North Carolina local moratoria on data centers, battery storage, solar and wind

Every local moratorium we know of in North Carolina, by county, township, town, city and village: 84 records, of which 57 are in force or recently adopted and 19 are pending or proposed. Upcoming votes are listed below.

Data last changed (23:53 UTC) · page regenerated daily, last on

57
in force or recently adopted
1
upcoming hearings and votes (120 days)
84
moratoria on record
78
governments with a record

Map

Alamance County: In forceAlexander County: no moratorium knownAlleghany County: no moratorium knownAnson County: no moratorium knownAshe County: no moratorium knownAvery County: no moratorium knownBeaufort County: Vote or hearing pendingBertie County: no moratorium knownBladen County: no moratorium knownBrunswick County: no moratorium knownBuncombe County: EndedBurke County: no moratorium knownCabarrus County: no moratorium knownCaldwell County: no moratorium knownCamden County: In forceCarteret County: no moratorium knownCaswell County: no moratorium knownCatawba County: no moratorium knownChatham County: In forceCherokee County: EndedChowan County: no moratorium knownClay County: no moratorium knownCleveland County: no moratorium knownColumbus County: no moratorium knownCraven County: no moratorium knownCumberland County: In forceCurrituck County: no moratorium knownDare County: no moratorium knownDavidson County: Proposed; no vote outcome seenDavie County: In forceDuplin County: no moratorium knownDurham County: In forceEdgecombe County: In forceForsyth County: no moratorium knownFranklin County: no moratorium knownGaston County: no moratorium knownGates County: In forceGraham County: no moratorium knownGranville County: no moratorium knownGreene County: no moratorium knownGuilford County: Vote or hearing pendingHalifax County: Vote or hearing pendingHarnett County: In forceHaywood County: no moratorium knownHenderson County: EndedHertford County: no moratorium knownHoke County: no moratorium knownHyde County: no moratorium knownIredell County: no moratorium knownJackson County: In forceJohnston County: no moratorium knownJones County: no moratorium knownLee County: no moratorium knownLenoir County: no moratorium knownLincoln County: no moratorium knownMacon County: no moratorium knownMadison County: EndedMartin County: no moratorium knownMcDowell County: In forceMecklenburg County: no moratorium knownMitchell County: no moratorium knownMontgomery County: Proposed; no vote outcome seenMoore County: no moratorium knownNash County: In forceNew Hanover County: no moratorium knownNorthampton County: In forceOnslow County: no moratorium knownOrange County: In forcePamlico County: no moratorium knownPasquotank County: In forcePender County: no moratorium knownPerquimans County: no moratorium knownPerson County: no moratorium knownPitt County: Proposed; no vote outcome seenPolk County: no moratorium knownRandolph County: no moratorium knownRichmond County: no moratorium knownRobeson County: no moratorium knownRockingham County: no moratorium knownRowan County: In forceRutherford County: no moratorium knownSampson County: no moratorium knownScotland County: no moratorium knownStanly County: no moratorium knownStokes County: no moratorium knownSurry County: In forceSwain County: In forceTransylvania County: no moratorium knownTyrrell County: no moratorium knownUnion County: no moratorium knownVance County: In forceWake County: no moratorium knownWarren County: In forceWashington County: no moratorium knownWatauga County: In forceWayne County: no moratorium knownWilkes County: no moratorium knownWilson County: no moratorium knownYadkin County: In forceYancey County: no moratorium knownTown of Apex, Wake County: In forceTown of Bailey, Nash County: In forceTown of Boone, Watauga County: In forceTown of Butner, Granville County: Adopted (seen in meeting documents)Town of Canton, Haywood County: In forceTown of Cary, Wake County: In forceTown of Clyde, Haywood County: In forceTown of Denton, Davidson County: Proposed; no vote outcome seenTown of Eastover, Cumberland County: Proposed; no vote outcome seenTown of Elizabethtown, Bladen County: Vote or hearing pendingTown of Farmville, Pitt County: In forceTown of Franklin, Macon County: In forceTown of Garner, Wake County: In forceTown of Gibsonville, Alamance County: Proposed; no vote outcome seenTown of Highlands, Macon County: In forceTown of Hildebran, Burke County: In forceTown of Hillsborough, Orange County: In forceTown of Holly Springs, Wake County: In forceTown of Hot Springs, Madison County: In forceTown of Jonesville, Yadkin County: Proposed; no vote outcome seenTown of Lewisville, Forsyth County: Proposed; no vote outcome seenTown of Mayodan, Rockingham County: EndedTown of Nashville, Nash County: In forceTown of Newport, Carteret County: In forceTown of Sparta, Alleghany County: Proposed; no vote outcome seenTown of Spring Hope, Nash County: In forceTown of Waxhaw, Union County: In forceTown of Wendell, Wake County: In forceTown of Whitakers, Edgecombe County: In forceTown of Woodfin, Buncombe County: In forceCity of Asheville, Buncombe County: In forceCity of Boiling Spring Lakes, Brunswick County: In forceCity of Brevard, Transylvania County: EndedCity of Charlotte, Mecklenburg County: EndedCity of Dunn, Harnett County: Proposed; no vote outcome seenCity of Durham, Durham County: In forceCity of Greensboro, Guilford County: In forceCity of Hendersonville, Henderson County: In forceCity of Kings Mountain, Gaston County: Vote or hearing pendingCity of Lincolnton, Lincoln County: In forceCity of Mount Airy, Surry County: In forceCity of Raleigh, Wake County: Vote or hearing pendingCity of Southport, Brunswick County: In forceCity of Statesville, Iredell County: In forceCity of Whiteville, Columbus County: In forceCity of Wilson, Wilson County: In force
  • Moratorium in force or adopted
  • Vote pending or proposed
  • Ended
  • None known

Counties link to their county pages; shaded townships, cities and villages link to their records. County-wide moratoria shade the whole county. Boundaries: Census TIGER/Line 2025.

Upcoming votes and hearings

  1. Hearing notice Moratorium Data centers

    City of Kings Mountain, NC

    City Council Meeting Agendas and Minutes · (upcoming) · Gaston County
    “3. A date of termination of the moratorium and a statement setting forth why that duration is reasonably necessary to address the problems or conditions leading to imposition of the moratorium.”
    Source document, p. 10 (opens in a new tab) Agenda for Sep 22, 2026 +1 related mention

All known local moratoria in North Carolina

DateGovernmentCountyUsesStatusDetails and source
City of Kings Mountain Gaston County Data centers Pending
Hearing notice, Feb 23, 2027
Hearing notice for a proposed data center moratorium — City Council Meeting Agendas and Minutes, Feb 23, 2027. Source document (opens in a new tab) (Siting Radar)
Guilford County — Data centers Proposed
On the agenda (before the vote), Nov 5, 2026
Vote scheduled on a proposed data center moratorium — Board of Commissioners, Nov 5, 2026. Source document (opens in a new tab) (Siting Radar)
Davidson County — Data centers Proposed
Hearing notice, Oct 26, 2026
Hearing notice for a proposed data center moratorium — Oct 26, 2026. Source document (opens in a new tab) (Siting Radar)
Montgomery County — Data centers Proposed
On the agenda (before the vote), Oct 20, 2026
Vote scheduled on a proposed data center moratorium — Board of Commissioners, Oct 20, 2026. Source document (opens in a new tab) (Siting Radar)
City of Raleigh Wake County Data centers Proposed
On the agenda (before the vote), Oct 6, 2026
Discussion of a possible data center moratorium — City Council Meeting - First Tuesday - Afternoon & Evening Sessions, Oct 6, 2026. Source document (opens in a new tab) (Siting Radar)
Town of Denton Davidson County Solar Proposed
Hearing notice, Oct 5, 2026
Hearing notice for a proposed solar moratorium — Oct 5, 2026. Source document (opens in a new tab) (Siting Radar)
Beaufort County — Data centers Proposed
On the agenda (before the vote), Oct 5, 2026
Vote scheduled on a proposed data center moratorium — Board of Commissioners, Oct 5, 2026. Source document (opens in a new tab) (Siting Radar)
Town of Lewisville Forsyth County Data centers Proposed
On the agenda (before the vote), Oct 1, 2026
Discussion of a possible data center moratorium — Town Council Briefing & Action Meeting - October 2026, Oct 1, 2026. Source document (opens in a new tab) (Siting Radar)
Town of Butner Granville County Data centers Adopted
Extended, Oct 1, 2026
Data center moratorium extended — Town Council, Oct 1, 2026. Source document (opens in a new tab) (Siting Radar)
Town of Jonesville Yadkin County Solar Proposed
Hearing notice, Sep 28, 2026
Hearing notice for a proposed solar moratorium — Sep 28, 2026. Source document (opens in a new tab) (Siting Radar)
Town of Gibsonville Alamance County Data centers Proposed
On the agenda (before the vote), Sep 21, 2026
Discussion of a possible data center moratorium — Sep 21, 2026. Source document (opens in a new tab) (Siting Radar)
Vance County — Data centers In force
Active
Vance County 60-day data center moratorium (number not located), N.C.G.S. 160D-107; the legal notice advertised 60 days, so a 6-month motion was... (Moratorium Nation)
City of Statesville Iredell County Data centers In force
Active
City of Statesville data center moratorium ordinance (number not located), N.C.G.S. 160D-107 (Moratorium Nation)
City of Southport Brunswick County Data centers In force
Active
City of Southport data center moratorium ordinance, N.C.G.S. 160D-107 (ordinance number not located); recommended by the Planning Board (Moratorium Nation)
Earlier item in our records: On the agenda (before the vote), Aug 13, 2026
Nash County — Data centers, Crypto mining In force
Active
Nash County temporary development moratorium ordinance on data centers, data processing facilities, cryptocurrency mining and similar high-impact... (Moratorium Nation)
Earlier item in our records: On the agenda (before the vote), Aug 17, 2026
City of Lincolnton Lincoln County Data centers In force
Active
Lincolnton City Council motion/ordinance adopting a moratorium on data center applications (2026-09-03) (Moratorium Nation)
City of Hendersonville Henderson County Data centers In force
Active; runs to Sep 3, 2027
Ordinance #O-26-29, Ordinance Imposing a Temporary Moratorium on Data Centers, N.C.G.S. 160D-107 (Moratorium Nation)
Earlier item in our records: Hearing notice, Aug 26, 2026
Town of Sparta Alleghany County Data centers Proposed
Public hearing, Sep 1, 2026
Public hearing on a proposed data center moratorium — Planning Board, Sep 1, 2026. Source document (opens in a new tab) (Siting Radar)
2026-09 Town of Newport Carteret County Data centers, Crypto mining In force
Active
Town of Newport moratorium on data centers, data processing facilities, cryptocurrency mining operations and associated uses in town limits and... (Moratorium Nation)
McDowell County — Data centers In force
Active
McDowell County data center moratorium (number not located), N.C.G.S. 160D-107 (Moratorium Nation)
Town of Cary Wake County Data centers, Crypto mining In force
Active
Ordinance Establishing a Temporary 18-month Moratorium on the Acceptance, Processing, and Approval of Development Applications for Data Centers,... (Moratorium Nation)
City of Whiteville Columbus County Data centers, Crypto mining In force
Active
City of Whiteville moratorium on data centers and cryptocurrency mining (ordinance number not located) (Moratorium Nation)
Town of Hildebran Burke County Data centers In force
Active
Town of Hildebran data center moratorium (number not located); adopted after the town's March 2026 permanent data center zoning regulations (Moratorium Nation)
Durham County — Data centers, Crypto mining In force
Active; runs to May 18, 2027
Ordinance imposing a temporary moratorium on the permitting of large-scale data centers, data processing facilities, cryptocurrency mining... (Moratorium Nation)
Town of Highlands Macon County Data centers, Crypto mining In force
Active
Town of Highlands temporary moratorium ordinance on data centers, cryptocurrency mining and other high-intensity computing facilities (number not located) (Moratorium Nation)
Warren County — Data centers In force
Active
Ordinance imposing a 12-month moratorium on development approvals for data centers and related high-impact facilities (number not located) (Moratorium Nation)
Jackson County — Data centers In force
Active
Jackson County data center moratorium ordinance (number not located), N.C.G.S. 160D-107; bars zoning, development, building and demolition... (Moratorium Nation)
City of Greensboro Guilford County Data centers In force
Active
City Council moratorium ordinance pausing acceptance, processing and approval of development applications for data centers, data storage and... (Moratorium Nation)
Yadkin County — Data centers In force
Active
Yadkin County data center moratorium ordinance, N.C.G.S. 160D-107 (ordinance number not located) (Moratorium Nation)
Pitt County — Data centers Proposed
On the agenda (before the vote), Aug 17, 2026
Discussion of a possible data center moratorium — Board of Commissioners, Aug 17, 2026. Source document (opens in a new tab) (Siting Radar)
Alamance County — Data centers In force
Active
Ordinance Imposing a Temporary Moratorium on Development Approvals for data centers in unincorporated Alamance County, N.C.G.S. 160D-107... (Moratorium Nation)
Town of Waxhaw Union County Data centers, Crypto mining In force
Active
Ordinance ORD2026014, An Ordinance Imposing a Temporary Moratorium on the acceptance, processing and approval of development applications for data... (Moratorium Nation)
Town of Eastover Cumberland County Crypto mining, Data centers Proposed
On the agenda (before the vote), Aug 11, 2026
Drafting of a crypto mining/data center moratorium — Town Council, Aug 11, 2026. Source document (opens in a new tab) (Siting Radar)
City of Dunn Harnett County Data centers Proposed
On the agenda (before the vote), Aug 11, 2026
Discussion of a possible data center moratorium — Council, Aug 11, 2026. Source document (opens in a new tab) (Siting Radar)
Town of Nashville Nash County Data centers, Crypto mining In force
Active
Ordinance 2026-23, temporary moratorium on data centers, data processing facilities, cryptocurrency mining operations and similar uses, N.C.G.S. 160D-107 (Moratorium Nation)
Town of Farmville Pitt County Data centers In force
Active
Town of Farmville data center moratorium ordinance (number not located), N.C.G.S. 160D-107 (Moratorium Nation)
Edgecombe County — Data centers In force
Active
Edgecombe County two-year moratorium on accepting, processing and approving development applications and permits for data centers and related uses... (Moratorium Nation)
Camden County — Data centers, Crypto mining In force
Active
Camden County moratorium ordinance on development related to data centers, data processing facilities and cryptocurrency mining (number not located) (Moratorium Nation)
Pasquotank County — Solar In force
Active
Pasquotank County solar farm moratorium (instrument number not located) (Moratorium Nation)
City of Mount Airy Surry County Data centers, Crypto mining In force
Extended; runs to Dec 13, 2026
Ordinance No. 2027-002 (initial 60-day moratorium, adopted 2026-07-16); extended by Ordinance No. 2027-008 (ninety-day extension, public hearing... (Moratorium Nation)
Town of Hot Springs Madison County Data centers, Crypto mining In force
Active
Town Board moratorium pausing special use applications for data centers, cryptocurrency mining facilities, server farms and high-density digital... (Moratorium Nation)
Town of Franklin Macon County Data centers In force
Active
Ordinance No. 2026-002 (Moratorium Nation)
Davie County — Data centers In force
Active; runs to Jul 5, 2027
Ordinance Imposing a One-Year Moratorium on the Development of Data Centers in Davie County ('Temporary Data Center Moratorium'; unnumbered),... (Moratorium Nation)
City of Asheville Buncombe County Data centers In force
Active
City Council moratorium ordinance applying to new development, uses, or changes of use within NAICS 518210 or functionally equivalent facilities;... (Moratorium Nation)
Town of Holly Springs Wake County Data centers, Crypto mining In force
Active; runs to Jun 16, 2027
Ordinance 26-19 (up to 12-month moratorium on acceptance, processing and approval of development applications for data centers, cryptocurrency... (Moratorium Nation)
Cumberland County — Data centers, Crypto mining In force
Active; runs to Dec 15, 2026
Board of Commissioners moratorium on data center site-plan review and zoning and building permits; instrument number not located in reviewed sources (Moratorium Nation)
City of Charlotte Mecklenburg County Data centers Ended
Active; end date Nov 5, 2026 has passed
Ordinance Imposing a Temporary Moratorium on Acceptance, Processing, and Approval of Applications for New Telecommunications and Data Storage... (Moratorium Nation)
City of Boiling Spring Lakes Brunswick County Data centers, Crypto mining In force
Active
Ordinance (temporary moratorium on data centers, data processing facilities, cryptocurrency mining operations, and associated uses); incidental... (Moratorium Nation)
Town of Whitakers Edgecombe County Data centers In force
Active
Town of Whitakers data center moratorium (instrument not located) (Moratorium Nation)
Surry County — Data centers In force
Extended; runs to Jul 20, 2028
Ordinance Imposing a Temporary Moratorium on Development Approvals for Data Centers and Related High-Impact Facilities in All Areas Subject to... (Moratorium Nation)
Town of Hillsborough Orange County Data centers, Crypto mining In force
Extended; runs to May 27, 2027
Ordinance 20260527-5.A (initial 60-day term, adopted 2026-05-27); extended by Ordinance #20260622-5.A, adopted 3-0 on 2026-06-22 after a public... (Moratorium Nation)
City of Wilson Wilson County Data centers, Crypto mining, Battery storage (BESS) In force
Active; runs to May 21, 2027
City Council moratorium ordinance; ordinance number not located in reviewed sources (Moratorium Nation)
Town of Woodfin Buncombe County Data centers In force
Active
Ordinance 2026-04 (Moratorium Nation)
Town of Garner Wake County Data centers, Crypto mining In force
Active
Ordinance No. (2026) 5383, An Ordinance Instituting a Temporary Moratorium on the Permitting and Issuance of Development Approvals for Data... (Moratorium Nation)
Town of Bailey Nash County Data centers In force
Active
Board of Commissioners moratorium on accepting, processing, or approving data center applications in the town and its extraterritorial... (Moratorium Nation)
Pasquotank County — Data centers, Crypto mining In force
Active
Board of Commissioners moratorium ordinance; N.C.G.S. 160D-107 (implied) (Moratorium Nation)
Town of Mayodan Rockingham County Data centers, Crypto mining, Solar Ended
Replaced by permanent rules
Ordinance Establishing a Temporary Moratorium on Development Approvals for Data Centers and Other High-Impact Facilities, and Ordinance... (Moratorium Nation)
Town of Spring Hope Nash County Data centers In force
Active
Resolution 2026-01, imposing a one-year pause on data centers within the town and its extraterritorial jurisdiction (Moratorium Nation)
Northampton County — Data centers, Crypto mining In force
Active
Board of Commissioners moratorium ordinance covering unincorporated areas; ordinance/resolution number not located in reviewed sources; N.C.G.S.... (Moratorium Nation)
Harnett County — Data centers, Crypto mining In force
Active; runs to May 4, 2027
Ordinance 2026-17, An Ordinance of the County of Harnett Imposing a Temporary Moratorium on Development Approvals for Data Centers (covers data... (Moratorium Nation)
City of Durham Durham County Data centers, Crypto mining In force
Extended; runs to May 3, 2027
Initial ordinance imposing a temporary moratorium on development approvals for data centers, cryptocurrency mining operations and any use... (Moratorium Nation)
Watauga County — Data centers In force
Active; runs to Apr 21, 2027
County data center moratorium proposed under N.C.G.S. 160D-107. [Evidence ceiling: Watauga County's BOC agendas/minutes archives at... (Moratorium Nation)
Swain County — Data centers In force
Active
County moratorium ordinance on permitting and development approvals for data centers and other high-impact facilities, agenda voting item V(a) for... (Moratorium Nation)
Orange County — Data centers, Crypto mining In force
Active
Ordinance establishing one-year moratorium on large-scale data centers; N.C.G.S. 160D-107 (Moratorium Nation)
Rowan County — Data centers In force
Active
Adopted under N.C.G.S. 160D-107 following Legislative Hearing Notice issued April 6, 2026 by Clerk Sarah Pack; the Notice expressly limits the... (Moratorium Nation)
Town of Clyde Haywood County Data centers In force
Active
Town moratorium under N.C.G.S. 160D-107: "Town shall not accept, process or approve any application for zoning permits, conditional use permits,... (Moratorium Nation)
Town of Apex Wake County Data centers, Crypto mining In force
Active
Town-wide moratorium noticed under N.C.G.S. 160D-107 and 160D-601; covers acceptance, processing, and approval of development applications for... (Moratorium Nation)
Town of Wendell Wake County Data centers, Crypto mining In force
Active; runs to Dec 31, 2026
Town moratorium on acceptance/processing of development applications for data centers, data processing facilities, and cryptocurrency mining;... (Moratorium Nation)
Town of Boone Watauga County Data centers, Crypto mining In force
Active
Town ordinance banning development of data centers and cryptocurrency mining operations for one year, adopted after public hearing process under... (Moratorium Nation)
City of Brevard Transylvania County Data centers Ended
Replaced by permanent rules
City Council moratorium on data centers and similar high-intensity land uses adopted under N.C.G.S. 160D-107 (Brevard's land-use authority); March... (Moratorium Nation)
City of Kings Mountain Gaston County Data centers In force
Extended; runs to Aug 25, 2027
Ordinance 26-11, adopted 5-2 on motion by Councilmember Annie Thombs (seconded by Lemmond), enacting 182-day moratorium on permitting new data... (Moratorium Nation)
Town of Canton Haywood County Data centers, Crypto mining In force
Active
Town moratorium ordinance ("A Proposed Moratorium Ordinance Regulation Data Centers, Cryptocurrency Mining Facilities, and Server Farms") taken up... (Moratorium Nation)
Chatham County — Data centers, Crypto mining In force
Active; runs to Feb 11, 2027
Ordinance 26-0061; N.C.G.S. 160D-107; hearing under N.C.G.S. 160D-601 (Moratorium Nation)
Gates County — Data centers In force
Active
Ordinance imposing temporary moratorium on development approvals for data centers and related high-impact facilities; N.C.G.S. 160D-107 (Moratorium Nation)
Cherokee County — Crypto mining, Data centers Ended
Expired
High-Impact Facility Moratorium adopted under N.C.G.S. 160D-107(a) and 160D-107(d); ordinance text recites Cherokee County Comprehensive Plan... (Moratorium Nation)
Madison County — Data centers, Crypto mining Ended
Expired
Madison County Limited Moratorium on Data Processing Facilities, adopted June 13, 2023 (per County Manager Rod Honeycutt press release, confirmed... (Moratorium Nation)
McDowell County — Crypto mining Ended
Replaced by permanent rules
January 8, 2024 Board minutes state the adopted cryptocurrency ordinance ended the moratorium. (Moratorium Nation)
Buncombe County — Crypto mining Ended
Replaced by permanent rules
Ordinance 23-05-05 and extension Ordinance 24-05-09; N.C.G.S. 160D-107 (Moratorium Nation)
Henderson County — Crypto mining Ended
Replaced by permanent rules
Board of Commissioners public hearing item 2023.62; temporary moratorium on cryptocurrency mining (Moratorium Nation)
— Town of Elizabethtown Bladen County Data centers Pending
Pending (not yet enacted)
Proposed Code of Ordinances amendment: temporary moratorium on development approvals for data centers under G.S. 160D-107 (draft ordinance posted... (Moratorium Nation)
— Halifax County — Data centers Pending
Pending (not yet enacted)
Proposed Halifax County data center moratorium, N.C.G.S. 160D-107; legislative hearing set for 2026-10-19 (Moratorium Nation)
— Guilford County — Data centers Pending
Pending (not yet enacted)
Proposed Guilford County temporary moratorium on data centers (up to 180 days), N.C.G.S. 160D-107 (Moratorium Nation)
— City of Raleigh Wake County Data centers Pending
Pending (not yet enacted)
Proposed City of Raleigh moratorium on new data centers of 10,000 sq ft or larger (draft by city attorney), N.C.G.S. 160D-107 (Moratorium Nation)
— Beaufort County — Data centers Pending
Pending (not yet enacted)
Proposed Beaufort County one-year moratorium on the acceptance, processing and approval of applications for data center developments (Moratorium Nation)

Moratorium records marked “Moratorium Nation” come from the Moratorium Nation inventory by Michael J. Bommarito, licensed CC BY 4.0; status follows that inventory, and we mark a record ended once its recorded end date has passed. Records marked “Siting Radar” are our own detections in public meeting documents: the status is the latest step we saw, with a link to the source. Not legal advice.

Download our North Carolina detections (CSV, our summaries only) · About the open data

Moratoria by month

Local moratoria enacted or adopted in North Carolina Last 24 months; pending and proposed items are not counted.
  • Moratorium Nation (enacted)
  • Siting Radar detections not in that inventory (adopted)
05101520Dec 2024: 0 (Moratorium Nation 0, Siting Radar 0)Dec ’24Jan 2025: 0 (Moratorium Nation 0, Siting Radar 0)Feb 2025: 0 (Moratorium Nation 0, Siting Radar 0)Mar 2025: 0 (Moratorium Nation 0, Siting Radar 0)Mar ’25Apr 2025: 0 (Moratorium Nation 0, Siting Radar 0)May 2025: 0 (Moratorium Nation 0, Siting Radar 0)Jun 2025: 0 (Moratorium Nation 0, Siting Radar 0)Jun ’25Jul 2025: 0 (Moratorium Nation 0, Siting Radar 0)Aug 2025: 0 (Moratorium Nation 0, Siting Radar 0)Sep 2025: 0 (Moratorium Nation 0, Siting Radar 0)Sep ’25Oct 2025: 0 (Moratorium Nation 0, Siting Radar 0)Nov 2025: 0 (Moratorium Nation 0, Siting Radar 0)Dec 2025: 1 (Moratorium Nation 1, Siting Radar 0)Dec ’25Jan 2026: 0 (Moratorium Nation 0, Siting Radar 0)Feb 2026: 3 (Moratorium Nation 3, Siting Radar 0)Mar 2026: 2 (Moratorium Nation 2, Siting Radar 0)Mar ’26Apr 2026: 7 (Moratorium Nation 7, Siting Radar 0)May 2026: 11 (Moratorium Nation 11, Siting Radar 0)Jun 2026: 7 (Moratorium Nation 7, Siting Radar 0)Jun ’26Jul 2026: 5 (Moratorium Nation 5, Siting Radar 0)Aug 2026: 16 (Moratorium Nation 16, Siting Radar 0)Sep 2026: 7 (Moratorium Nation 7, Siting Radar 0)Sep ’26Oct 2026: 1 (Moratorium Nation 0, Siting Radar 1)Nov 2026: 0 (Moratorium Nation 0, Siting Radar 0)Nov ’26
Show as a table
MonthMoratorium NationSiting RadarTotal
Nov 2026000
Oct 2026011
Sep 2026707
Aug 202616016
Jul 2026505
Jun 2026707
May 202611011
Apr 2026707
Mar 2026202
Feb 2026303
Jan 2026000
Dec 2025101
Nov 2025000
Oct 2025000
Sep 2025000
Aug 2025000
Jul 2025000
Jun 2025000
May 2025000
Apr 2025000
Mar 2025000
Feb 2025000
Jan 2025000
Dec 2024000

Who decides siting in North Carolina

General information about state law as checked on Sep 29, 2026, with sources. Not legal advice; thresholds, exemptions and pending legislation change.

  • Building an electric generating facility requires a certificate of public convenience and necessity from the North Carolina Utilities Commission (G.S. 62-110.1(a)).[1]
  • Non-utility clean-energy facilities under 2 MW, facilities mainly for the owner’s own use and some solar programs are exempt and file a report of proposed construction instead (G.S. 62-110.1(g)).[1][2]
  • Wind projects of 1 MW or more need a permit from the Department of Environmental Quality (DEQ), which must deny it if local zoning or other required approvals are missing or if the project would significantly harm military missions (G.S. 143-215.115 to .121).[3][4]
  • Utility-scale solar (ground-mounted, 2 MW AC or more, selling to the grid) must register with DEQ and provide a sealed decommissioning plan and financial assurance; the requirements took effect Nov 1, 2025 (G.S. 130A-309.240).[5][6]
  • Counties and cities may adopt zoning regulations (G.S. 160D-702).[7]
  • We found no state siting permit for data centers or stand-alone battery storage, so they appear to go through local zoning only. (Not verified against the primary text.)[7][1]
  • SB 730, which would require sound site assessments for data centers of 100 MW or more near homes and schools, passed the House on Jun 3, 2026 but had not been enacted when we checked.[8]
  • Other siting bills (HB 729 farmland protection, SB 513 wind, HB 1189 data-center transparency) were still pending, not enacted.[9][10][11]
  1. N.C. Gen. Stat. 62-110.1 (as amended by S.L. 2025-78) (text retrieved Sep 29, 2026; checked Sep 29, 2026)
  2. NC Public Staff, Energy Division, “Builders and owners of renewable energy facilities” (undated page, retrieved Sep 29, 2026; checked Sep 29, 2026)
  3. N.C. Gen. Stat. Chapter 143, Article 21C (wind energy facilities) (text retrieved Sep 29, 2026; checked Sep 29, 2026)
  4. N.C. Gen. Stat. 143-215.120 (text retrieved Sep 29, 2026; checked Sep 29, 2026)
  5. N.C. Gen. Stat. 130A-309.240 (text retrieved Sep 29, 2026; checked Sep 29, 2026)
  6. NC DEQ, Utility-Scale Solar Project Decommissioning Program (page retrieved Sep 29, 2026; checked Sep 29, 2026)
  7. N.C. Gen. Stat. 160D-702 (as amended by S.L. 2025-94) (text retrieved Sep 29, 2026; checked Sep 29, 2026)
  8. NC General Assembly, Senate Bill 730 (2025–2026), bill status (status as of Jun 8, 2026; checked Sep 29, 2026)
  9. NC General Assembly, House Bill 729 (2025–2026), bill status (last action Apr 30, 2025; checked Sep 29, 2026)
  10. NC General Assembly, Senate Bill 513 (2025–2026), bill status (last action May 7, 2025; checked Sep 29, 2026)
  11. NC General Assembly, House Bill 1189 (2025–2026), bill status (last action May 5, 2026; checked Sep 29, 2026)

Recent siting-rule activity (last 90 days)

On the agenda (before the vote) Moratorium Data centers

Guilford County, NC

Board of Commissioners ·
“A. PUBLIC HEARING: CONSIDER THE ADOPTION OF A PROPOSED MORATORIUM ON DEVELOPMENT APPROVALS FOR NEW DATA CENTERS, WITH POTENTIAL EXEMPTIONS File: 2026-452 | Public Hearing | Agenda Ready”
Source document, p. 1 (opens in a new tab) Agenda +1 related mention
Extended Moratorium Data centers

City of Charlotte, NC

City Council Business Meeting · · Mecklenburg County
“Extension of the Temporary Moratorium on New Telecommunications and Data Storage Facilities File: 15-26877 | Policy Item | Agenda Ready Action: Approve Pass.”
Source document, p. 1 (opens in a new tab) Minutes +1 related mention
Hearing notice Moratorium Data centers

Davidson County, NC

Governing body not stated ·
“er an ordinance to impose a proposed four (4) month moratorium on development approvals for data centers, including the acceptance, processing, and approval of applications for data centers in Davidson County.”
On the agenda (before the vote) Moratorium Data centers

Montgomery County, NC

Board of Commissioners ·
“Consider an Ordinance Establishing a Temporary Moratorium on Certain Development Approvals for Large-Scale Data Centers & Related High-Impact Facilities”
Source document, p. 2 (opens in a new tab) Agenda +8 related mentions
On the agenda (before the vote) Zoning amendment Data centers

Davidson County, NC

Planning Board ·
“Data Center Text Amendment All of the text that is in RED is new text and is open for debate or subject to change upon discussion.”
Source document, p. 15 (opens in a new tab) Agenda +4 related mentions
On the agenda (before the vote) Zoning amendment Data centers

City of Mount Airy, NC

Board of Commissioners · · Surry County
“and Article XV of the City of Mount Airy Zoning Ordinance: (Data Center Ordinance) Ordinance No. 2027-013”
Source document, p. 1 (opens in a new tab) Agenda +11 related mentions
On the agenda (before the vote) Moratorium Data centers

Guilford County, NC

Board of Commissioners ·
“A. PUBLIC HEARING: CONSIDER THE ADOPTION OF A PROPOSED 180-DAY MORATORIUM ON DEVELOPMENT APPROVALS FOR NEW OR EXPANDED DATA CENTER, WITH POTENTIAL EXEMPTIONS File: 2026-439 | Public Hearing | Agenda Ready”
Source document, p. 1 (opens in a new tab) Agenda +1 related mention
On the agenda (before the vote) Zoning amendment Data centers

Town of Indian Trail, NC

* Town Council · · Union County
“The Conditional Zoning application submittal for a data center use requires the following in addition to any other requirements that apply in this ordinance.”
Source document, p. 17 (opens in a new tab) Agenda +5 related mentions
On the agenda (before the vote) Moratorium Data centers

McDowell County, NC

Governing body not stated ·
“Old Business A.​ Water System Project Updates ​ ​ B.​ County Facility Updates C.​ Opioid Settlement Fund Resolutions D.​ Data Center Moratorium Update”
On the agenda (before the vote) Moratorium Data centers

City of Charlotte, NC

Board of Adjustment · · Mecklenburg County
“…Conduct a public hearing on an extension of the 150-day temporary moratorium on the acceptance, processing, and approval of applications for new telecommunications and data storage facilities within the City of…”
Source document, p. 7 (opens in a new tab) Agenda +6 related mentions
On the agenda (before the vote) Zoning amendment Data centers

Davidson County, NC

Planning Board ·
“Our last item on the agenda is a text amendment, initiated by the Davidson County Board of Commissioners (BOC), to edit the Davidson County Zoning Ordinance by adding, defining, and regulating the new use of Data Center.”
Source document, p. 1 (opens in a new tab) Agenda +4 related mentions
On the agenda (before the vote) Moratorium Data centers

City of Raleigh, NC

City Council Meeting - First Tuesday - Afternoon & Evening Sessions · · Wake County
“…use-specific standards to address the unique impacts that larger-scale data centers bring to a jurisdiction, which include but are not limited to, considerable land, water and electrical consumption, noise and light…”
Extended Moratorium Data centers

City of Kings Mountain, NC

City Council Meeting Agendas and Minutes · · Gaston County
“City Council recently enacted a twelve-month extension on the existing moratorium for data center development to allow staff time to study and create standards that will protect public health, safety and property values…”

Frequently asked questions

How many local moratoria are there in North Carolina?

As of Nov 15, 2026 we list 84 local moratoria in North Carolina: 69 from the Moratorium Nation inventory (CC BY 4.0) and 15 more found in meeting documents we monitor. 57 are in force or recently adopted, 19 are pending or proposed and 8 have ended. Coverage is partial, so the real number is likely higher.

Which North Carolina communities have a data center moratorium?

As of Nov 15, 2026, 56 North Carolina governments have a data center moratorium in force or recently adopted in our records, including Town of Butner, Vance County, City of Statesville, City of Southport, Nash County, City of Lincolnton, City of Hendersonville, Town of Newport, McDowell County, Town of Cary, City of Whiteville, Town of Hildebran and 44 more. Most are temporary moratoria, not permanent bans; check the linked records for dates.

Which North Carolina communities have a solar moratorium?

1 North Carolina government has a solar moratorium in force or recently adopted in our records as of Nov 15, 2026, including Pasquotank County.

Which North Carolina communities have a battery storage moratorium?

1 North Carolina government has a battery storage moratorium in force or recently adopted in our records as of Nov 15, 2026, including City of Wilson.

Are any moratorium or siting votes coming up in North Carolina?

Yes. We have 1 upcoming hearing or vote on moratoria and siting rules in North Carolina in the next 120 days; the next is in City of Kings Mountain on Feb 23, 2027 (hearing notice). The list on this page is updated daily.

Who approves large solar, wind and battery projects in North Carolina?

Building an electric generating facility requires a certificate of public convenience and necessity from the North Carolina Utilities Commission (G.S. 62-110.1(a)). Which state and local rules apply to a given project depends on its type and size; the cited notes on this page summarise North Carolina's siting authority as of Sep 29, 2026. General information, not legal advice.

Is this legal advice?

No. This page is information compiled automatically from public records and the Moratorium Nation inventory. It may be incomplete or out of date. Read the linked sources and confirm with the local government and your counsel.