2027 |
Township ordinance/resolution enacting a temporary nine-month moratorium on data centers, adopted 2026-02-18 (ordinance number not reported);... (Moratorium Nation) | |
| MI | White Lake Charter Township | Oakland County | Data centers | In force Extended; runs to Feb 12, 2027 |
Charter Township of White Lake Resolution No. 26-004, Resolution to Approve Moratorium on the Issuance of Approvals or Permits for Data Processing... (Moratorium Nation) | |
| OH | Vienna Township | Trumbull County | Data centers | In force Extended; runs to Oct 16, 2026 |
Trustee resolution (Vienna Township, Trumbull County) under R.C. 519, adapted from Hubbard Township's moratorium; extension resolution August 2026 (Moratorium Nation) | |
| OH | Richfield Township | Lucas County | Data centers | In force Active |
Resolution 021726-01, a 12-month moratorium on data center facilities, energy-producing/storage facilities, and commercial/industrial... (Moratorium Nation) | |
| GA | Newton County | — | Data centers | In force Extended; runs to Oct 7, 2026 |
Resolution R-040726b (Moratorium Nation) | |
| OH | Monclova Township | Lucas County | Data centers | In force Active |
Resolution 02172026-01 (Moratorium Nation) | |
| MI | Fenton Charter Township | Genesee County | Data centers | In force Active; runs to Feb 22, 2027 |
Charter Township of Fenton Ordinance No. 867, interim zoning ordinance imposing a 12-month blanket prohibition on the establishment and use of... (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), Feb 3, 2026 |
|
| MI | Eagle Township | Clinton County | Data centers | In force Active |
Resolution 02-17-2026-06 under Interim Zoning Ordinance Section 6.01(F) (Moratorium by Resolution, added by Ordinance 01-2026) (Moratorium Nation) | |
| MI | Dexter Township | Washtenaw County | Data centers | In force Extended; runs to Feb 12, 2027 |
Dexter Township Resolution #26-705 (Resolution Adopting Data Center Application Moratorium) under Zoning Ordinance Section 31.15; extended by... (Moratorium Nation) | |
| OH | City of New Carlisle | Clark County | Data centers | In force Active |
Ordinance 2026-06 (Moratorium Nation) | |
| GA | Bulloch County | — | Data centers | In force Extended; runs to Dec 31, 2026 |
Bulloch County Board of Commissioners resolution adopted 2026-02-17 [VERIFY: news reporting (WJCL) confirms board action; resolution number not... (Moratorium Nation) | |
| MI | Ann Arbor Charter Township | Washtenaw County | Data centers | In force Active |
Board of Trustees 12-month data center moratorium (instrument number not located; township agenda PDF linked by WEMU now returns 404) (Moratorium Nation) | |
| OH | City of Ironton | Lawrence County | Data centers | In force Active |
Ordinance 26-01 (as amended to add Section 3, tying automatic repeal to passage of Ordinance 26-09) (Moratorium Nation) | |
| MI | Williamstown Township | Ingham County | Data centers | In force Active |
Ordinance No. 60, Williamstown Township Data Center Moratorium (Moratorium Nation) | |
| MI | Van Buren Charter Township | Wayne County | Data centers | Adopted Adopted, Feb 11, 2026 |
Data center moratorium adopted — Planning Commission, Feb 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | Town of Canton | Haywood County | Data centers, Crypto mining | In force Active |
Town moratorium ordinance ("A Proposed Moratorium Ordinance Regulation Data Centers, Cryptocurrency Mining Facilities, and Server Farms") taken up... (Moratorium Nation) | |
| MI | Saugatuck Township | Allegan County | Data centers | In force Extended; runs to Oct 31, 2026 |
Saugatuck Township Ordinance No. 2026-01, an ordinance to impose a temporary moratorium on the acceptance of new building and zoning applications... (Moratorium Nation) | |
| OH | Pierce Township | Clermont County | Data centers | In force Extended; runs to May 31, 2027 |
Resolution 2026-002 (Moratorium Nation) | |
| MI | Oxford Charter Township | Oakland County | Data centers | In force Active |
Township Board resolution imposing a one-year moratorium on the establishment, permitting, consideration, approval, construction and/or... (Moratorium Nation) | |
| MI | Hanover Township | Jackson County | Data centers | Adopted Adopted, Feb 11, 2026 |
Data center moratorium adopted — Township Board, Feb 11, 2026. Source document (opens in a new tab) (Siting Radar) | |
| NC | Chatham County | — | Data centers, Crypto mining | In force Active; runs to Feb 11, 2027 |
Ordinance 26-0061; N.C.G.S. 160D-107; hearing under N.C.G.S. 160D-601 (Moratorium Nation) | |
| MI | Speaker Township | Sanilac County | Crypto mining, Data centers | Adopted Adopted, Feb 10, 2026 |
Crypto mining/data center moratorium adopted — Township Board, Feb 10, 2026. Source document (opens in a new tab) (Siting Radar) | |
| OH | Hubbard Township | Trumbull County | Data centers | In force Active; runs to Feb 10, 2027 |
Trustee resolution drafted by township legal counsel and reviewed by Trumbull County Planning Commission [CITE: primary resolution text not posted... (Moratorium Nation) | |
| MI | Erie Township | Monroe County | Data centers | In force Active |
Erie Township Ordinance No. 132, Limited Moratorium on the Development of Data Centers Ordinance (PA 246 of 1945) (Moratorium Nation) | |
| MI | Columbus Township | St. Clair County | Data centers | Adopted Adopted, Feb 10, 2026 |
Data center moratorium adopted — Township Board, Feb 10, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Blumfield Township | Saginaw County | Battery storage (BESS), Data centers | Adopted Adopted, Feb 10, 2026 |
Battery storage/data center moratorium adopted — Township Board, Feb 10, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Solon Township | Kent County | Data centers | In force Extended; runs to Feb 10, 2027 |
Township Board moratorium on data center applications (2026-02-09), extended by Board action 2026-07-13 and implemented by a zoning ordinance... (Moratorium Nation) | |
| MI | Maple Valley Township | Montcalm County | Data centers | Adopted Extended, Feb 9, 2026 |
Data center moratorium extended — Feb 9, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Hayes Township | Charlevoix County | Data centers | In force Extended; runs to Feb 4, 2027 |
Resolution 2092026A, To Impose a Temporary Moratorium on the Acceptance and/or Consideration of Any Application for Data Centers (adopted... (Moratorium Nation) | |
| MI | Groveland Township | Oakland County | Data centers | In force Active |
Township Board temporary moratorium (instrument number not located) (Moratorium Nation) | |
| MI | City of South Lyon | Oakland County | Data centers | In force Active |
South Lyon City Council resolution (proposed by Interim City Manager Bakke), adopted Feb. 9, 2026 by unanimous roll-call vote, imposing a... (Moratorium Nation) | |
| MI | Benton Charter Township | Berrien County | Data centers | Adopted Adopted, Feb 9, 2026 |
Data center moratorium adopted — Township Board, Feb 9, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Sharon Township | Washtenaw County | Data centers | In force Active; runs to Feb 5, 2027 |
Sharon Township Resolution No. 2026-02-05-01, Moratorium on Issuance of Permits and Approvals for Data Centers (Moratorium Nation) | |
| MI | City of Sterling Heights | Macomb County | Data centers | In force Active |
City Council resolution, approved unanimously [CITE] (Moratorium Nation) | |
| MI | Caledonia Township | Kent County | Data centers, Crypto mining | In force Extended; runs to Oct 17, 2026 |
Board of Trustees resolution enacting a temporary moratorium on applications for Zoning and Building Review with respect to Data Centers and... (Moratorium Nation) | |
| MI | Lodi Township | Washtenaw County | Data centers | In force Extended; runs to Feb 16, 2027 |
Ordinance No. 2026-001 and Resolution No. 2026-007 (original 180-day data-center moratorium, adopted Feb. 3, 2026, expired ~Aug. 2, 2026). Before... (Moratorium Nation) | |
| GA | Gordon County | — | Data centers | In force Extended; runs to Jan 29, 2027 |
Board of Commissioners motion adopting a data center moratorium on 2026-02-03; extended by resolution adopted at the 2026-07-07 regular meeting... (Moratorium Nation) | |
| OH | Muhlenberg Township | Pickaway County | Data centers | In force Active |
Muhlenberg Township (Pickaway County) Trustee Resolution 2026-10, 12-month moratorium on receipt, processing, issuance or approval of zoning... (Moratorium Nation) | |
| MI | Lenox Township | Macomb County | Data centers | Ended Expired |
Board motion adopted at the February 2, 2026 regular meeting (moved by Trustee Marino, supported by Trustee Rosseel; all ayes); at the May 4, 2026... (Moratorium Nation) | |
| MI | Genoa Township | Livingston County | Data centers, Crypto mining | In force Extended; runs to Feb 2, 2027 |
Resolution No. 260202A under Zoning Ordinance Section 21.06(.03); extended by Resolution No. 260817-B (Moratorium Nation) | |
| OH | City of Maumee | Lucas County | Data centers | In force Active; runs to Feb 2, 2027 |
Resolution No. 005-2026, 'A Resolution Imposing a Temporary Moratorium on the Establishment, Conversion of Other Structures or Buildings into a... (Moratorium Nation) | |
| GA | Brooks County | — | Data centers | In force Extended; runs to Dec 31, 2026 |
Resolution 26-R-01 (Moratorium Nation) | |
| 2026-02 | MI | Wisner Township | Tuscola County | Data centers | In force Extended; runs to Feb 17, 2027 |
Township Board moratorium (instrument number not located); extension by Board motion 2026-08-17 (Moratorium Nation) |
| 2026-02 | OH | Paris Township | Union County | Data centers | Ended Replaced by permanent rules |
Paris Township (Union County) trustee resolution (number not found) under R.C. 519 (Moratorium Nation) |
| 2026-02 | GA | City of Hogansville | Troup County | Data centers | In force Extended |
City Council moratorium on data center applications, extended by council votes 2026-05-04, 2026-07-20 and 2026-08-17 (5-0) (Moratorium Nation) |
| 2026-02 | OH | City of Cincinnati | Hamilton County | Data centers | In force Extended; runs to Feb 11, 2027 |
Emergency ordinance of Cincinnati City Council establishing Interim Development Control (IDC) Overlay District No. 89, "Data Centers", under... (Moratorium Nation) |
| GA | City of Fayetteville | Fayette County | Data centers | Ended Replaced by permanent rules |
Resolution 26-R-07 (90-day moratorium on annexation, rezoning, variance, and conceptual site plans for data centers; adopted unanimously per... (Moratorium Nation) | |
| OH | Williamsburg Township | Clermont County | Data centers | In force Extended; runs to Jan 25, 2027 |
Williamsburg Township (Clermont County) Trustees Resolution No. 2026-04 (2026-01-26), six-month moratorium on the receipt, processing, issuance or... (Moratorium Nation) | |
| MI | Village of Romeo | Macomb County | Data centers | In force Active |
Resolution No. 26-013, adopted unanimously by the Village Board of Trustees (motion by Trustee Parker, supported by Trustee Fowler) (Moratorium Nation) | |
| MI | City of Williamston | Ingham County | Data centers | Adopted Adopted, Jan 26, 2026 |
Data center moratorium adopted — City Council, Jan 26, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Greenwood Township | St. Clair County | Crypto mining, Data centers | Adopted Adopted, Jan 21, 2026 |
Crypto mining/data center moratorium adopted — Township Board, Jan 21, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Grand Blanc Charter Township | Genesee County | Data centers | In force Active |
Township moratorium action; [VERIFY: ordinance or resolution number not located on Grand Blanc Township website as of 2026-04-29] (Moratorium Nation) | |
| MI | City of Pontiac | Oakland County | Data centers | In force Extended; runs to Jan 20, 2027 |
City Council resolution (adopted unanimously Jan. 21, 2026, original six-month term). On June 16, 2026, the City Council adopted Resolution No.... (Moratorium Nation) | |
| GA | Thomas County | — | Data centers | In force Active |
Thomas County Board of Commissioners special-called meeting, January 20, 2026: Commissioner Baggett moved that a 12-month moratorium on the... (Moratorium Nation) | |
| MI | Superior Charter Township | Washtenaw County | Data centers | In force Active |
Charter Township of Superior Resolution Number 2026-2, Resolution Imposing a Temporary Moratorium for a Period of Twelve (12) Months on Data Centers (Moratorium Nation) | |
| IN | Pulaski County | — | Data centers | In force Active |
Moratorium adopted by commissioner voice vote on 2026-01-20 after a 5-0 favorable recommendation from the Plan Commission at its 2026-01-26... (Moratorium Nation) | |
| MI | City of Taylor | Wayne County | Data centers | In force Active |
Taylor City Council Resolution, CCR #1.42-26, adopted unanimously (7-0) at the January 20, 2026 regular meeting (Moratorium Nation) | |
| MI | Olive Township | Ottawa County | Data centers | Proposed On the agenda (before the vote), Jan 15, 2026 |
Discussion of a possible data center moratorium — Jan 15, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Leslie Township | Ingham County | Data centers | Proposed On the agenda (before the vote), Jan 14, 2026 |
Discussion of a possible data center moratorium — Board of Trustees, Jan 14, 2026. Source document (opens in a new tab) (Siting Radar) | |
| MI | Armada Township | Macomb County | Data centers | In force Extended; runs to Dec 7, 2026 |
Resolution No. 2026-02 (adopted January 14, 2026, unanimous 5-0), extended by Resolution No. 2026-10 (adopted June 10, 2026) (Moratorium Nation) | |
| MI | Sylvan Township | Washtenaw County | Data centers, General / multiple uses | In force Extended; runs to Jul 14, 2027 |
Ordinance 26-01 (also referenced as 26-001), adopted Jan. 13, 2026, effective Jan. 28, 2026: a 180-day moratorium on accepting/processing... (Moratorium Nation) | |
| GA | Rockdale County | — | Data centers, Battery storage (BESS) | In force Extended; runs to Oct 1, 2026 |
Rockdale County Resolution No. 2026-01 (moratorium on data centers and battery energy storage systems), extended 2026-05-12 and amended by... (Moratorium Nation) | |
| MI | Oneida Charter Township | Eaton County | Data centers | In force Extended; runs to Jan 24, 2027 |
Oneida Charter Township (Eaton County) Ordinance No. 2026-1, Ordinance Establishing Data Center Moratorium; extended by Resolution No. 2026-07-14,... (Moratorium Nation) | |
| GA | City of Griffin | Spalding County | Data centers, Crypto mining | Ended Replaced by permanent rules |
Griffin City Commission resolution on technological facilities (data centers and crypto mining), 2026-01-13 [VERIFY: news reporting confirms vote... (Moratorium Nation) | |
| MI | City of Saline | Washtenaw County | Data centers | In force Active |
City Council resolution, approved unanimously [CITE] (Moratorium Nation) | |
| MI | City of Saginaw | Saginaw County | Data centers | In force Extended; runs to Dec 31, 2026 |
City Council resolution, approved 9-0; [VERIFY: resolution number not posted in Saginaw CivicEngage agenda center as of 2026-04-29] (Moratorium Nation) | |
| GA | City of Roswell | Fulton County | Data centers | Ended Expired |
Temporary emergency moratorium adopted unanimously by Roswell Mayor and City Council on 2026-01-12 (per WABE and Atlanta News First reporting)... (Moratorium Nation) | |
| GA | Crawford County | — | Data centers | In force Extended; runs to Oct 1, 2026 |
Crawford County Board of Commissioners six-month moratorium on data center applications (adopted 2026-01-06), extended by 5-0 motion on 2026-05-21... (Moratorium Nation) | |
| OH | Village of Lordstown | Trumbull County | Data centers | In force Extended; runs to Jan 1, 2027 |
Ordinance 1-2026; extended by a second emergency ordinance passed by Village Council in mid-June 2026 following a 2026-06-15 public hearing (exact... (Moratorium Nation) | |
| MI | City of Mason | Ingham County | Data centers | Ended Replaced by permanent rules |
City Council moratorium resolution; 4-2 vote (Moratorium Nation) | |
| GA | City of Covington | Newton County | Data centers | Ended Replaced by permanent rules |
Original moratorium resolution adopted 2026-01-05, ratified 2026-01-20, and extended by council action multiple times (to Aug. 4, 2026 per the... (Moratorium Nation) | |
| 2026-01 | GA | Lee County | — | Data centers | In force Extended; runs to Dec 31, 2026 |
Board of Commissioners resolution extending the data center moratorium in unincorporated Lee County while staff studies and drafts an ordinance (Moratorium Nation) |
| 2026-01 | OH | Freedom Township | Wood County | Data centers | In force Active |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found (Moratorium Nation) |
| 2026-01 | MI | City of Utica | Macomb County | Data centers | In force Extended |
Utica City Council moratorium on decisions related to data centers; extension approved 2026-07-14 (instrument number not reported) (Moratorium Nation) |
| 2026-01 | GA | City of East Point | Fulton County | Data centers | In force Extended |
City Council voice-vote extension of an existing data center moratorium (Moratorium Nation) |
| 2026 | OH | Weston Township | Wood County | Data centers | In force Active |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found (Moratorium Nation) |
| 2026 | OH | Liberty Township | Wood County | Data centers | In force Active |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found (Moratorium Nation) |
| 2026 | OH | Henry Township | Wood County | Data centers | In force Active |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found (Moratorium Nation) |
| IN | Franklin County | — | Data centers | In force Extended; runs to Feb 24, 2027 |
Commissioner moratorium extension following 12-month recommendation from Area Plan Commission; signed ordinance or resolution number not captured... (Moratorium Nation) | |
| OH | Village of Ashville | Pickaway County | Data centers | In force Extended; runs to Jan 2, 2027 |
Ordinance 2025-13; extended by Ordinance 2026-14 (adopted 2026-07-06 as an emergency measure, readings waived) (Moratorium Nation) | |
| OH | Waterville Township | Lucas County | Data centers | In force Active |
Township trustee resolution [CITE: resolution number not posted to township website; Toledo Free Press cited the 12-month moratorium and committee process] (Moratorium Nation) | |
| NC | Gates County | — | Data centers | In force Active |
Ordinance imposing temporary moratorium on development approvals for data centers and related high-impact facilities; N.C.G.S. 160D-107 (Moratorium Nation) | |
| OH | Village of South Bloomfield | Pickaway County | Data centers | Ended Replaced by permanent rules |
Ordinance 2025-28, 'An Ordinance Imposing a 180-Day Moratorium on the Receipt, Processing, Issuance, and Approval of Any Application for a Zoning... (Moratorium Nation) | |
| IN | Starke County | — | Data centers | In force Active |
Ordinance No. 2025-37 (Moratorium Nation) | |
| MI | Florence Township | St. Joseph County | Data centers | Adopted Adopted, Dec 15, 2025 |
Data center moratorium adopted — Township Board, Dec 15, 2025. Source document (opens in a new tab) (Siting Radar) | |
| MI | Addison Township | Oakland County | Data centers | Adopted Adopted, Dec 15, 2025 |
Data center moratorium adopted — Township Board, Dec 15, 2025. Source document (opens in a new tab) (Siting Radar) | |
| MI | Springfield Township | Kalkaska County | Data centers | In force Extended; runs to Dec 10, 2026 |
Resolution 2025-11 (adopted Dec. 11, 2025; 180-day term, ~expiring June 9, 2026). Before that term lapsed, the Township Board extended it twice: a... (Moratorium Nation) | |
| OH | Washington Township | Franklin County | Data centers | Ended Extended; end date Sep 5, 2026 has passed |
Board of Trustees Motion #2025.12.09.001 (90-day initial moratorium, 2025-12-09), extended by Resolution #2026.02.10.005 (2026-02-10), citing R.C.... (Moratorium Nation) | |
| MI | Green Charter Township | Mecosta County | Data centers | In force Active |
Adopted by board motion (Riebow/Thorne) at the December 9, 2025 regular Township Board meeting, unanimous roll call vote, with an amendment adding... (Moratorium Nation) | |
| MI | Dundee Township | Monroe County | Data centers | Ended Expired |
Dundee Township Resolution 2025-5, 'Establishing a Moratorium on Data Center Applications and Projects,' adopted December 9, 2025 (roll call:... (Moratorium Nation) Earlier item in our records: On the agenda (before the vote), Oct 8, 2025 |
|
| GA | City of South Fulton | Fulton County | Data centers | Ended Replaced by permanent rules |
Resolution RES2025-094 (adopted 2025-12-09) instituting a six-month moratorium on applications for new data centers or other large-scale data... (Moratorium Nation) | |
| MI | Lima Township | Washtenaw County | Data centers | In force Extended |
Lima Township Resolution 25-15 (temporary moratorium on approval of data centers); extended by Resolution 2026-13 (Moratorium Nation) | |
| OH | City of Waterville | Lucas County | Data centers | Ended Expired |
Resolution 34-25, "A RESOLUTION IMPOSING A MORATORIUM ON THE ISSUANCE OR GRANTING OF APPLICATIONS OR PERMITS FOR DATA CENTERS AND ANCILLARY... (Moratorium Nation) | |
| MI | Tyrone Township | Livingston County | Data centers | In force Extended; runs to Feb 19, 2027 |
Resolution #251203 (original, adopted 2025-12-02); renewed/extended by Resolution #260502 (adopted 2026-05-19, unanimous 7-0 roll call) (Moratorium Nation) | |
| GA | Monroe County | — | Data centers | Ended Replaced by permanent rules |
Resolution on Data Center Moratorium prepared by Brandon Bowen of Jenkins, Bowen & Walker, P.C., approved 4-1 on 2025-12-16, superseded by a... (Moratorium Nation) | |
| GA | Athens-Clarke County (County) | Data centers | Ended Replaced by permanent rules |
Ordinance 25-12-117 (initial); Ordinance 26-03-19 (extension adopted 2026-03-03 by unanimous vote, "AN ORDINANCE TO IMPOSE, CONTINUE, AND EXTEND A... (Moratorium Nation) | ||
| OH | City of Norton | Summit County | Data centers | Ended Replaced by permanent rules |
Ordinance 108-2025; extended by Ordinance 55-2026 (adopted 2026-05-18 as an emergency measure) (Moratorium Nation) | |
| 2025-12 | MI | Bruce Township | Macomb County | Data centers | In force Active |
Bruce Township Board of Trustees moratorium covering all applications for Industrial Research Office (IRO) and Light Industrial zoning; specific... (Moratorium Nation) |
| OH | City of Eastlake | Lake County | Data centers | In force Active |
City of Eastlake Resolution No. 2025-103 (emergency), a five-year moratorium on permitting any data centers (Moratorium Nation) | |
| MI | Pittsfield Charter Township | Washtenaw County | Data centers | In force Extended; runs to Nov 15, 2026 |
Resolution #25-30 (adopted 2025-11-20), extended by Resolution #26-11 (adopted 2026-05-13) (Moratorium Nation) | |
| MI | Howell Township | Livingston County | Data centers | Ended Expired |
Data Center Moratorium ordinance; formal ordinance number not identified (Moratorium Nation) | |
| MI | Summerfield Township | Monroe County | Data centers | Adopted Adopted, Nov 17, 2025 |
Data center moratorium adopted — Township Board, Nov 17, 2025. Source document (opens in a new tab) (Siting Radar) | |
| IN | Putnam County | — | Data centers, Solar, Wind | In force Active |
Ordinance No. 2025-11-17-1 establishing a moratorium on new small modular reactors, data centers, solar energy conservation systems, and wind... (Moratorium Nation) | |
| OH | Village of Boston Heights | Summit County | Data centers | In force Active |
Resolution 2025-11-50 (Village of Boston Heights), emergency, declaring a 12-month moratorium on accepting for filing, review and approval of all... (Moratorium Nation) | |
| OH | City of Barberton | Summit County | Data centers | In force Active |
Resolution/Ordinance No. 157-2025 (emergency) instituting a moratorium on data centers within Barberton; later Ordinance No. 50-2026 (passed... (Moratorium Nation) | |
| 2025-11 | OH | Shalersville Township | Portage County | Data centers | In force Extended; runs to Nov 1, 2026 |
Board of Trustees resolution (township zoning, R.C. Chapter 519) imposing a six-month moratorium on data center applications; six-month extension... (Moratorium Nation) |
| IN | White County | — | Data centers | Ended Replaced by permanent rules |
Ordinance No. 2025-10-20-02 (Moratorium Nation) | |
| MI | Manchester Township | Washtenaw County | Data centers | In force Active |
Ordinance No. 116, Ordinance Establishing Data Center Moratorium (Moratorium Nation) | |
| GA | City of LaGrange | Troup County | Data centers | Ended Replaced by permanent rules |
LaGrange City Council 180-day moratorium resolution, adopted 2025-09-23. After the moratorium expired, and following months of council debate over... (Moratorium Nation) | |
| VA | Fluvanna County | — | Data centers | Ended Replaced by permanent rules |
Board motion approving a moratorium on new data center applications; related resolution of intention and ZTA 25:10 (Moratorium Nation) | |
| GA | Troup County | — | Data centers | Ended Replaced by permanent rules |
Troup County 90-day moratorium with public notice for extension (per Ledger-Enquirer reporting cited in GPB 2025-10-22) (Moratorium Nation) | |
| GA | Lamar County | — | Data centers | In force Extended |
Lamar County Resolution 2025-18, 'Moratorium on Commercial and Manufacturing Development,' adopted September 16, 2025; extended as to data centers... (Moratorium Nation) | |
| GA | Jones County | — | Data centers, Crypto mining | Ended Replaced by permanent rules |
Jones County M-2 Data Center Ordinance (comprehensive land use plan / land use amendment adding data centers as a conditional use in M-2... (Moratorium Nation) | |
| MI | Milan Township | Monroe County | Data centers | Proposed On the agenda (before the vote), Sep 11, 2025 |
Discussion of a possible data center moratorium — Sep 11, 2025. Source document (opens in a new tab) (Siting Radar) | |
| OH | Jerome Township | Union County | Data centers | Ended Replaced by permanent rules |
Resolution 25-061 (Moratorium Nation) | |
| GA | Clayton County | — | Data centers | In force Extended; runs to Dec 31, 2026 |
Resolution 2025-193 (per Clayton County news release referenced in GPB 2025-10-22 reporting) [VERIFY: county news release URL... (Moratorium Nation) | |
| 2025-09 | GA | Pike County | — | Data centers | Ended Replaced by permanent rules |
Pike County Unified Development Code, Article 14 (M-1 Manufacturing-Light), Sec. 1403.A.5 and related sections, adding minimum lot area, buffer,... (Moratorium Nation) |
| 2025-09 | GA | City of Social Circle | Walton County | Data centers | Ended Replaced by permanent rules |
Social Circle City Council moratorium action (original term and one extension); superseded by Ordinance No. 2026-ORD-2, amending Section 3.4.6 of... (Moratorium Nation) |
| GA | DeKalb County | — | Data centers | In force Extended; runs to Mar 30, 2027 |
DeKalb County moratorium resolutions, including 2025-12-16 extension (originally numbered draft 2025-1694 per agenda referenced in research notes)... (Moratorium Nation) | |
| MI | Clark Township | Mackinac County | Data centers, Crypto mining | Ended Expired |
Board of Trustees special meeting motion; no ordinance or resolution number identified (Moratorium Nation) | |
| GA | Coweta County | — | Data centers | Ended Replaced by permanent rules |
(first instrument, May 2025) Board of Commissioners moratorium resolution; replaced by permanent data center ordinance posted at... (Moratorium Nation) | |
| GA | Douglas County | — | Data centers | Ended Expired |
Douglas County Resolution 25-116, "Resolution: Moratorium Data Center Accessory" (PDF saved at... (Moratorium Nation) | |
| IN | Marshall County | — | Data centers, Solar, Battery storage (BESS) | Ended Replaced by permanent rules |
Ordinance 2025-9, Certified Proposal to Amend the Marshall County Zoning Ordinance Regarding a Moratorium on Data Centers (Moratorium Nation) | |
| NY | Dryden Town | Tompkins County | Data centers, Crypto mining | Ended Replaced by permanent rules |
Local Law No. 2 of 2024; draft Local Law No. 1 of 2026 extension; Local Law No. 2 of 2026 replacement zoning definitions (Moratorium Nation) | |
| NY | City of North Tonawanda | Niagara County | Data centers, Crypto mining | In force Extended; runs to Jul 16, 2027 |
Local Law 2024-2 (original 2-year moratorium on cryptocurrency mining and data processing centers), extended by a 2026 local law ('Local Law 2026... (Moratorium Nation) | |
| NC | Cherokee County | — | Crypto mining, Data centers | Ended Expired |
High-Impact Facility Moratorium adopted under N.C.G.S. 160D-107(a) and 160D-107(d); ordinance text recites Cherokee County Comprehensive Plan... (Moratorium Nation) | |
| NC | Madison County | — | Data centers, Crypto mining | Ended Expired |
Madison County Limited Moratorium on Data Processing Facilities, adopted June 13, 2023 (per County Manager Rod Honeycutt press release, confirmed... (Moratorium Nation) | |
| OH | City of Fairborn | Greene County | Data centers, Crypto mining | Ended Expired |
Ordinance 25-22, 'An Emergency Ordinance Imposing a Temporary Moratorium for a Period of 180 Days from the Date Hereof on the Issuance of Any... (Moratorium Nation) | |
| — | OH | Village of St. Bernard | Hamilton County | Data centers | Pending Pending (not yet enacted) |
Proposed St. Bernard council legislation for a 12-month moratorium on accepting/processing applications, permits and approvals for data centers... (Moratorium Nation) |
| — | OH | Village of Perry | Lake County | Data centers | Pending Pending (not yet enacted) |
Village of Perry (Lake County) proposed Ordinance No. 2026-13, a one-year moratorium on accepting and approving applications for data centers,... (Moratorium Nation) |
| — | NC | Town of Elizabethtown | Bladen County | Data centers | Pending Pending (not yet enacted) |
Proposed Code of Ordinances amendment: temporary moratorium on development approvals for data centers under G.S. 160D-107 (draft ordinance posted... (Moratorium Nation) |
| — | NY | Potsdam Town | St. Lawrence County | Data centers | Pending Pending (not yet enacted) |
(Moratorium Nation) |
| — | IN | Owen County | — | Data centers | Pending Pending (not yet enacted) |
Owen County Planning Commission recommendation (undated, prior to Sept. 2026) forwarding a draft moratorium resolution to the Board of... (Moratorium Nation) |
| — | NY | Mamakating Town | Sullivan County | Data centers | Pending Pending (not yet enacted) |
No local law has been drafted or adopted yet; on 2026-09-15 the Town Board passed a resolution directing the Town Attorney to prepare a proposed... (Moratorium Nation) |
| — | MI | Howard Township | Cass County | Data centers, Battery storage (BESS) | Pending Pending (not yet enacted) |
Proposed Resolution 2026-10; proposed Ordinance No. 237 (non-zoning temporary moratorium on data centers and battery energy storage systems);... (Moratorium Nation) |
| — | NC | Halifax County | — | Data centers | Pending Pending (not yet enacted) |
Proposed Halifax County data center moratorium, N.C.G.S. 160D-107; legislative hearing set for 2026-10-19 (Moratorium Nation) |
| — | NC | Guilford County | — | Data centers | Pending Pending (not yet enacted) |
Proposed Guilford County temporary moratorium on data centers (up to 180 days), N.C.G.S. 160D-107 (Moratorium Nation) |
| — | MI | Fayette Township | Hillsdale County | Wind, Battery storage (BESS), Data centers | Pending Pending (not yet enacted) |
Proposed township resolution/moratorium recommended by the Fayette Township Planning Commission (Moratorium Nation) |
| — | NY | Enfield Town | Tompkins County | Data centers | Pending Pending (not yet enacted) |
May 13, 2026 Town Board resolution directing the Planning Board to draft data center legislation; a subsequent draft local law (closely modeled on... (Moratorium Nation) |
| — | VA | City of Suffolk | Suffolk city | Data centers | Pending Pending (not yet enacted) |
UDO Text Amendment OTA2026-008, recommended by the Planning Commission on 2026-09-15 (Moratorium Nation) |
| — | NC | City of Raleigh | Wake County | Data centers | Pending Pending (not yet enacted) |
Proposed City of Raleigh moratorium on new data centers of 10,000 sq ft or larger (draft by city attorney), N.C.G.S. 160D-107 (Moratorium Nation) |
| — | IN | City of Fort Wayne | Allen County | Data centers | Pending Pending (not yet enacted) |
Ordinance(s) introduced by Councilwoman Rohli Booker in September 2026, including a proposed 365-day data center moratorium and a directive for... (Moratorium Nation) |
| — | MI | City of Detroit | Wayne County | Data centers | Pending Pending (not yet enacted) |
City Council resolution asking Mayor Mary Sheffield to consider withholding data center permits (Moratorium Nation) |
| — | NY | City of Buffalo | Erie County | Data centers, Crypto mining | Pending Pending (not yet enacted) |
Proposed local law/ordinance for a two-year moratorium on new data centers and cryptocurrency facilities, City of Buffalo, sponsored/championed by... (Moratorium Nation) |
| — | OH | City of Amherst | Lorain County | Data centers | Pending Pending (not yet enacted) |
Proposed City of Amherst (Lorain County) legislation (sponsored by Ward 1 Council member Brian Dembinski) prohibiting data centers larger than 2.5... (Moratorium Nation) |
| — | NC | Beaufort County | — | Data centers | Pending Pending (not yet enacted) |
Proposed Beaufort County one-year moratorium on the acceptance, processing and approval of applications for data center developments (Moratorium Nation) |
Moratorium records marked “Moratorium Nation” come from the Moratorium Nation inventory by Michael J. Bommarito, licensed CC BY 4.0; status follows that inventory, and we mark a record ended once its recorded end date has passed. Records marked “Siting Radar” are our own detections in public meeting documents: the status is the latest step we saw, with a link to the source. Not legal advice.
“The Zoning Commission of Liberty Township will consider at this meeting a proposed amendment to the Liberty Township Zoning Resolution which has been initiated by the Zoning Commission of Liberty Township on September…”
“a. Data Center Ordinance”
“meeting live online - Camden BOC - YouTube __________________________________________________________________ Convene Work Session 6:00 PM • Discussion regarding Data Center Ordinance.”
“…All Commission Districts Adoption of an ordinance to amend Chapter 27 of the Code of DeKalb County, Georgia, to establish Data Center Definitions and Data Center Classifications for regulatory oversight of any potential…”
“D. Hinton R. Shoemaker September 22, 2026 There will be a special meeting of the Planning Commission on Tuesday, September 29, 2026 at 7:00 pm to work on the Data Center Ordinance.”
“…Model Data Center Ordinance Alexis Gulker As a reminder, in the past we have shared materials from the University of Michigan, a study 616-773-4638 from the University of Sydney, an article from the Brookings Institute…”
“Public Hearing - Planning Commission Planning Commission Meeting Public Hearing Notice for proposed Data Center Ordinance on September 24, 2026 at 7:00 p.m.”
“SECTION 80.06.09 DATA CENTER REGULATIONS Franklin County Data Center Zoning Ordinance: Legislative Intent and Findings of Facts WHEREAS, Indiana Code § 36-7-4-601 grants the Franklin County Board of Commissioners the…”
“UNFINISHED BUSINESS Data Center Regulations Motion by Tocarchick, second by Weston, to move the Data Center Ordinance from the table and place on the agenda.”
“In addition, the following documentation shall be submitted to demonstrate compliance with requirements herein: Zoning Ordinance Amendments for Data Centers – REVISED September 17, 2026 Tyrone Township Page 3”
“Text Amendment Application TAZ 2026.02 – Ordinance 2026.10 Amend Zoning Ordinance to Add Article IX Data Centers”
“…and the Residents Research Committee (RRC) to develop a draft ordinance to regulate the siting and development of Data Centers and other High Resource Demand Facilities.”
“b. Data Center Zoning Ordinance Update”
“Draft Data Center Ordinance The Planning Commission is discussing draft ordinance language for regulating data centers.”
“Is this a rezoning of the former data-center property?”
As of Sep 30, 2026 we list 623 local data center moratoria in the seven states we cover: 499 in force or recently adopted, 74 pending or proposed and 50 ended. In force or adopted by state: Ohio 147, Michigan 193, New York 25, North Carolina 56, Georgia 50, Indiana 24 and Virginia 4. Records come from the Moratorium Nation inventory (CC BY 4.0) and from meeting documents we monitor.
Most local actions are temporary moratoria, not permanent bans. As of Sep 30, 2026, 492 governments in our coverage have a data center moratorium in force or recently adopted, including City of Dearborn (MI), Port Huron Charter Township (MI), Fayette County (OH), East China Township (MI), Brighton Township (MI), Egelston Township (MI), Village of McDonald (OH), Loudoun County (VA), City of Gary (IN), Steuben County (IN), Richland Township (MI), Village of Pioneer (OH) and 480 more. The table on this page lists every record with its date and source.
Yes: 20 upcoming hearings or votes in the next 120 days as of Sep 30, 2026. The next is in City of Marietta, GA on Sep 30, 2026 (on the agenda (before the vote)).
A moratorium temporarily pauses applications or permits for a use (often 6 to 12 months) while the government writes rules. A siting ordinance or zoning amendment sets the lasting rules: where the use is allowed, setbacks, height, noise, decommissioning and similar standards. Many moratoria end when such rules are adopted.
Yes. The CSV on this page lists our own detections for data centers (moratoria, zoning amendments and siting ordinances) with our one-line summaries and links to the source documents. Moratorium Nation records are shown on the page with attribution; get the full inventory from its publisher.
No. It is information compiled automatically from public records. Confirm anything that matters with the local government and your counsel.