| 2026-08-25 |
Orangetown Town |
Battery storage (BESS), Data centers |
Town of Orangetown Local Law No. 5 of 2026, adding Article XX to Chapter 43 (Zoning) |
| 2026-08-13 |
Le Ray Town |
Data centers |
Town of LeRay local law establishing a moratorium on data centers |
| 2026-08-13 |
Mohawk Town |
Data centers |
Town of Mohawk local law imposing a six-month moratorium on data center permitting |
| 2026-08-11 |
Islip Town |
Data centers |
Town of Islip Town Code Chapter 68-761, an 18-month moratorium on data center development |
| 2026-08-03 |
Tonawanda Town |
Data centers |
Local law imposing a one-year moratorium on data centers of 20 MW or more, Town of Tonawanda, Erie County; signed/filed text not located. |
| 2026-07-22 |
Tyre Town |
Data centers |
Town of Tyre Local Law No. 2 of 2026, "A Local Law Establishing a Moratorium on Data Centers and Artificial Intelligence Computing Facilities within the... |
| 2026-07-16 |
Brookhaven Town |
Data centers |
Chapter 17 ('Moratorium'), Article I ('Data Centers') of the Town Code of the Town of Brookhaven, added by a local law unanimously adopted 6-0 (Councilwoman... |
| 2026-07-15 |
East Greenbush Town |
Data centers |
Local Law No. 3 of 2026 (Town of East Greenbush), 'A Local Law Imposing a Moratorium on Applications for Permits, Site Plans or Other Land Use Approvals for... |
| 2026-07-09 |
Manlius Town |
Data centers, Crypto mining |
Manlius Town Board local law/resolution (unanimous, 7-0) |
| 2026-07-09 |
Newfield Town |
Data centers, Crypto mining |
Local Law Imposing a Temporary Town-Wide One Year Moratorium on Data Processing Centers, Town of Newfield, Tompkins County; the town's public Town Laws &... |
| 2026-07-08 |
Canton Town |
Data centers |
Town of Canton local law establishing a moratorium on data center development |
| 2026-07-07 |
Clifton Park Town |
Data centers |
Local Law No. 9 of 2026 |
| 2026-06-29 |
Clay Town |
Data centers, Crypto mining |
Local Law No. 6 of 2026 (Town of Clay, Onondaga County), 'A Local Law providing for a Temporary Moratorium for Twelve (12) Months prohibiting any zone... |
| 2026-06-25 |
East Fishkill Town |
Data centers |
Local Law No. 3 of 2026 (Town of East Fishkill), titled 'A Local Law to Extend, Consolidate and Impose a Moratorium on Certain Properties Within the Town of... |
| 2026-06-24 |
Bethlehem Town |
Data centers |
Local law establishing a temporary 12-month moratorium on development or construction of data centers, Town of Bethlehem, Albany County; signed/filed text... |
| 2026-06-15 |
Arietta Town |
Battery storage (BESS) |
Local Law No. 01 of 2026, Establishing a Moratorium on Battery Energy Storage Systems (Resolution 26-06-30) |
| 2026-06-09 |
Highland Town |
Data centers |
Local Law No. 1 of 2026, 'Data Center Moratorium,' Town of Highland, Sullivan County; unanimously adopted by the Town Board on 2026-06-09 following a public... |
| 2026-06-04 |
Perth Town |
Data centers |
Local law imposing a one-year moratorium on data center development, Town of Perth, Fulton County; full signed text not located behind the Leader Herald paywall. |
| 2026-06-03 |
Van Buren Town |
Data centers, Crypto mining |
Local Law 2-2026 |
| 2026-06 |
Ellery Town |
Solar, Wind, Battery storage (BESS) |
Town of Ellery moratoriums on commercial solar, wind, and battery energy storage systems |
| 2026-06 |
Huntington Town |
Battery storage (BESS) |
Local Law No. 17-2026 (referred to Suffolk County Planning Commission as file HU-26-04) |
| 2026-06 |
Stockport Town |
Battery storage (BESS) |
Local Law 1-2026, Moratorium on Battery Storage Systems, Town of Stockport |
| 2026-06 |
Wilton Town |
Battery storage (BESS) |
Local Law (Town of Wilton BESS Moratorium Law, CZRC-approved draft posted 2026-05-07) |
| 2026-05-27 |
Salina Town |
Data centers, Crypto mining |
Local Law No. 5 of 2026 |
| 2026-05-21 |
Southeast Town |
Data centers |
Local Law No. 3 of 2026 |
| 2026-05-20 |
Thurston Town |
Data centers, Crypto mining |
Resolution 20 and Local Law No. 5 of 2026 |
| 2026-05-15 |
Oneonta Town |
Data centers, Crypto mining |
Proposed local law: "Moratorium on the Development, Construction, and Operation of Data Centers and Commercial Cryptocurrency Mining Operations" |
| 2026-05-14 |
Spafford Town |
Battery storage (BESS) |
Local Law No. 1-2026 (Resolution 46-2026), a town-wide 12-month moratorium on the siting, placement, installation, construction, modification or enlargement... |
| 2026-05-07 |
Lysander Town |
Data centers |
Local Law No. 4 of 2026, 'A Local Law Establishing a Temporary Six Month Moratorium on Development or Construction of Data Storage Facilities Within the... |
| 2026-05-06 |
Marcellus Town |
Battery storage (BESS) |
Local Law No. A of 2026, A Local Law Imposing a Twelve (12) Month Moratorium on Battery Energy Storage Systems within the Town of Marcellus |
| 2026-05 |
Benson Town |
Battery storage (BESS) |
Local Law No. 1 of 2026, Establishing a Moratorium on Battery Energy Storage Systems |
| 2026-05 |
Ticonderoga Town |
Battery storage (BESS) |
Town of Ticonderoga Local Law No. __ of 2026, a moratorium on locating battery energy storage systems (Tier 2/Tier 3 BESS) |
| 2026-04-13 |
Lewiston Town |
Data centers, Crypto mining |
Local Law No. 3 of 2026, 'A Local Law Imposing a Moratorium on the Establishment, Construction, Expansion, or Operation of Data Centers, Artificial... |
| 2026-04-09 |
Byron Town |
Battery storage (BESS) |
Town of Byron local law imposing a temporary moratorium on battery energy storage system facilities (cited as Local Law #3 of 2026 in the 2026-09-09... |
| 2026-04-09 |
Byron Town |
Solar |
Town of Byron local law imposing a temporary moratorium on renewable energy projects (cited as Local Law #2 of 2026 in the 2026-09-09 extension hearing... |
| 2026-03-20 |
Hartwick Town |
Solar |
Town of Hartwick local law imposing a six-month moratorium on solar energy systems |
| 2026-03-16 |
Lewis Town |
Solar, Battery storage (BESS), Wind |
Town of Lewis local law imposing a moratorium on the acceptance or approval of applications for permits authorizing solar energy systems, battery energy... |
| 2026-03-10 |
Camillus Town |
Battery storage (BESS) |
Town of Camillus Local Law No. A-2026, a twelve-month moratorium on all battery energy storage systems (Tier 1 and Tier 2) |
| 2026-03-02 |
Cairo Town |
Battery storage (BESS) |
Local Law #2 of 2026, 'A Local Law Imposing a Temporary Town-Wide Six-Month Moratorium on Battery Energy Storage Systems,' adopted by the Cairo Town Board... |
| 2026-03 |
Athens Town |
Battery storage (BESS) |
Town of Athens moratorium on battery energy storage system facilities |
| 2026-03 |
Northampton Town |
Battery storage (BESS) |
Local Law No. 01 of 2026, the Town of Northampton Battery Energy Storage Moratorium |
| 2026-02-10 |
Schroeppel Town |
Solar |
Local Law 1 of 2026, imposing a one-year moratorium on commercial free-standing solar systems within the Town of Schroeppel |
| 2026-02-03 |
Denmark Town |
Solar, Battery storage (BESS) |
Town of Denmark Local Law No. 1 of 2026, establishing a twelve-month moratorium on commercial solar energy systems, battery energy storage systems (BESS),... |
| 2026-02 |
Newfane Town |
Battery storage (BESS) |
2026 Temporary Moratorium Law on Battery Energy Storage System (BESS) Facilities, Local Law No. 1-2026 of the Town of Newfane |
| 2026-02 |
City of Syracuse |
Battery storage (BESS) |
Syracuse Common Council ordinance (BESS moratorium) |
| 2026-01-14 |
Sherburne Town |
Battery storage (BESS) |
Town Board resolution adopting a 6-month moratorium on the construction of battery storage facilities (Town of Sherburne, no zoning code; local law number... |
| 2026-01 |
Greig Town |
Solar, Wind, Battery storage (BESS) |
Town of Greig Local Law 2026-01, a moratorium on commercial renewable energy systems (solar, wind energy primary systems, battery energy storage systems,... |
| 2025-12-02 |
City of Amsterdam |
Battery storage (BESS), Solar |
City of Amsterdam moratorium on industrial solar and battery energy storage systems |
| 2025-10-08 |
Salem Town |
Battery storage (BESS) |
Local Law #1 of 2025 |
| 2025-09-30 |
Hurley Town |
Battery storage (BESS) |
2025 Battery Energy Storage System Facilities Moratorium Law of the Town of Hurley (proposed local law dated Sept. 30, 2025); extended by Town Board... |
| 2025-09 |
Dunkirk Town |
Battery storage (BESS) |
Town of Dunkirk moratorium on battery energy storage systems |
| 2025-08-11 |
City of Oswego |
Battery storage (BESS), Solar, Wind |
City of Oswego Local Law No. 1 of 2025, A Local Law Establishing a Moratorium on Certain Renewable Energy Systems |
| 2025-07-21 |
Clifton Park Town |
Battery storage (BESS) |
Local Law No. 5 of 2025, A Local Law Establishing and Extending a Moratorium on Battery Energy Storage Systems Facilities in the Town of Clifton Park |
| 2025-06-18 |
Glenville Town |
Battery storage (BESS) |
Town of Glenville local law (BESS moratorium) |
| 2025-06 |
Mentz Town |
Battery storage (BESS) |
A Local Law Establishing a Temporary Land Use Moratorium Prohibiting Battery Energy Storage Systems Within the Town of Mentz |
| 2025-06 |
Norfolk Town |
Battery storage (BESS) |
Local Law No. 5 of 2025, a Moratorium on all Energy Storage System Development in the Town of Norfolk |
| 2025-06 |
Pendleton Town |
Battery storage (BESS) |
Local Law No. 2 of 2025 |
| 2025-06 |
Watson Town |
Battery storage (BESS) |
Local Law No. 2 for the Year 2025, A Local Law Enacting a Temporary Moratorium on Utility-Scale Energy Storage Systems (covering both Compressed Air Energy... |
| 2025-06 |
Village of Mayville |
Battery storage (BESS) |
Village of Mayville local law (BESS moratorium) |
| 2025-05-27 |
Aurora Town |
Battery storage (BESS) |
Town of Aurora Local Law 5-2025, a six-month moratorium on new applications for battery energy storage systems |
| 2025-05-13 |
City of Glen Cove |
Battery storage (BESS) |
City of Glen Cove moratorium on battery energy storage systems |
| 2025-05-06 |
Berne Town |
Solar, Battery storage (BESS) |
Town of Berne moratorium on commercial solar facilities (extended to add battery energy storage systems on 2026-03-11) |
| 2025-05-02 |
Mina Town |
Battery storage (BESS) |
Town of Mina 2026 Temporary Moratorium Law on Battery Energy Storage System Facilities, Local Law No. 6 of 2026, replacing Local Law #1-2025 (effective... |
| 2025-03-24 |
City of Peekskill |
Battery storage (BESS) |
Local Law No. 3 of 2025 (original, adopted following the 2025-03-24 hearing; filed 2025-05-05, expired 2025-11-05); further extended by Local Law No. 14 of... |
| 2025-03-11 |
City of Gloversville |
Battery storage (BESS), Solar |
City of Gloversville local law establishing a moratorium on industrial solar and battery energy storage systems, later superseded by a permanent ban |
| 2025-03 |
Hempstead Town |
Battery storage (BESS) |
Town Code Chapter 101B; most recent extension Local Law No. 75-2026 (Resolution No. 801-2026), adopted 2026-09-09 |
| 2025-02-11 |
New Castle Town |
Battery storage (BESS) |
Local Law No. 1 of 2025, a Six-Month Moratorium Prohibiting the Review and Approval of Applications and Permits for Battery Energy Storage Systems |
| 2025-02-11 |
Southport Town |
Battery storage (BESS), Solar |
Local Law No. 1 of 2025, A Six-Month Moratorium on Commercial Solar Energy Systems and Commercial Energy Storage Systems within the Town of Southport... |
| 2025-02 |
Albion Town |
Battery storage (BESS), Solar |
Town of Albion local law (solar/BESS moratorium, 2025); later superseded by amendment to Chapter 106 (BESS) of the Town Code |
| 2025 |
Chester Town |
Battery storage (BESS) |
Town of Chester local law prohibiting large-scale battery energy storage system installations (Local Law 10 of 2025, extended by Local Law 3 of 2026) |
| 2025 |
Eden Town |
Battery storage (BESS) |
Town of Eden local law prohibiting review and approval of Battery Energy Storage System applications (originally a six-month moratorium, extended twelve... |
| 2025 |
Gardiner Town |
Battery storage (BESS) |
Town of Gardiner moratorium on battery energy storage systems |
| 2025 |
German Flatts Town |
Solar, Wind |
Town of German Flatts local law (12-month solar & wind moratorium), reviewed by Herkimer County Planning Board 2025-05-19 |
| 2025 |
Montgomery Town |
Battery storage (BESS) |
Town of Montgomery Local Law No. 2 of 2025 (removing battery storage systems from the zoning code), following Introductory Local Law No. 1 of 2025 |
| 2025 |
North Harmony Town |
Battery storage (BESS), Solar |
Temporary Moratorium on Commercial Solar and Battery Energy Storage Systems in the Town of North Harmony; extended by Local Law 3 of 2025 (Resolution #12 of 2025) |
| 2025 |
Pound Ridge Town |
Battery storage (BESS) |
Town of Pound Ridge BESS moratorium local law, replaced 2026-07-21 by permanent zoning amendment prohibiting large-scale BESS |
| 2025 |
Rose Town |
Battery storage (BESS), Solar |
Town of Rose proposed moratorium on the construction of large-scale solar farms and battery storage units (referred to Wayne County Planning Board as a GML... |
| 2025 |
Day Town |
Battery storage (BESS) |
Local Law No. 01 of 2025, A Local Law Imposing a Moratorium on Locating Battery Energy Storage Systems in the Town of Day |
| 2025 |
Turin Town |
Battery storage (BESS) |
Village of Turin Local Law No. 01 of 2025 (original one-year moratorium on solar energy collectors/generators and battery storage facilities); extended 6... |
| 2024-12-03 |
North Hempstead Town |
Battery storage (BESS) |
Town Code Chapter 76 (Temporary Moratorium on Battery Energy Storage System Facilities); established by L.L. No. 11-2024 (2024-12-03), extended by L.L. No.... |
| 2024-12 |
Milton Town |
Battery storage (BESS), Solar |
A Local Law Entitled "Establishing a Temporary Moratorium on Large/Commercial Scale Solar Energy Installations and Battery Storage Facilities in the Town of Milton" |
| 2024-11-14 |
Stanford Town |
Battery storage (BESS), Wind |
Local Law #2 of 2024, A Local Law Imposing a Temporary Moratorium on Battery Energy Storage Systems and Wind Energy Conversion Systems (Resolution No. 11B of 2024) |
| 2024-10-31 |
Angelica Town |
Battery storage (BESS), Solar, Wind |
Town of Angelica local law imposing a moratorium on solar energy systems, energy storage systems, and wind generation systems |
| 2024-10-31 |
Village of Mamaroneck |
Battery storage (BESS) |
Code of the Village of Mamaroneck 342-84.5, as extended by Local Law 11-2025 and Local Law 14-2025 |
| 2024-10-14 |
Victory Town |
Battery storage (BESS) |
Local Law #2 of 2024, as extended by a June 2025 local law |
| 2024-10 |
Cameron Town |
Battery storage (BESS), Solar |
Local Law No. 4 of 2024 |
| 2024-09-20 |
Smithtown Town |
Battery storage (BESS) |
Town Code Chapter 324, Moratorium on Battery Energy Storage Systems; originally L.L. No. 13-2024 (2024-09-20), extended by L.L. No. 1-2025, L.L. No. 6-2025,... |
| 2024-09-19 |
Village of Wilson |
Battery storage (BESS) |
Local Law #5 (new Chapter 178, Battery Moratorium) |
| 2024-09-11 |
West Bloomfield Town |
Battery storage (BESS), Solar |
Local Law No. 1 of 2026 (extending Local Law No. 4 of 2024 as extended by Local Law No. 3 of 2025) |
| 2024-08-13 |
Bedford Town |
Battery storage (BESS) |
Town of Bedford local law prohibiting review and approval of applications for battery energy storage systems (Local Law No. 1-2025 extending the original... |
| 2024-08 |
Village of Mount Kisco |
Battery storage (BESS) |
Village/Town of Mount Kisco Proposed Local Law No. 01-2025 (amending Chapter 110 zoning, superseding the moratorium) |
| 2024-07-31 |
Dryden Town |
Data centers, Crypto mining |
Local Law No. 2 of 2024; draft Local Law No. 1 of 2026 extension; Local Law No. 2 of 2026 replacement zoning definitions |
| 2024-07-26 |
Putnam Valley Town |
Battery storage (BESS), Solar, Wind |
Local Law #3 of 2024, Temporary Land Use Moratorium Prohibiting Large Scale Solar Installations, Large Scale Battery Energy Storage System Installations,... |
| 2024-07-22 |
Concord Town |
Battery storage (BESS) |
Town of Concord battery energy storage system moratorium (Local Law No. 3-2024, extended by Local Law No. 2-2025 and a June 2026 six-month extension) |
| 2024-07-16 |
City of North Tonawanda |
Data centers, Crypto mining |
Local Law 2024-2 (original 2-year moratorium on cryptocurrency mining and data processing centers), extended by a 2026 local law ('Local Law 2026 -... |
| 2024-07-16 |
City of Yonkers |
Battery storage (BESS) |
General Ordinance 08-2024, as extended by General Ordinance 01-2025 and General Ordinance 07-2025 (GO.7-2025) |
| 2024-07-09 |
Kent Town |
Battery storage (BESS) |
Local Law Establishing a Land Use Moratorium Prohibiting Lithium Storage Facilities (Introductory Local Law #1), adopted 2024-07-09; extended by a further... |
| 2024-07-08 |
Newstead Town |
Battery storage (BESS), Solar |
Town of Newstead local law (Local Law 2 - BESS moratorium; Local Law 3 - wind moratorium) |
| 2024-06-05 |
Babylon Town |
Battery storage (BESS) |
Town of Babylon 2026 Moratorium Law on Battery Energy Storage System Facilities (Local Law No. 2 of 2026, extending Local Law 11 of 2024) |
| 2024-05-14 |
Leyden Town |
Battery storage (BESS), Solar |
Town of Leyden Local Law #1 of 2024, 'Establishing a Townwide Twelve (12) Month Moratorium for all Large Solar Energy Systems and/or Medium/Large Battery... |
| 2024-04 |
Oyster Bay Town |
Battery storage (BESS) |
Town of Oyster Bay moratorium on battery energy storage systems |
| 2024-03-19 |
Islip Town |
Battery storage (BESS) |
Town of Islip Town Code § 68-457, moratorium on Battery Energy Storage System permits |
| 2024-03 |
Royalton Town |
Battery storage (BESS) |
Town of Royalton local law (BESS/renewable energy moratorium) |
| 2024-03 |
Walworth Town |
Battery storage (BESS), Solar |
Local Law No. 1-2024 (To Implement a Temporary Moratorium Relative to Solar Facilities and Battery Storage) |
| 2024-02 |
Poughkeepsie Town |
Battery storage (BESS) |
Town of Poughkeepsie local law (temporary town-wide moratorium on large-scale BESS) |
| 2024 |
Boston Town |
Battery storage (BESS) |
Town of Boston Local Law No. 2-2024, a six-month moratorium prohibiting review and approval of battery energy storage system applications |
| 2024 |
Brasher Town |
Battery storage (BESS) |
Town of Brasher moratorium on battery energy storage systems |
| 2024 |
Busti Town |
Battery storage (BESS) |
Local Law 3 of 2026 (extending prior commercial BESS moratorium) |
| 2024 |
Carmel Town |
Battery storage (BESS), Solar |
Town of Carmel Local Law #5 of 2024 (moratorium), superseded by a permanent zoning law banning Tier 2 battery energy storage systems (>600 kWh) |
| 2024 |
Claverack Town |
Battery storage (BESS) |
Town of Claverack Local Law No. 2 of 2024, a moratorium on Battery Energy Storage Systems |
| 2024 |
Clymer Town |
Battery storage (BESS) |
Town of Clymer battery storage moratorium (all-BESS scope) |
| 2024 |
Concord Town |
Solar |
Town of Concord solar energy moratorium (a separate local law from the BESS moratorium, extended in parallel) |
| 2024 |
Cortlandt Town |
Battery storage (BESS) |
Town of Cortlandt moratorium for new Battery Energy Storage Systems (originally Local Law 2-2024, most recently extended by Local Law 2026-01) |
| 2024 |
Johnstown Town |
Battery storage (BESS), Wind |
Town of Johnstown local law (BESS/wind moratorium) |
| 2024 |
Livingston Town |
Battery storage (BESS) |
Local Law No. 4 of 2024, extending a moratorium on Battery Energy Storage Systems in the Town of Livingston |
| 2024 |
Perth Town |
Battery storage (BESS), Solar, Wind |
Local Law No. 23 of 2024 (original, commercial solar); extended by Local Law #3 of 2025 (Resolution #66, introduced 2025-05-08); further extended/broadened... |
| 2024 |
Prattsburgh Town |
Battery storage (BESS), Solar |
Town of Prattsburgh proposed local law establishing a six-month moratorium on Industrial Solar Energy Facilities and Battery Energy Storage Facilities... |
| 2024 |
Rotterdam Town |
Battery storage (BESS) |
Introductory Local Law No. 8 of 2025 |
| 2024 |
Somerset Town |
Battery storage (BESS) |
Town of Somerset local law (BESS moratorium) |
| 2024 |
Westfield Town |
Battery storage (BESS) |
Local Law No. 1 of 2026 (extending Local Law No. 1 of 2024) |
| 2023-10 |
Village of Port Chester |
Battery storage (BESS) |
Chapter 345 of the Code of the Village of Port Chester (temporary development moratorium on BESS) |
| 2023-09-21 |
Lysander Town |
Battery storage (BESS) |
Town Code Chapter 102 (Battery Energy Storage Systems), Tier 2 BESS moratorium footnote; original L.L. No. 8-2023 (2023-09-21); extended by L.L. No. 3-2024... |
| 2023-08-22 |
Southampton Town |
Battery storage (BESS) |
Former Chapter 314, Moratorium on Battery Energy Storage Systems (adopted by L.L. No. 28-2023), amended by L.L. 1-2024, L.L. 15-2024, L.L. 10-2025 |
| 2023-01-31 |
Southold Town |
Battery storage (BESS) |
Town of Southold moratorium on Battery Energy Storage System (BESS) facilities |
| 2023 |
Long Lake Town |
Battery storage (BESS) |
Town of Long Lake Battery Energy Storage System Law, as amended by Local Law 3 of 2023; superseded by revised BESS law (Proposed Local Law No. 1 of 2024) |
| 2023 |
Oswegatchie Town |
Battery storage (BESS) |
Local Law #2 of 2023, a moratorium on battery energy storage systems in the Town of Oswegatchie; extended by Resolution 155-2024 (six months) |
| 2023 |
Chautauqua Town |
Battery storage (BESS), Solar, Wind |
Local Law No. 4 of 2026 (extending the moratorium on Battery Energy Storage Systems; companion Local Laws 3 and 5 of 2026 extend wind and commercial solar moratoria) |
| 2023 |
Warwick Town |
Battery storage (BESS) |
Local Law No. 4 of 2023, as extended by Local Law No. 10 of 2024 and amended by Local Law No. 3 of 2025; superseded by Local Law #5 of 2026 (permanent BESS... |
| — |
Allen Town |
Battery storage (BESS) |
|
| Not yet enacted as of 2026-09-23. Buffalo Common Council members were reported September 22, 2026 to be moving a proposed two-year moratorium on new data centers and cryptocurrency facilities toward a full Council vote 'set for next Tuesday' (on or about 2026-09-29). |
City of Buffalo |
Data centers, Crypto mining |
Proposed local law/ordinance for a two-year moratorium on new data centers and cryptocurrency facilities, City of Buffalo, sponsored/championed by... |
| — |
Campbell Town |
Battery storage (BESS) |
|
| — |
Carlton Town |
Battery storage (BESS) |
Town of Carlton local law extending a moratorium on large battery energy storage systems (Local Law No. 6 of 2025) |
| — |
Carrollton Town |
Battery storage (BESS) |
|
| — |
Collins Town |
Battery storage (BESS) |
|
| — |
Corning Town |
Battery storage (BESS) |
|
| — |
Elba Town |
Battery storage (BESS), Solar |
Proposed Local Law No. 1 of 2026 (extending a 12-month moratorium on Tier 3 solar, large battery storage, and other renewable energy facilities) |
| Not yet enacted as of 2026-09-23. On 2026-05-13 the Town Board adopted a resolution directing the Planning Board to draft data center legislation. A draft moratorium local law (modeled on Newfield's) was rewritten twice between July and mid-August 2026 on the advice of Town legal counsel Guy Krogh. At its August 12, 2026 meeting the Town Board did NOT set a public hearing as previously expected; it instead held off action, pushing back the hearing and the law's adoption to October 2026 at the earliest. |
Enfield Town |
Data centers |
May 13, 2026 Town Board resolution directing the Planning Board to draft data center legislation; a subsequent draft local law (closely modeled on... |
| — |
Essex County |
Battery storage (BESS) |
|
| — |
Frankfort Town |
Battery storage (BESS), Solar, Wind |
Proposed Local Law No. 2, 2026 (six-month moratorium on solar, wind, and battery storage) |
| — |
Freedom Town |
Battery storage (BESS) |
|
| — |
Gainesville Town |
Battery storage (BESS) |
|
| — |
Greenwood Town |
Battery storage (BESS) |
|
| — |
Halfmoon Town |
Battery storage (BESS) |
|
| — |
Harrison Town |
Battery storage (BESS) |
Harrison Town Code (former) 235-95, Moratorium of battery energy storage systems |
| — |
Le Ray Town |
Battery storage (BESS) |
Town of Le Ray local law ("LL - Moratorium EnergyBattery") |
| Not yet enacted as of 2026-09-23. At its meeting of 2026-09-15 (following an August 18, 2026 initial discussion), the Town Board voted unanimously (motion by Councilman Michael Robbins, seconded by Supervisor Peter Goodman) to direct Town Attorney Benjamin Gailey to prepare a proposed local law establishing a data center moratorium; that draft law will require its own future public hearing before formal adoption, expected 'within the next couple of meetings' as of September 15. |
Mamakating Town |
Data centers |
No local law has been drafted or adopted yet; on 2026-09-15 the Town Board passed a resolution directing the Town Attorney to prepare a proposed local law... |
| — |
Potsdam Town |
Data centers |
|
| — |
Ripley Town |
Battery storage (BESS) |
|
| — |
Virgil Town |
Battery storage (BESS) |
|
| — |
Yorktown Town |
Battery storage (BESS) |
Town of Yorktown local law (BESS moratorium); Town Board separately adopted a permanent ban on new Tier 2 BESS on 2025-05-29 |