New York: local moratoria and siting rules

Data center, battery storage, solar and wind siting activity in New York's 1,589 counties, towns, cities and villages.

We monitor 1,255 of 1,589 New York governments (79%). Coverage by state

All New York moratoria: table, map and FAQ Browse by county

Pending votes and hearings

  1. Hearing notice Moratorium Data centers

    Mamakating Town, NY

    Town Board · (upcoming) · Sullivan County
    “b. Reschedule Public Hearing for Data Center Moratorium on November 17th at 6 pm”
    Source document, p. 1 (opens in a new tab) Agenda for Oct 20, 2026 +2 related mentions

Recent activity (last 60 days)

Hearing notice Moratorium Battery storage (BESS)

Cambria Town, NY

2026 Town Board Meetings · · Niagara County
“Ayes: Foe, Brachmann, Hurtgam, Musall, Roberts -Motion Carried- Request to introduce a new local law extending the moratorium on BESS.”
Source document, p. 4 (opens in a new tab) Minutes for Oct 8, 2026 +1 related mention
Hearing notice Moratorium Data centers

Lysander Town, NY

Town Board · · Onondaga County
“Supervisor Rode announced that a public hearing regarding the Data Center Moratorium will be held on November 5.”
On the agenda (before the vote) Zoning amendment Battery storage (BESS)

Skaneateles Town, NY

Town Board 6:30 pm · · Onondaga County
“12. Introductory Local Law F of 2026 “A Local Law Amending Chapter 148 of the Code of the Town of Skaneateles”
Source document, p. 1 (opens in a new tab) Agenda +1 related mention
Hearing notice Zoning amendment Battery storage (BESS)

Windsor Town, NY

Zoning Board of Appeals · · Broome County
“…at Windsor Town Hall, 124 Main Street, Windsor, NY on the proposed local law “Local Law Amending Chapter 93 (Zoning) by Adding A New Article XVIII Entitled “Battery Energy Storage Systems” and Amending Section…”
Source document, p. 2 (opens in a new tab) Minutes for Oct 7, 2026 +1 related mention
Hearing notice Siting ordinance Solar

Greenwich Town, NY

Governing body not stated · · Washington County
“…12834 LEGAL NOTICE OF A PUBLIC HEARING ON THE AMENDMENT TO SOLAR ENERGY LAW FOR THE TOWN OF GREENWICH TAKE NOTICE that a public hearing will be held by the Greenwich Town Board at the Town Office, 2 Academy St.…”
Source document, p. 1 (opens in a new tab) Other +8 related mentions
On the agenda (before the vote) Moratorium Crypto miningData centers

Marcellus Town, NY

Governing body not stated · · Onondaga County
“TOWN OF MARCELLUS LOCAL LAW NO. E-2026 A Local Law Imposing a Twelve (12) Month Moratorium on Commercial Cryptocurrency Mining Operations, Data Mining, Data Processing Centers, and Data Storage Facilities Within the…”
Public hearing Moratorium Battery storage (BESS)Crypto miningData centers

Marcellus Town, NY

Governing body not stated · · Onondaga County
“A. Local Law NO. E of 2026 Twelve (12) Month Moratorium on Commercial Cryptocurrency Mining Operations, Data Mining, Data Processing Centers, and Data Storage Facilities Within the Town of Marcellus”
Source document, p. 1 (opens in a new tab) Agenda +1 related mention
On the agenda (before the vote) Siting ordinance Battery storage (BESS)Crypto mining

Marcellus Town, NY

Governing body not stated · · Onondaga County
“B. Local Law C of 2026 Regulating Battery Energy Storage Systems in the Town of Marcellus ilI.”
On the agenda (before the vote) Moratorium Battery storage (BESS)Data centersWind

Williamstown Town, NY

Town Board · · Oswego County
“site use shall not be considered a commercial energy storage system and shall be specifically exempted from this moratorium. Data Center - are defined, for the purpose of this local law, any facility, in whole or in…”
Public hearing Moratorium Battery storage (BESS)Solar

City of Oneida, NY

Common Council - Regular Mtng/Budget Session · · Madison County
“…26- Moved by Councilor Seconded by Councilor RESOLvED, that the Public Hearing on a proposed Local Law imposing a six (6) month moratorium on Commercial Free-Standing Solar Photovoltaic (PV) Systems and Battery Energy…”
Source document, p. 4 (opens in a new tab) Packet +2 related mentions
Hearing notice Moratorium Battery storage (BESS)Solar

City of Oneida, NY

Common Council - Regular Mtng/Budget Session · · Madison County
“PUBLIC HEARING: Proposed Local Law imposing a six (6) month moratorium on Commercial Free- Standing Solar Photovoltaic (PV) Systems and Battery Energy Storage Systems within the City of Oneida”
Source document, p. 1 (opens in a new tab) Packet +1 related mention
On the agenda (before the vote) Siting ordinance Solar

Constantia Town, NY

Zoning Commission · · Oswego County
“and it is further RESOLVED AND DETERMINED that pending action of this Local Law, the Town of Constantia will neither accept nor process &ny applieation/pertaining to commercial free-standing solar photovoltaic (PV)…”
On the agenda (before the vote) Moratorium Solar

Constantia Town, NY

Zoning Commission · · Oswego County
“so undertaking the process of drafting and adopting a new comprehensive zoning law in the Town which includes regulations pertaining to commercial freestanding solar systems WHEREAS, this moratorium will enable the Towh…”
On the agenda (before the vote) Moratorium Data centers

Hamburg Town, NY

Town Board · · Erie County
“…For purposes of the proposed Local Law, a "Data Center" shall mean a building, facility, or group of buildings and facilities used primarily for the housing, operation, management, processing, storage, transmission, or…”
On the agenda (before the vote) Siting ordinance Battery storage (BESS)

Grand Island Town, NY

Town Government · · Erie County
“Town of Grand Island Regular Meeting #18 WHEREAS, the Town's Battery Energy Storage Systems Law, Chapter 108, calls for Planning Board review and recommendation in connection with Town Board consideration of a Tier 2…”
On the agenda (before the vote) Siting ordinance Battery storage (BESS)

Grand Island Town, NY

Town Government · · Erie County
“and WHEREAS, the Town Board has authority to act on the requested Tier 2 battery energy storage special use permit under the Town's Battery Energy Storage Systems Law, Chapter 108, and intends to review the whole…”
On the agenda (before the vote) Moratorium Battery storage (BESS)

Cambria Town, NY

Niagara County Planning Board · · Niagara County
“– Town of Cambria – Moratorium Extension Request by the Town of Cambria Town Board for the Planning Board to review a Local Law extending the existing 9 month Moratorium on Utility-Scale BESS Systems within the Town for…”
Hearing notice Moratorium Data centers

Hamburg Town, NY

Town Board · · Erie County
“Public Hearing Proposed Local Law 18, 2026 Notice of Public Hearing on Proposed Local Law #18, 2026 Establishing a One-year Moratorium on the Approval and Development of New Large Scale Data Centers within the Town of…”
On the agenda (before the vote) Moratorium Battery storage (BESS)

Cambria Town, NY

2026 Planning Board Meetings · · Niagara County
“NEW BUSINESS: Referral of Extension of the Moratorium of the Battery Energy Storage Systems (BESS) from the Town Board”
Hearing notice Moratorium Battery storage (BESS)Data centers

Village of Springville, NY

Board of Trustees · · Erie County
“…St – 2nd floor court/board room for the purpose of the proposed Local Law 12 of 2026 Chapter 200-1 Moratorium on Data Centers and Stand Alone Battery Storage Units. .”
On the agenda (before the vote) Zoning amendment Solar

Ithaca Town, NY

Governing body not stated · · Tompkins County
“Town of Ulysses Village of Lansing Large Scale Solar Town of Lansing Overlay Zone (2026 Update) Town of Ithaca Village of October 6, 2026 Cayuga Heights Hanshaw DRAFT Dryden·Rd Town of Dryden Areas Where City of Ithaca…”
Hearing notice Siting ordinance Battery storage (BESS)

Hampton Town, NY

Governing body not stated · · Washington County
“…72-2026 PUBLIC HEARING-PROPOSED LOCAL LAW REGULATING THE LOCATION OF BATTERY ENERGY STORAGE SYSTEMS On a motion of Councilman Perry, seconded by Councilwoman Taran, the following resolution was ADOPTED: AYES”

Enacted moratoria on record

From the Moratorium Nation inventory by Michael J. Bommarito, licensed CC BY 4.0; we link each record to our jurisdiction page. We use it to measure our own lead time. 150 records for New York.

EnactedJurisdictionUsesLegal basis (as recorded)
2026-08-25 Orangetown Town Battery storage (BESS), Data centers Town of Orangetown Local Law No. 5 of 2026, adding Article XX to Chapter 43 (Zoning)
2026-08-13 Le Ray Town Data centers Town of LeRay local law establishing a moratorium on data centers
2026-08-13 Mohawk Town Data centers Town of Mohawk local law imposing a six-month moratorium on data center permitting
2026-08-11 Islip Town Data centers Town of Islip Town Code Chapter 68-761, an 18-month moratorium on data center development
2026-08-03 Tonawanda Town Data centers Local law imposing a one-year moratorium on data centers of 20 MW or more, Town of Tonawanda, Erie County; signed/filed text not located.
2026-07-22 Tyre Town Data centers Town of Tyre Local Law No. 2 of 2026, "A Local Law Establishing a Moratorium on Data Centers and Artificial Intelligence Computing Facilities within the...
2026-07-16 Brookhaven Town Data centers Chapter 17 ('Moratorium'), Article I ('Data Centers') of the Town Code of the Town of Brookhaven, added by a local law unanimously adopted 6-0 (Councilwoman...
2026-07-15 East Greenbush Town Data centers Local Law No. 3 of 2026 (Town of East Greenbush), 'A Local Law Imposing a Moratorium on Applications for Permits, Site Plans or Other Land Use Approvals for...
2026-07-09 Manlius Town Data centers, Crypto mining Manlius Town Board local law/resolution (unanimous, 7-0)
2026-07-09 Newfield Town Data centers, Crypto mining Local Law Imposing a Temporary Town-Wide One Year Moratorium on Data Processing Centers, Town of Newfield, Tompkins County; the town's public Town Laws &...
2026-07-08 Canton Town Data centers Town of Canton local law establishing a moratorium on data center development
2026-07-07 Clifton Park Town Data centers Local Law No. 9 of 2026
2026-06-29 Clay Town Data centers, Crypto mining Local Law No. 6 of 2026 (Town of Clay, Onondaga County), 'A Local Law providing for a Temporary Moratorium for Twelve (12) Months prohibiting any zone...
2026-06-25 East Fishkill Town Data centers Local Law No. 3 of 2026 (Town of East Fishkill), titled 'A Local Law to Extend, Consolidate and Impose a Moratorium on Certain Properties Within the Town of...
2026-06-24 Bethlehem Town Data centers Local law establishing a temporary 12-month moratorium on development or construction of data centers, Town of Bethlehem, Albany County; signed/filed text...
2026-06-15 Arietta Town Battery storage (BESS) Local Law No. 01 of 2026, Establishing a Moratorium on Battery Energy Storage Systems (Resolution 26-06-30)
2026-06-09 Highland Town Data centers Local Law No. 1 of 2026, 'Data Center Moratorium,' Town of Highland, Sullivan County; unanimously adopted by the Town Board on 2026-06-09 following a public...
2026-06-04 Perth Town Data centers Local law imposing a one-year moratorium on data center development, Town of Perth, Fulton County; full signed text not located behind the Leader Herald paywall.
2026-06-03 Van Buren Town Data centers, Crypto mining Local Law 2-2026
2026-06 Ellery Town Solar, Wind, Battery storage (BESS) Town of Ellery moratoriums on commercial solar, wind, and battery energy storage systems
2026-06 Huntington Town Battery storage (BESS) Local Law No. 17-2026 (referred to Suffolk County Planning Commission as file HU-26-04)
2026-06 Stockport Town Battery storage (BESS) Local Law 1-2026, Moratorium on Battery Storage Systems, Town of Stockport
2026-06 Wilton Town Battery storage (BESS) Local Law (Town of Wilton BESS Moratorium Law, CZRC-approved draft posted 2026-05-07)
2026-05-27 Salina Town Data centers, Crypto mining Local Law No. 5 of 2026
2026-05-21 Southeast Town Data centers Local Law No. 3 of 2026
2026-05-20 Thurston Town Data centers, Crypto mining Resolution 20 and Local Law No. 5 of 2026
2026-05-15 Oneonta Town Data centers, Crypto mining Proposed local law: "Moratorium on the Development, Construction, and Operation of Data Centers and Commercial Cryptocurrency Mining Operations"
2026-05-14 Spafford Town Battery storage (BESS) Local Law No. 1-2026 (Resolution 46-2026), a town-wide 12-month moratorium on the siting, placement, installation, construction, modification or enlargement...
2026-05-07 Lysander Town Data centers Local Law No. 4 of 2026, 'A Local Law Establishing a Temporary Six Month Moratorium on Development or Construction of Data Storage Facilities Within the...
2026-05-06 Marcellus Town Battery storage (BESS) Local Law No. A of 2026, A Local Law Imposing a Twelve (12) Month Moratorium on Battery Energy Storage Systems within the Town of Marcellus
2026-05 Benson Town Battery storage (BESS) Local Law No. 1 of 2026, Establishing a Moratorium on Battery Energy Storage Systems
2026-05 Ticonderoga Town Battery storage (BESS) Town of Ticonderoga Local Law No. __ of 2026, a moratorium on locating battery energy storage systems (Tier 2/Tier 3 BESS)
2026-04-13 Lewiston Town Data centers, Crypto mining Local Law No. 3 of 2026, 'A Local Law Imposing a Moratorium on the Establishment, Construction, Expansion, or Operation of Data Centers, Artificial...
2026-04-09 Byron Town Battery storage (BESS) Town of Byron local law imposing a temporary moratorium on battery energy storage system facilities (cited as Local Law #3 of 2026 in the 2026-09-09...
2026-04-09 Byron Town Solar Town of Byron local law imposing a temporary moratorium on renewable energy projects (cited as Local Law #2 of 2026 in the 2026-09-09 extension hearing...
2026-03-20 Hartwick Town Solar Town of Hartwick local law imposing a six-month moratorium on solar energy systems
2026-03-16 Lewis Town Solar, Battery storage (BESS), Wind Town of Lewis local law imposing a moratorium on the acceptance or approval of applications for permits authorizing solar energy systems, battery energy...
2026-03-10 Camillus Town Battery storage (BESS) Town of Camillus Local Law No. A-2026, a twelve-month moratorium on all battery energy storage systems (Tier 1 and Tier 2)
2026-03-02 Cairo Town Battery storage (BESS) Local Law #2 of 2026, 'A Local Law Imposing a Temporary Town-Wide Six-Month Moratorium on Battery Energy Storage Systems,' adopted by the Cairo Town Board...
2026-03 Athens Town Battery storage (BESS) Town of Athens moratorium on battery energy storage system facilities
2026-03 Northampton Town Battery storage (BESS) Local Law No. 01 of 2026, the Town of Northampton Battery Energy Storage Moratorium
2026-02-10 Schroeppel Town Solar Local Law 1 of 2026, imposing a one-year moratorium on commercial free-standing solar systems within the Town of Schroeppel
2026-02-03 Denmark Town Solar, Battery storage (BESS) Town of Denmark Local Law No. 1 of 2026, establishing a twelve-month moratorium on commercial solar energy systems, battery energy storage systems (BESS),...
2026-02 Newfane Town Battery storage (BESS) 2026 Temporary Moratorium Law on Battery Energy Storage System (BESS) Facilities, Local Law No. 1-2026 of the Town of Newfane
2026-02 City of Syracuse Battery storage (BESS) Syracuse Common Council ordinance (BESS moratorium)
2026-01-14 Sherburne Town Battery storage (BESS) Town Board resolution adopting a 6-month moratorium on the construction of battery storage facilities (Town of Sherburne, no zoning code; local law number...
2026-01 Greig Town Solar, Wind, Battery storage (BESS) Town of Greig Local Law 2026-01, a moratorium on commercial renewable energy systems (solar, wind energy primary systems, battery energy storage systems,...
2025-12-02 City of Amsterdam Battery storage (BESS), Solar City of Amsterdam moratorium on industrial solar and battery energy storage systems
2025-10-08 Salem Town Battery storage (BESS) Local Law #1 of 2025
2025-09-30 Hurley Town Battery storage (BESS) 2025 Battery Energy Storage System Facilities Moratorium Law of the Town of Hurley (proposed local law dated Sept. 30, 2025); extended by Town Board...
2025-09 Dunkirk Town Battery storage (BESS) Town of Dunkirk moratorium on battery energy storage systems
2025-08-11 City of Oswego Battery storage (BESS), Solar, Wind City of Oswego Local Law No. 1 of 2025, A Local Law Establishing a Moratorium on Certain Renewable Energy Systems
2025-07-21 Clifton Park Town Battery storage (BESS) Local Law No. 5 of 2025, A Local Law Establishing and Extending a Moratorium on Battery Energy Storage Systems Facilities in the Town of Clifton Park
2025-06-18 Glenville Town Battery storage (BESS) Town of Glenville local law (BESS moratorium)
2025-06 Mentz Town Battery storage (BESS) A Local Law Establishing a Temporary Land Use Moratorium Prohibiting Battery Energy Storage Systems Within the Town of Mentz
2025-06 Norfolk Town Battery storage (BESS) Local Law No. 5 of 2025, a Moratorium on all Energy Storage System Development in the Town of Norfolk
2025-06 Pendleton Town Battery storage (BESS) Local Law No. 2 of 2025
2025-06 Watson Town Battery storage (BESS) Local Law No. 2 for the Year 2025, A Local Law Enacting a Temporary Moratorium on Utility-Scale Energy Storage Systems (covering both Compressed Air Energy...
2025-06 Village of Mayville Battery storage (BESS) Village of Mayville local law (BESS moratorium)
2025-05-27 Aurora Town Battery storage (BESS) Town of Aurora Local Law 5-2025, a six-month moratorium on new applications for battery energy storage systems
2025-05-13 City of Glen Cove Battery storage (BESS) City of Glen Cove moratorium on battery energy storage systems
2025-05-06 Berne Town Solar, Battery storage (BESS) Town of Berne moratorium on commercial solar facilities (extended to add battery energy storage systems on 2026-03-11)
2025-05-02 Mina Town Battery storage (BESS) Town of Mina 2026 Temporary Moratorium Law on Battery Energy Storage System Facilities, Local Law No. 6 of 2026, replacing Local Law #1-2025 (effective...
2025-03-24 City of Peekskill Battery storage (BESS) Local Law No. 3 of 2025 (original, adopted following the 2025-03-24 hearing; filed 2025-05-05, expired 2025-11-05); further extended by Local Law No. 14 of...
2025-03-11 City of Gloversville Battery storage (BESS), Solar City of Gloversville local law establishing a moratorium on industrial solar and battery energy storage systems, later superseded by a permanent ban
2025-03 Hempstead Town Battery storage (BESS) Town Code Chapter 101B; most recent extension Local Law No. 75-2026 (Resolution No. 801-2026), adopted 2026-09-09
2025-02-11 New Castle Town Battery storage (BESS) Local Law No. 1 of 2025, a Six-Month Moratorium Prohibiting the Review and Approval of Applications and Permits for Battery Energy Storage Systems
2025-02-11 Southport Town Battery storage (BESS), Solar Local Law No. 1 of 2025, A Six-Month Moratorium on Commercial Solar Energy Systems and Commercial Energy Storage Systems within the Town of Southport...
2025-02 Albion Town Battery storage (BESS), Solar Town of Albion local law (solar/BESS moratorium, 2025); later superseded by amendment to Chapter 106 (BESS) of the Town Code
2025 Chester Town Battery storage (BESS) Town of Chester local law prohibiting large-scale battery energy storage system installations (Local Law 10 of 2025, extended by Local Law 3 of 2026)
2025 Eden Town Battery storage (BESS) Town of Eden local law prohibiting review and approval of Battery Energy Storage System applications (originally a six-month moratorium, extended twelve...
2025 Gardiner Town Battery storage (BESS) Town of Gardiner moratorium on battery energy storage systems
2025 German Flatts Town Solar, Wind Town of German Flatts local law (12-month solar & wind moratorium), reviewed by Herkimer County Planning Board 2025-05-19
2025 Montgomery Town Battery storage (BESS) Town of Montgomery Local Law No. 2 of 2025 (removing battery storage systems from the zoning code), following Introductory Local Law No. 1 of 2025
2025 North Harmony Town Battery storage (BESS), Solar Temporary Moratorium on Commercial Solar and Battery Energy Storage Systems in the Town of North Harmony; extended by Local Law 3 of 2025 (Resolution #12 of 2025)
2025 Pound Ridge Town Battery storage (BESS) Town of Pound Ridge BESS moratorium local law, replaced 2026-07-21 by permanent zoning amendment prohibiting large-scale BESS
2025 Rose Town Battery storage (BESS), Solar Town of Rose proposed moratorium on the construction of large-scale solar farms and battery storage units (referred to Wayne County Planning Board as a GML...
2025 Day Town Battery storage (BESS) Local Law No. 01 of 2025, A Local Law Imposing a Moratorium on Locating Battery Energy Storage Systems in the Town of Day
2025 Turin Town Battery storage (BESS) Village of Turin Local Law No. 01 of 2025 (original one-year moratorium on solar energy collectors/generators and battery storage facilities); extended 6...
2024-12-03 North Hempstead Town Battery storage (BESS) Town Code Chapter 76 (Temporary Moratorium on Battery Energy Storage System Facilities); established by L.L. No. 11-2024 (2024-12-03), extended by L.L. No....
2024-12 Milton Town Battery storage (BESS), Solar A Local Law Entitled "Establishing a Temporary Moratorium on Large/Commercial Scale Solar Energy Installations and Battery Storage Facilities in the Town of Milton"
2024-11-14 Stanford Town Battery storage (BESS), Wind Local Law #2 of 2024, A Local Law Imposing a Temporary Moratorium on Battery Energy Storage Systems and Wind Energy Conversion Systems (Resolution No. 11B of 2024)
2024-10-31 Angelica Town Battery storage (BESS), Solar, Wind Town of Angelica local law imposing a moratorium on solar energy systems, energy storage systems, and wind generation systems
2024-10-31 Village of Mamaroneck Battery storage (BESS) Code of the Village of Mamaroneck 342-84.5, as extended by Local Law 11-2025 and Local Law 14-2025
2024-10-14 Victory Town Battery storage (BESS) Local Law #2 of 2024, as extended by a June 2025 local law
2024-10 Cameron Town Battery storage (BESS), Solar Local Law No. 4 of 2024
2024-09-20 Smithtown Town Battery storage (BESS) Town Code Chapter 324, Moratorium on Battery Energy Storage Systems; originally L.L. No. 13-2024 (2024-09-20), extended by L.L. No. 1-2025, L.L. No. 6-2025,...
2024-09-19 Village of Wilson Battery storage (BESS) Local Law #5 (new Chapter 178, Battery Moratorium)
2024-09-11 West Bloomfield Town Battery storage (BESS), Solar Local Law No. 1 of 2026 (extending Local Law No. 4 of 2024 as extended by Local Law No. 3 of 2025)
2024-08-13 Bedford Town Battery storage (BESS) Town of Bedford local law prohibiting review and approval of applications for battery energy storage systems (Local Law No. 1-2025 extending the original...
2024-08 Village of Mount Kisco Battery storage (BESS) Village/Town of Mount Kisco Proposed Local Law No. 01-2025 (amending Chapter 110 zoning, superseding the moratorium)
2024-07-31 Dryden Town Data centers, Crypto mining Local Law No. 2 of 2024; draft Local Law No. 1 of 2026 extension; Local Law No. 2 of 2026 replacement zoning definitions
2024-07-26 Putnam Valley Town Battery storage (BESS), Solar, Wind Local Law #3 of 2024, Temporary Land Use Moratorium Prohibiting Large Scale Solar Installations, Large Scale Battery Energy Storage System Installations,...
2024-07-22 Concord Town Battery storage (BESS) Town of Concord battery energy storage system moratorium (Local Law No. 3-2024, extended by Local Law No. 2-2025 and a June 2026 six-month extension)
2024-07-16 City of North Tonawanda Data centers, Crypto mining Local Law 2024-2 (original 2-year moratorium on cryptocurrency mining and data processing centers), extended by a 2026 local law ('Local Law 2026 -...
2024-07-16 City of Yonkers Battery storage (BESS) General Ordinance 08-2024, as extended by General Ordinance 01-2025 and General Ordinance 07-2025 (GO.7-2025)
2024-07-09 Kent Town Battery storage (BESS) Local Law Establishing a Land Use Moratorium Prohibiting Lithium Storage Facilities (Introductory Local Law #1), adopted 2024-07-09; extended by a further...
2024-07-08 Newstead Town Battery storage (BESS), Solar Town of Newstead local law (Local Law 2 - BESS moratorium; Local Law 3 - wind moratorium)
2024-06-05 Babylon Town Battery storage (BESS) Town of Babylon 2026 Moratorium Law on Battery Energy Storage System Facilities (Local Law No. 2 of 2026, extending Local Law 11 of 2024)
2024-05-14 Leyden Town Battery storage (BESS), Solar Town of Leyden Local Law #1 of 2024, 'Establishing a Townwide Twelve (12) Month Moratorium for all Large Solar Energy Systems and/or Medium/Large Battery...
2024-04 Oyster Bay Town Battery storage (BESS) Town of Oyster Bay moratorium on battery energy storage systems
2024-03-19 Islip Town Battery storage (BESS) Town of Islip Town Code § 68-457, moratorium on Battery Energy Storage System permits
2024-03 Royalton Town Battery storage (BESS) Town of Royalton local law (BESS/renewable energy moratorium)
2024-03 Walworth Town Battery storage (BESS), Solar Local Law No. 1-2024 (To Implement a Temporary Moratorium Relative to Solar Facilities and Battery Storage)
2024-02 Poughkeepsie Town Battery storage (BESS) Town of Poughkeepsie local law (temporary town-wide moratorium on large-scale BESS)
2024 Boston Town Battery storage (BESS) Town of Boston Local Law No. 2-2024, a six-month moratorium prohibiting review and approval of battery energy storage system applications
2024 Brasher Town Battery storage (BESS) Town of Brasher moratorium on battery energy storage systems
2024 Busti Town Battery storage (BESS) Local Law 3 of 2026 (extending prior commercial BESS moratorium)
2024 Carmel Town Battery storage (BESS), Solar Town of Carmel Local Law #5 of 2024 (moratorium), superseded by a permanent zoning law banning Tier 2 battery energy storage systems (>600 kWh)
2024 Claverack Town Battery storage (BESS) Town of Claverack Local Law No. 2 of 2024, a moratorium on Battery Energy Storage Systems
2024 Clymer Town Battery storage (BESS) Town of Clymer battery storage moratorium (all-BESS scope)
2024 Concord Town Solar Town of Concord solar energy moratorium (a separate local law from the BESS moratorium, extended in parallel)
2024 Cortlandt Town Battery storage (BESS) Town of Cortlandt moratorium for new Battery Energy Storage Systems (originally Local Law 2-2024, most recently extended by Local Law 2026-01)
2024 Johnstown Town Battery storage (BESS), Wind Town of Johnstown local law (BESS/wind moratorium)
2024 Livingston Town Battery storage (BESS) Local Law No. 4 of 2024, extending a moratorium on Battery Energy Storage Systems in the Town of Livingston
2024 Perth Town Battery storage (BESS), Solar, Wind Local Law No. 23 of 2024 (original, commercial solar); extended by Local Law #3 of 2025 (Resolution #66, introduced 2025-05-08); further extended/broadened...
2024 Prattsburgh Town Battery storage (BESS), Solar Town of Prattsburgh proposed local law establishing a six-month moratorium on Industrial Solar Energy Facilities and Battery Energy Storage Facilities...
2024 Rotterdam Town Battery storage (BESS) Introductory Local Law No. 8 of 2025
2024 Somerset Town Battery storage (BESS) Town of Somerset local law (BESS moratorium)
2024 Westfield Town Battery storage (BESS) Local Law No. 1 of 2026 (extending Local Law No. 1 of 2024)
2023-10 Village of Port Chester Battery storage (BESS) Chapter 345 of the Code of the Village of Port Chester (temporary development moratorium on BESS)
2023-09-21 Lysander Town Battery storage (BESS) Town Code Chapter 102 (Battery Energy Storage Systems), Tier 2 BESS moratorium footnote; original L.L. No. 8-2023 (2023-09-21); extended by L.L. No. 3-2024...
2023-08-22 Southampton Town Battery storage (BESS) Former Chapter 314, Moratorium on Battery Energy Storage Systems (adopted by L.L. No. 28-2023), amended by L.L. 1-2024, L.L. 15-2024, L.L. 10-2025
2023-01-31 Southold Town Battery storage (BESS) Town of Southold moratorium on Battery Energy Storage System (BESS) facilities
2023 Long Lake Town Battery storage (BESS) Town of Long Lake Battery Energy Storage System Law, as amended by Local Law 3 of 2023; superseded by revised BESS law (Proposed Local Law No. 1 of 2024)
2023 Oswegatchie Town Battery storage (BESS) Local Law #2 of 2023, a moratorium on battery energy storage systems in the Town of Oswegatchie; extended by Resolution 155-2024 (six months)
2023 Chautauqua Town Battery storage (BESS), Solar, Wind Local Law No. 4 of 2026 (extending the moratorium on Battery Energy Storage Systems; companion Local Laws 3 and 5 of 2026 extend wind and commercial solar moratoria)
2023 Warwick Town Battery storage (BESS) Local Law No. 4 of 2023, as extended by Local Law No. 10 of 2024 and amended by Local Law No. 3 of 2025; superseded by Local Law #5 of 2026 (permanent BESS...
— Allen Town Battery storage (BESS)
Not yet enacted as of 2026-09-23. Buffalo Common Council members were reported September 22, 2026 to be moving a proposed two-year moratorium on new data centers and cryptocurrency facilities toward a full Council vote 'set for next Tuesday' (on or about 2026-09-29). City of Buffalo Data centers, Crypto mining Proposed local law/ordinance for a two-year moratorium on new data centers and cryptocurrency facilities, City of Buffalo, sponsored/championed by...
— Campbell Town Battery storage (BESS)
— Carlton Town Battery storage (BESS) Town of Carlton local law extending a moratorium on large battery energy storage systems (Local Law No. 6 of 2025)
— Carrollton Town Battery storage (BESS)
— Collins Town Battery storage (BESS)
— Corning Town Battery storage (BESS)
— Elba Town Battery storage (BESS), Solar Proposed Local Law No. 1 of 2026 (extending a 12-month moratorium on Tier 3 solar, large battery storage, and other renewable energy facilities)
Not yet enacted as of 2026-09-23. On 2026-05-13 the Town Board adopted a resolution directing the Planning Board to draft data center legislation. A draft moratorium local law (modeled on Newfield's) was rewritten twice between July and mid-August 2026 on the advice of Town legal counsel Guy Krogh. At its August 12, 2026 meeting the Town Board did NOT set a public hearing as previously expected; it instead held off action, pushing back the hearing and the law's adoption to October 2026 at the earliest. Enfield Town Data centers May 13, 2026 Town Board resolution directing the Planning Board to draft data center legislation; a subsequent draft local law (closely modeled on...
— Essex County Battery storage (BESS)
— Frankfort Town Battery storage (BESS), Solar, Wind Proposed Local Law No. 2, 2026 (six-month moratorium on solar, wind, and battery storage)
— Freedom Town Battery storage (BESS)
— Gainesville Town Battery storage (BESS)
— Greenwood Town Battery storage (BESS)
— Halfmoon Town Battery storage (BESS)
— Harrison Town Battery storage (BESS) Harrison Town Code (former) 235-95, Moratorium of battery energy storage systems
— Le Ray Town Battery storage (BESS) Town of Le Ray local law ("LL - Moratorium EnergyBattery")
Not yet enacted as of 2026-09-23. At its meeting of 2026-09-15 (following an August 18, 2026 initial discussion), the Town Board voted unanimously (motion by Councilman Michael Robbins, seconded by Supervisor Peter Goodman) to direct Town Attorney Benjamin Gailey to prepare a proposed local law establishing a data center moratorium; that draft law will require its own future public hearing before formal adoption, expected 'within the next couple of meetings' as of September 15. Mamakating Town Data centers No local law has been drafted or adopted yet; on 2026-09-15 the Town Board passed a resolution directing the Town Attorney to prepare a proposed local law...
— Potsdam Town Data centers
— Ripley Town Battery storage (BESS)
— Virgil Town Battery storage (BESS)
— Yorktown Town Battery storage (BESS) Town of Yorktown local law (BESS moratorium); Town Board separately adopted a permanent ban on new Tier 2 BESS on 2025-05-29