Battery storage moratoria by town, township, city and county

Every local moratorium on battery energy storage systems (BESS) we know of in Ohio, Michigan, New York, North Carolina, Georgia, Indiana and Virginia: 172 records, 110 in force or recently adopted, 22 pending or proposed, plus 6 upcoming hearings and votes on battery storage moratoria and siting rules.

Data last changed (02:41 UTC) · page regenerated daily, last on

110
in force or recently adopted
22
pending or proposed
6
upcoming hearings and votes (120 days)
163
governments with a record

By state

StateIn force or adoptedPending or proposedEndedAll recordsUpcoming items
Ohio20020
Michigan20113332
New York8111341264
North Carolina10010
Georgia30030
Indiana31370
Virginia00000

“Pending or proposed” also counts upcoming zoning amendments and siting ordinances for battery energy storage systems (BESS). Coverage differs by state; see coverage by state.

By month

Battery storage moratoria enacted or adopted in OH, MI, NY, NC, GA, IN and VA Last 24 months; pending and proposed items are not counted.
  • Moratorium Nation (enacted)
  • Siting Radar detections not in that inventory (adopted)
05101520Oct 2024: 4 (Moratorium Nation 4, Siting Radar 0)Oct ’24Nov 2024: 1 (Moratorium Nation 1, Siting Radar 0)Dec 2024: 2 (Moratorium Nation 2, Siting Radar 0)Jan 2025: 0 (Moratorium Nation 0, Siting Radar 0)Jan ’25Feb 2025: 4 (Moratorium Nation 4, Siting Radar 0)Mar 2025: 3 (Moratorium Nation 3, Siting Radar 0)Apr 2025: 0 (Moratorium Nation 0, Siting Radar 0)Apr ’25May 2025: 4 (Moratorium Nation 4, Siting Radar 0)Jun 2025: 6 (Moratorium Nation 6, Siting Radar 0)Jul 2025: 1 (Moratorium Nation 1, Siting Radar 0)Jul ’25Aug 2025: 1 (Moratorium Nation 1, Siting Radar 0)Sep 2025: 2 (Moratorium Nation 2, Siting Radar 0)Oct 2025: 1 (Moratorium Nation 1, Siting Radar 0)Oct ’25Nov 2025: 2 (Moratorium Nation 1, Siting Radar 1)Dec 2025: 1 (Moratorium Nation 1, Siting Radar 0)Jan 2026: 3 (Moratorium Nation 3, Siting Radar 0)Jan ’26Feb 2026: 9 (Moratorium Nation 7, Siting Radar 2)Mar 2026: 6 (Moratorium Nation 6, Siting Radar 0)Apr 2026: 4 (Moratorium Nation 4, Siting Radar 0)Apr ’26May 2026: 7 (Moratorium Nation 6, Siting Radar 1)Jun 2026: 9 (Moratorium Nation 7, Siting Radar 2)Jul 2026: 3 (Moratorium Nation 2, Siting Radar 1)Jul ’26Aug 2026: 8 (Moratorium Nation 5, Siting Radar 3)Sep 2026: 1 (Moratorium Nation 1, Siting Radar 0)Sep ’26
Show as a table
MonthMoratorium NationSiting RadarTotal
Sep 2026101
Aug 2026538
Jul 2026213
Jun 2026729
May 2026617
Apr 2026404
Mar 2026606
Feb 2026729
Jan 2026303
Dec 2025101
Nov 2025112
Oct 2025101
Sep 2025202
Aug 2025101
Jul 2025101
Jun 2025606
May 2025404
Apr 2025000
Mar 2025303
Feb 2025404
Jan 2025000
Dec 2024202
Nov 2024101
Oct 2024404

Upcoming votes and hearings

  1. On the agenda (before the vote) Moratorium Battery storage (BESS)Solar

    Southport Town, NY

    Planning Board · (upcoming) · Chemung County
    “…The Town Board of Southport referral of proposed Local Law No. 3 of 2026, for a six-month extension of the moratorium on commercial solar energy systems and commercial energy storage systems within the Town of Southport”
  2. Hearing notice Zoning amendment Battery storage (BESS)Data centers

    Washington Charter Township, MI

    Planning Commission · (upcoming) · Macomb County
    “s Motion by:____________ supported by:_________________ to schedule a Public Hearing for the October 8th, 2026 Planning Commission Meeting to consider proposed text amendments to the Charter Township of Washington…”
    Source document, p. 18 (opens in a new tab) Packet for Sep 10, 2026 +1 related mention
  3. Hearing notice Moratorium Battery storage (BESS)Solar

    Virgil Town, NY

    Governing body not stated · (upcoming) · Cortland County
    “The Public hearing will be on a proposed Local Law adopting a moratorium on certain energy storage uses and solar projects in the Town of Virgil.”
  4. Hearing notice Moratorium Battery storage (BESS)Solar

    Southport Town, NY

    Town Board · (upcoming) · Chemung County
    “…of its planning in preparaƟon for this potenƟal development enacted a moratorium to prohibit the development of Commercial Solar Energy Systems and Commercial Energy Storage Systems in the Town of Southport with Local…”
  5. Hearing notice Moratorium Battery storage (BESS)Data centers

    Fredonia Township, MI

    Planning Commission · (upcoming) · Calhoun County

    Hearing notice: battery storage/data center moratorium, Planning Commission; meeting Oct 14, 2026. The notice text is not reproduced here; open the original notice to read it.

  6. Hearing notice Moratorium Battery storage (BESS)Solar

    Berne Town, NY

    Governing body not stated · (upcoming) · Albany County
    “ENERGY STORAGE SYSTEMS FOR AN ADDITIONAL SIX MONTHS.” PLEASE TAKE FURTHER NOTICE that a public hearing on proposed Local Law #3 “EXTENDING THE SOLAR ENERGY AND BATTERY ENERGY STORAGE SYSTEM MORATORIUM” for 2026 will be…”

All known local battery storage moratoria

DateStateGovernmentCountyUsesStatusDetails and source
MI Fredonia Township Calhoun County Battery storage (BESS), Data centers Pending
Hearing notice, Oct 14, 2026
Hearing notice for a proposed battery storage/data center moratorium — Planning Commission, Oct 14, 2026. Source document (opens in a new tab) (Siting Radar)
NY Berne Town Albany County Battery storage (BESS), Solar Pending
Hearing notice, Oct 14, 2026
Hearing notice for a proposed battery storage/solar moratorium — Oct 14, 2026. Source document (opens in a new tab) (Siting Radar)
NY Virgil Town Cortland County Battery storage (BESS), Solar Pending
Hearing notice, Oct 8, 2026
Hearing notice for a proposed battery storage/solar moratorium — Oct 8, 2026. Source document (opens in a new tab) (Siting Radar)
NY Southport Town Chemung County Battery storage (BESS), Solar Pending
On the agenda (before the vote), Oct 5, 2026
Vote scheduled on a proposed battery storage/solar moratorium — Planning Board, Oct 5, 2026. Source document (opens in a new tab) (Siting Radar)
MI City of Kalamazoo Kalamazoo County Data centers, Battery storage (BESS), Crypto mining Pending
Hearing notice, Oct 5, 2026
Hearing notice for a proposed data center moratorium — City Commission, Oct 5, 2026. Source document (opens in a new tab) (Siting Radar)
NY Frankfort Town Herkimer County Crypto mining, Data centers, Battery storage (BESS), Solar, Wind Proposed
On the agenda (before the vote), Sep 24, 2026
Vote scheduled on a proposed battery storage/crypto mining/data center/solar/wind moratorium — Sep 24, 2026. Source document (opens in a new tab) (Siting Radar)
NY City of Peekskill Westchester County Battery storage (BESS) Proposed
On the agenda (before the vote), Sep 22, 2026
Vote scheduled on a proposed battery storage moratorium — Common Council, Sep 22, 2026. Source document (opens in a new tab) (Siting Radar)
IN Fountain County — Battery storage (BESS) Proposed
Public hearing, Sep 21, 2026
Public hearing on a proposed battery storage moratorium — Council, Sep 21, 2026. Source document (opens in a new tab) (Siting Radar)
NY Conquest Town Cayuga County Battery storage (BESS) Proposed
On the agenda (before the vote), Sep 17, 2026
Planning commission recommendation on a proposed battery storage moratorium — General Municipal Law 239-l, m & n Review Committee, Sep 17, 2026. Source document (opens in a new tab) (Siting Radar)
NY Romulus Town Seneca County Battery storage (BESS), Solar Proposed
Hearing notice, Sep 16, 2026
Hearing notice for a proposed battery storage/solar moratorium — Sep 16, 2026. Source document (opens in a new tab) (Siting Radar)
NY Almond Town Allegany County Battery storage (BESS), Solar, Wind Proposed
On the agenda (before the vote), Sep 16, 2026
Planning commission recommendation on a proposed battery storage/solar/wind moratorium — Allegany County Planning Board, Sep 16, 2026. Source document (opens in a new tab) (Siting Radar)
NY Village of Delhi Delaware County Battery storage (BESS) Proposed
On the agenda (before the vote), Sep 15, 2026
Vote scheduled on a proposed battery storage moratorium — Zoning Board of Appeals, Sep 15, 2026. Source document (opens in a new tab) (Siting Radar)
NY Dunkirk Town Chautauqua County Battery storage (BESS) Proposed
Hearing notice, Sep 15, 2026
Hearing notice for a proposed battery storage moratorium — Sep 15, 2026. Source document (opens in a new tab) (Siting Radar)
MI Zeeland Charter Township Ottawa County Data centers, Solar, Wind, Battery storage (BESS), Crypto mining In force
Active
Township Board resolution 'A Resolution Enacting Temporary Moratoria on Energy Facilities and Data Centers' adopted 2026-09-01 under Section 3.36... (Moratorium Nation)
IN City of Elkhart Elkhart County Data centers, Battery storage (BESS) In force
Active
Elkhart Common Council ordinance, adopted 9-0 at a special meeting on 2026-08-27, pausing acceptance of new data center and battery energy storage... (Moratorium Nation)
NY Orangetown Town Rockland County Battery storage (BESS), Data centers In force
Active
Town of Orangetown Local Law No. 5 of 2026, adding Article XX to Chapter 43 (Zoning) (Moratorium Nation)
MI City of Kalamazoo Kalamazoo County Data centers, Battery storage (BESS), Crypto mining In force
Active; runs to Aug 16, 2027
City Commission resolution establishing a moratorium on the acceptance and/or processing of applications for Data Centers, Battery Energy Storage... (Moratorium Nation)
MI Burlington Township Calhoun County Battery storage (BESS), Data centers Adopted
Adopted, Aug 13, 2026
Battery storage/data center moratorium adopted — Township Board, Aug 13, 2026. Source document (opens in a new tab) (Siting Radar)
MI Vevay Township Ingham County Battery storage (BESS), Data centers Adopted
Adopted, Aug 12, 2026
Battery storage moratorium adopted — Township Board, Aug 12, 2026. Source document (opens in a new tab) (Siting Radar)
MI Fayette Township Hillsdale County Battery storage (BESS), Data centers, Wind Adopted
Adopted, Aug 10, 2026
Battery storage/data center/wind moratorium adopted — Township Board, Aug 10, 2026. Source document (opens in a new tab) (Siting Radar)
GA Putnam County — Data centers, Battery storage (BESS), Solar In force
Active; runs to Nov 18, 2026
Board of Commissioners moratorium on new data centers, battery energy storage facilities and solar farms (instrument number not published) (Moratorium Nation)
MI Gun Plain Township Allegan County Battery storage (BESS) In force
Active; runs to Dec 21, 2026
Gun Plain Charter Township Ordinance No. 196, temporary moratorium on future BESS applications (preceded by Resolution 2026-9) (Moratorium Nation)
MI Orleans Township Ionia County Battery storage (BESS), Data centers, Solar, Wind Adopted
Adopted, Jul 30, 2026
Battery storage/data center/solar/wind moratorium adopted — Township Board, Jul 30, 2026. Source document (opens in a new tab) (Siting Radar)
MI Kalamazoo Charter Township Kalamazoo County Battery storage (BESS) In force
Active
Charter Township of Kalamazoo Ordinance No. 646, temporary moratorium on battery energy storage facilities (Moratorium Nation)
MI Howard Township Cass County Battery storage (BESS), Data centers Proposed
Hearing notice, Jul 7, 2026
Hearing notice for a proposed battery storage/data center moratorium — Planning Commission, Jul 7, 2026. Source document (opens in a new tab) (Siting Radar)
OH Village of Lordstown Trumbull County Battery storage (BESS) In force
Active
Ordinance No. 38-2026 (emergency), temporary moratorium not to exceed 180 days on new permits and permit applications for business entities... (Moratorium Nation)
MI Marshall Township Calhoun County Battery storage (BESS), Data centers Adopted
Extended, Jun 18, 2026
Battery storage/data center moratorium extended — Township Board, Jun 18, 2026. Source document (opens in a new tab) (Siting Radar)
NY Arietta Town Hamilton County Battery storage (BESS) In force
Active
Local Law No. 01 of 2026, Establishing a Moratorium on Battery Energy Storage Systems (Resolution 26-06-30) (Moratorium Nation)
MI Evergreen Township Montcalm County Battery storage (BESS), Data centers Adopted
Adopted, Jun 10, 2026
Battery storage/data center moratorium adopted — Township Board, Jun 10, 2026. Source document (opens in a new tab) (Siting Radar)
MI Weldon Township Benzie County Battery storage (BESS), Data centers Proposed
On the agenda (before the vote), Jun 9, 2026
Discussion of a possible battery storage/data center moratorium — Township Board, Jun 9, 2026. Source document (opens in a new tab) (Siting Radar)
MI Matteson Township Branch County Battery storage (BESS), Data centers Proposed
Hearing notice, Jun 9, 2026
Hearing notice for a proposed battery storage/data center moratorium — Planning Commission, Jun 9, 2026. Source document (opens in a new tab) (Siting Radar)
MI Hillsdale Township Hillsdale County Data centers, Solar, Wind, Battery storage (BESS) In force
Active
Ordinance No. 2026-06-02, Zoning Ordinance Amendment: Temporary Moratorium Authority, Data Center Temporary Moratorium and Temporary Large... (Moratorium Nation)
MI Beaver Township Bay County Battery storage (BESS), Data centers Proposed
On the agenda (before the vote), Jun 8, 2026
Planning commission recommendation on a proposed battery storage/data center moratorium — Board of Trustees, Jun 8, 2026. Source document (opens in a new tab) (Siting Radar)
MI Allendale Charter Township Ottawa County Data centers, Battery storage (BESS), Solar, Wind In force
Active
Ordinance 2026-07, under the Michigan Zoning Enabling Act (PA 110 of 2006) (Moratorium Nation)
2026-06 NY Wilton Town Saratoga County Battery storage (BESS) In force
Active
Local Law (Town of Wilton BESS Moratorium Law, CZRC-approved draft posted 2026-05-07) (Moratorium Nation)
2026-06 NY Stockport Town Columbia County Battery storage (BESS) In force
Active
Local Law 1-2026, Moratorium on Battery Storage Systems, Town of Stockport (Moratorium Nation)
2026-06 NY Huntington Town Suffolk County Battery storage (BESS) In force
Active
Local Law No. 17-2026 (referred to Suffolk County Planning Commission as file HU-26-04) (Moratorium Nation)
2026-06 NY Ellery Town Chautauqua County Solar, Wind, Battery storage (BESS) In force
Active
Town of Ellery moratoriums on commercial solar, wind, and battery energy storage systems (Moratorium Nation)
MI Jefferson Township Cass County Battery storage (BESS), Data centers Adopted
Adopted, May 21, 2026
Battery storage/data center moratorium adopted — Township Board, May 21, 2026. Source document (opens in a new tab) (Siting Radar)
NC City of Wilson Wilson County Data centers, Crypto mining, Battery storage (BESS) In force
Active; runs to May 21, 2027
City Council moratorium ordinance; ordinance number not located in reviewed sources (Moratorium Nation)
NY Spafford Town Onondaga County Battery storage (BESS) In force
Active
Local Law No. 1-2026 (Resolution 46-2026), a town-wide 12-month moratorium on the siting, placement, installation, construction, modification or... (Moratorium Nation)
MI Huron County — Solar, Battery storage (BESS) In force
Extended; runs to Dec 29, 2026
Board of Commissioners resolution imposing a 3-month moratorium on special use permits for Utility Scale Solar Energy Facilities and Battery... (Moratorium Nation)
NY Marcellus Town Onondaga County Battery storage (BESS) In force
Active
Local Law No. A of 2026, A Local Law Imposing a Twelve (12) Month Moratorium on Battery Energy Storage Systems within the Town of Marcellus (Moratorium Nation)
2026-05 NY Ticonderoga Town Essex County Battery storage (BESS) In force
Active
Town of Ticonderoga Local Law No. __ of 2026, a moratorium on locating battery energy storage systems (Tier 2/Tier 3 BESS) (Moratorium Nation)
2026-05 NY Benson Town Hamilton County Battery storage (BESS) In force
Active
Local Law No. 1 of 2026, Establishing a Moratorium on Battery Energy Storage Systems (Moratorium Nation)
MI Webster Township Washtenaw County Data centers, Battery storage (BESS) In force
Active
Ordinance No. 26-02, Ordinance Establishing Data Center and Battery Energy Storage System Moratorium (Police Power) (Moratorium Nation)
MI Casco Township Allegan County Battery storage (BESS), Solar, Data centers In force
Active
Casco Township Board Resolution to Establish a Moratorium on the Issuance of Zoning Permits for Battery Energy Storage Systems, Solar Energy... (Moratorium Nation)
OH Shawnee Township Allen County Data centers, Battery storage (BESS), Solar In force
Active
Trustee resolution reported by WLIO [CITE primary text not captured] (Moratorium Nation)
NY Byron Town Genesee County Battery storage (BESS) In force
Extended
Town of Byron local law imposing a temporary moratorium on battery energy storage system facilities (cited as Local Law #3 of 2026 in the... (Moratorium Nation)
MI Whiteford Township Monroe County Battery storage (BESS), Solar, Wind, Data centers Proposed
Hearing notice, Mar 31, 2026
Hearing notice for a proposed battery storage/solar/wind moratorium — Planning Commission, Mar 31, 2026. Source document (opens in a new tab) (Siting Radar)
NY Lewis Town Lewis County Solar, Battery storage (BESS), Wind In force
Active
Town of Lewis local law imposing a moratorium on the acceptance or approval of applications for permits authorizing solar energy systems, battery... (Moratorium Nation)
NY Camillus Town Onondaga County Battery storage (BESS) In force
Active
Town of Camillus Local Law No. A-2026, a twelve-month moratorium on all battery energy storage systems (Tier 1 and Tier 2) (Moratorium Nation)
GA Carroll County — Data centers, Battery storage (BESS), Solar In force
Extended; runs to Nov 12, 2026
Carroll County Board of Commissioners resolution adopted March 3, 2026, applicable only to unincorporated Carroll County; extension resolution... (Moratorium Nation)
NY Cairo Town Greene County Battery storage (BESS) Ended
Expired
Local Law #2 of 2026, 'A Local Law Imposing a Temporary Town-Wide Six-Month Moratorium on Battery Energy Storage Systems,' adopted by the Cairo... (Moratorium Nation)
2026-03 NY Northampton Town Fulton County Battery storage (BESS) In force
Active
Local Law No. 01 of 2026, the Town of Northampton Battery Energy Storage Moratorium (Moratorium Nation)
2026-03 NY Athens Town Greene County Battery storage (BESS) In force
Active
Town of Athens moratorium on battery energy storage system facilities (Moratorium Nation)
IN Dearborn County — Solar, Battery storage (BESS), Data centers In force
Active
Board of Commissioners action on Plan Commission recommendation, effective 2026-02-25; ordinance or resolution number not captured in publicly... (Moratorium Nation)
MI City of Portage Kalamazoo County Data centers, Battery storage (BESS) In force
Active; runs to Dec 31, 2026
City of Portage Ordinances O-2-2026 (Chapter 42 Article 13, Secs. 42-1302/42-1303) and O-3-2026 (Sec. 42-140 zoning temporary moratorium) (Moratorium Nation)
Earlier item in our records: Hearing notice, Feb 19, 2026
MI Cheboygan County — Battery storage (BESS), Data centers, Solar, Wind Ended
Rescinded, Feb 24, 2026
Battery storage/data center/solar/wind moratorium rescinded — Board of Commissioners, Feb 24, 2026. Source document (opens in a new tab) (Siting Radar)
IN Huntington County — Data centers, Battery storage (BESS) In force
Active
Ordinance No. 2026-04, "An Ordinance for the Adoption of a Text Amendment to the Unified Development Ordinance (UDO) for Huntington County to... (Moratorium Nation)
MI Tuscarora Township Cheboygan County Battery storage (BESS), Solar, Wind Proposed
Hearing notice, Feb 18, 2026
Hearing notice for a proposed battery storage/solar/wind moratorium — Planning Commission, Feb 18, 2026. Source document (opens in a new tab) (Siting Radar)
IN Starke County — Battery storage (BESS), Solar Ended
Expired
Ordinance Number 02 of 2026 and Ordinance Number 03 of 2026 (extending BESS and CSES moratoriums) (Moratorium Nation)
MI Blumfield Township Saginaw County Battery storage (BESS), Data centers Adopted
Adopted, Feb 10, 2026
Battery storage/data center moratorium adopted — Township Board, Feb 10, 2026. Source document (opens in a new tab) (Siting Radar)
NY Denmark Town Lewis County Solar, Battery storage (BESS) In force
Active
Town of Denmark Local Law No. 1 of 2026, establishing a twelve-month moratorium on commercial solar energy systems, battery energy storage systems... (Moratorium Nation)
2026-02 NY Newfane Town Niagara County Battery storage (BESS) Ended
Expired
2026 Temporary Moratorium Law on Battery Energy Storage System (BESS) Facilities, Local Law No. 1-2026 of the Town of Newfane (Moratorium Nation)
2026-02 NY City of Syracuse Onondaga County Battery storage (BESS) In force
Active
Syracuse Common Council ordinance (BESS moratorium) (Moratorium Nation)
NY Sherburne Town Chenango County Battery storage (BESS) In force
Extended
Town Board resolution adopting a 6-month moratorium on the construction of battery storage facilities (Town of Sherburne, no zoning code; local... (Moratorium Nation)
GA Rockdale County — Data centers, Battery storage (BESS) In force
Extended; runs to Oct 1, 2026
Rockdale County Resolution No. 2026-01 (moratorium on data centers and battery energy storage systems), extended 2026-05-12 and amended by... (Moratorium Nation)
2026-01 NY Greig Town Lewis County Solar, Wind, Battery storage (BESS) In force
Active
Town of Greig Local Law 2026-01, a moratorium on commercial renewable energy systems (solar, wind energy primary systems, battery energy storage... (Moratorium Nation)
NY City of Amsterdam Montgomery County Battery storage (BESS), Solar In force
Active; runs to Jan 5, 2027
City of Amsterdam moratorium on industrial solar and battery energy storage systems (Moratorium Nation)
MI Oshtemo Charter Township Kalamazoo County Battery storage (BESS) In force
Active; runs to Nov 25, 2026
(first instrument, November 2025) Oshtemo Charter Township ordinance imposing a one-year moratorium on commercial energy storage system (BESS)... (Moratorium Nation)
MI Clyde Township St. Clair County Battery storage (BESS) Adopted
Adopted, Nov 18, 2025
Battery storage moratorium adopted — Township Board, Nov 18, 2025. Source document (opens in a new tab) (Siting Radar)
NY Salem Town Washington County Battery storage (BESS) In force
Active
Local Law #1 of 2025 (Moratorium Nation)
NY Hurley Town Ulster County Battery storage (BESS) In force
Extended
2025 Battery Energy Storage System Facilities Moratorium Law of the Town of Hurley (proposed local law dated Sept. 30, 2025); extended by Town... (Moratorium Nation)
2025-09 NY Dunkirk Town Chautauqua County Battery storage (BESS) In force
Extended
Town of Dunkirk moratorium on battery energy storage systems (Moratorium Nation)
NY City of Oswego Oswego County Battery storage (BESS), Solar, Wind In force
Extended; runs to Feb 11, 2027
City of Oswego Local Law No. 1 of 2025, A Local Law Establishing a Moratorium on Certain Renewable Energy Systems (Moratorium Nation)
NY Clifton Park Town Saratoga County Battery storage (BESS) Ended
Replaced by permanent rules
Local Law No. 5 of 2025, A Local Law Establishing and Extending a Moratorium on Battery Energy Storage Systems Facilities in the Town of Clifton Park (Moratorium Nation)
NY Glenville Town Schenectady County Battery storage (BESS) Ended
Extended; end date Jul 31, 2026 has passed
Town of Glenville local law (BESS moratorium) (Moratorium Nation)
2025-06 NY Watson Town Lewis County Battery storage (BESS) Ended
Replaced by permanent rules
Local Law No. 2 for the Year 2025, A Local Law Enacting a Temporary Moratorium on Utility-Scale Energy Storage Systems (covering both Compressed... (Moratorium Nation)
2025-06 NY Village of Mayville Chautauqua County Battery storage (BESS) In force
Extended; runs to Jun 30, 2027
Village of Mayville local law (BESS moratorium) (Moratorium Nation)
2025-06 NY Pendleton Town Niagara County Battery storage (BESS) Ended
Replaced by permanent rules
Local Law No. 2 of 2025 (Moratorium Nation)
2025-06 NY Norfolk Town St. Lawrence County Battery storage (BESS) In force
Active
Local Law No. 5 of 2025, a Moratorium on all Energy Storage System Development in the Town of Norfolk (Moratorium Nation)
2025-06 NY Mentz Town Cayuga County Battery storage (BESS) In force
Active
A Local Law Establishing a Temporary Land Use Moratorium Prohibiting Battery Energy Storage Systems Within the Town of Mentz (Moratorium Nation)
NY Aurora Town Erie County Battery storage (BESS) In force
Extended
Town of Aurora Local Law 5-2025, a six-month moratorium on new applications for battery energy storage systems (Moratorium Nation)
NY City of Glen Cove Nassau County Battery storage (BESS) In force
Extended
City of Glen Cove moratorium on battery energy storage systems (Moratorium Nation)
NY Berne Town Albany County Solar, Battery storage (BESS) In force
Extended
Town of Berne moratorium on commercial solar facilities (extended to add battery energy storage systems on 2026-03-11) (Moratorium Nation)
NY Mina Town Chautauqua County Battery storage (BESS) In force
Extended
Town of Mina 2026 Temporary Moratorium Law on Battery Energy Storage System Facilities, Local Law No. 6 of 2026, replacing Local Law #1-2025... (Moratorium Nation)
NY City of Peekskill Westchester County Battery storage (BESS) In force
Extended
Local Law No. 3 of 2025 (original, adopted following the 2025-03-24 hearing; filed 2025-05-05, expired 2025-11-05); further extended by Local Law... (Moratorium Nation)
NY City of Gloversville Fulton County Battery storage (BESS), Solar Ended
Replaced by permanent rules
City of Gloversville local law establishing a moratorium on industrial solar and battery energy storage systems, later superseded by a permanent ban (Moratorium Nation)
2025-03 NY Hempstead Town Nassau County Battery storage (BESS) In force
Active
Town Code Chapter 101B; most recent extension Local Law No. 75-2026 (Resolution No. 801-2026), adopted 2026-09-09 (Moratorium Nation)
NY Southport Town Chemung County Battery storage (BESS), Solar In force
Extended
Local Law No. 1 of 2025, A Six-Month Moratorium on Commercial Solar Energy Systems and Commercial Energy Storage Systems within the Town of... (Moratorium Nation)
NY New Castle Town Westchester County Battery storage (BESS) In force
Extended
Local Law No. 1 of 2025, a Six-Month Moratorium Prohibiting the Review and Approval of Applications and Permits for Battery Energy Storage Systems (Moratorium Nation)
IN Marshall County — Data centers, Solar, Battery storage (BESS) Ended
Replaced by permanent rules
Ordinance 2025-9, Certified Proposal to Amend the Marshall County Zoning Ordinance Regarding a Moratorium on Data Centers (Moratorium Nation)
2025-02 NY Albion Town Orleans County Battery storage (BESS), Solar Ended
Replaced by permanent rules
Town of Albion local law (solar/BESS moratorium, 2025); later superseded by amendment to Chapter 106 (BESS) of the Town Code (Moratorium Nation)
2025 NY Turin Town Lewis County Battery storage (BESS) Ended
Expired
Village of Turin Local Law No. 01 of 2025 (original one-year moratorium on solar energy collectors/generators and battery storage facilities);... (Moratorium Nation)
2025 NY Rose Town Wayne County Battery storage (BESS), Solar In force
Active
Town of Rose proposed moratorium on the construction of large-scale solar farms and battery storage units (referred to Wayne County Planning Board... (Moratorium Nation)
2025 NY Pound Ridge Town Westchester County Battery storage (BESS) Ended
Replaced by permanent rules
Town of Pound Ridge BESS moratorium local law, replaced 2026-07-21 by permanent zoning amendment prohibiting large-scale BESS (Moratorium Nation)
2025 NY North Harmony Town Chautauqua County Battery storage (BESS), Solar In force
Extended
Temporary Moratorium on Commercial Solar and Battery Energy Storage Systems in the Town of North Harmony; extended by Local Law 3 of 2025... (Moratorium Nation)
2025 NY Montgomery Town Orange County Battery storage (BESS) Ended
Replaced by permanent rules
Town of Montgomery Local Law No. 2 of 2025 (removing battery storage systems from the zoning code), following Introductory Local Law No. 1 of 2025 (Moratorium Nation)
2025 NY Gardiner Town Ulster County Battery storage (BESS) In force
Extended
Town of Gardiner moratorium on battery energy storage systems (Moratorium Nation)
2025 NY Eden Town Erie County Battery storage (BESS) In force
Extended
Town of Eden local law prohibiting review and approval of Battery Energy Storage System applications (originally a six-month moratorium, extended... (Moratorium Nation)
2025 NY Day Town Saratoga County Battery storage (BESS) In force
Active
Local Law No. 01 of 2025, A Local Law Imposing a Moratorium on Locating Battery Energy Storage Systems in the Town of Day (Moratorium Nation)
2025 NY Chester Town Orange County Battery storage (BESS) In force
Extended
Town of Chester local law prohibiting large-scale battery energy storage system installations (Local Law 10 of 2025, extended by Local Law 3 of 2026) (Moratorium Nation)
NY North Hempstead Town Nassau County Battery storage (BESS) In force
Extended
Town Code Chapter 76 (Temporary Moratorium on Battery Energy Storage System Facilities); established by L.L. No. 11-2024 (2024-12-03), extended by... (Moratorium Nation)
2024-12 NY Milton Town Saratoga County Battery storage (BESS), Solar In force
Extended
A Local Law Entitled "Establishing a Temporary Moratorium on Large/Commercial Scale Solar Energy Installations and Battery Storage Facilities in... (Moratorium Nation)
NY Stanford Town Dutchess County Battery storage (BESS), Wind In force
Extended
Local Law #2 of 2024, A Local Law Imposing a Temporary Moratorium on Battery Energy Storage Systems and Wind Energy Conversion Systems (Resolution... (Moratorium Nation)
NY Village of Mamaroneck Westchester County Battery storage (BESS) Ended
Expired
Code of the Village of Mamaroneck 342-84.5, as extended by Local Law 11-2025 and Local Law 14-2025 (Moratorium Nation)
NY Angelica Town Allegany County Battery storage (BESS), Solar, Wind Ended
Expired
Town of Angelica local law imposing a moratorium on solar energy systems, energy storage systems, and wind generation systems (Moratorium Nation)
NY Victory Town Cayuga County Battery storage (BESS) In force
Active
Local Law #2 of 2024, as extended by a June 2025 local law (Moratorium Nation)
2024-10 NY Cameron Town Steuben County Battery storage (BESS), Solar In force
Active
Local Law No. 4 of 2024 (Moratorium Nation)
NY Smithtown Town Suffolk County Battery storage (BESS) In force
Extended
Town Code Chapter 324, Moratorium on Battery Energy Storage Systems; originally L.L. No. 13-2024 (2024-09-20), extended by L.L. No. 1-2025, L.L.... (Moratorium Nation)
NY Village of Wilson Niagara County Battery storage (BESS) Ended
Expired
Local Law #5 (new Chapter 178, Battery Moratorium) (Moratorium Nation)
NY West Bloomfield Town Ontario County Battery storage (BESS), Solar In force
Active
Local Law No. 1 of 2026 (extending Local Law No. 4 of 2024 as extended by Local Law No. 3 of 2025) (Moratorium Nation)
NY Bedford Town Westchester County Battery storage (BESS) In force
Extended
Town of Bedford local law prohibiting review and approval of applications for battery energy storage systems (Local Law No. 1-2025 extending the... (Moratorium Nation)
2024-08 NY Village of Mount Kisco Westchester County Battery storage (BESS) Ended
Replaced by permanent rules
Village/Town of Mount Kisco Proposed Local Law No. 01-2025 (amending Chapter 110 zoning, superseding the moratorium) (Moratorium Nation)
NY Putnam Valley Town Putnam County Battery storage (BESS), Solar, Wind Ended
Expired
Local Law #3 of 2024, Temporary Land Use Moratorium Prohibiting Large Scale Solar Installations, Large Scale Battery Energy Storage System... (Moratorium Nation)
NY Concord Town Erie County Battery storage (BESS) In force
Extended
Town of Concord battery energy storage system moratorium (Local Law No. 3-2024, extended by Local Law No. 2-2025 and a June 2026 six-month extension) (Moratorium Nation)
NY City of Yonkers Westchester County Battery storage (BESS) In force
Active
General Ordinance 08-2024, as extended by General Ordinance 01-2025 and General Ordinance 07-2025 (GO.7-2025) (Moratorium Nation)
NY Kent Town Putnam County Battery storage (BESS) In force
Extended
Local Law Establishing a Land Use Moratorium Prohibiting Lithium Storage Facilities (Introductory Local Law #1), adopted 2024-07-09; extended by a... (Moratorium Nation)
NY Newstead Town Erie County Battery storage (BESS), Solar Ended
Expired
Town of Newstead local law (Local Law 2 - BESS moratorium; Local Law 3 - wind moratorium) (Moratorium Nation)
NY Babylon Town Suffolk County Battery storage (BESS) In force
Extended
Town of Babylon 2026 Moratorium Law on Battery Energy Storage System Facilities (Local Law No. 2 of 2026, extending Local Law 11 of 2024) (Moratorium Nation)
NY Leyden Town Lewis County Battery storage (BESS), Solar Ended
Replaced by permanent rules
Town of Leyden Local Law #1 of 2024, 'Establishing a Townwide Twelve (12) Month Moratorium for all Large Solar Energy Systems and/or Medium/Large... (Moratorium Nation)
2024-04 NY Oyster Bay Town Nassau County Battery storage (BESS) In force
Extended
Town of Oyster Bay moratorium on battery energy storage systems (Moratorium Nation)
NY Islip Town Suffolk County Battery storage (BESS) In force
Extended
Town of Islip Town Code § 68-457, moratorium on Battery Energy Storage System permits (Moratorium Nation)
2024-03 NY Walworth Town Wayne County Battery storage (BESS), Solar Ended
Replaced by permanent rules
Local Law No. 1-2024 (To Implement a Temporary Moratorium Relative to Solar Facilities and Battery Storage) (Moratorium Nation)
2024-03 NY Royalton Town Niagara County Battery storage (BESS) Ended
Replaced by permanent rules
Town of Royalton local law (BESS/renewable energy moratorium) (Moratorium Nation)
2024-02 NY Poughkeepsie Town Dutchess County Battery storage (BESS) Ended
Replaced by permanent rules
Town of Poughkeepsie local law (temporary town-wide moratorium on large-scale BESS) (Moratorium Nation)
MI Riley Township St. Clair County Battery storage (BESS) Ended
Expired
Ordinance 61-2024 (St. Clair County) (Moratorium Nation)
2024 NY Westfield Town Chautauqua County Battery storage (BESS) In force
Active
Local Law No. 1 of 2026 (extending Local Law No. 1 of 2024) (Moratorium Nation)
2024 NY Somerset Town Niagara County Battery storage (BESS) Ended
Replaced by permanent rules
Town of Somerset local law (BESS moratorium) (Moratorium Nation)
2024 NY Rotterdam Town Schenectady County Battery storage (BESS) Ended
Expired
Introductory Local Law No. 8 of 2025 (Moratorium Nation)
2024 NY Prattsburgh Town Steuben County Battery storage (BESS), Solar In force
Active
Town of Prattsburgh proposed local law establishing a six-month moratorium on Industrial Solar Energy Facilities and Battery Energy Storage... (Moratorium Nation)
2024 NY Perth Town Fulton County Battery storage (BESS), Solar, Wind In force
Active
Local Law No. 23 of 2024 (original, commercial solar); extended by Local Law #3 of 2025 (Resolution #66, introduced 2025-05-08); further... (Moratorium Nation)
2024 NY Livingston Town Columbia County Battery storage (BESS) In force
Extended
Local Law No. 4 of 2024, extending a moratorium on Battery Energy Storage Systems in the Town of Livingston (Moratorium Nation)
2024 NY Johnstown Town Fulton County Battery storage (BESS), Wind Ended
Expired
Town of Johnstown local law (BESS/wind moratorium) (Moratorium Nation)
2024 NY Cortlandt Town Westchester County Battery storage (BESS) In force
Extended
Town of Cortlandt moratorium for new Battery Energy Storage Systems (originally Local Law 2-2024, most recently extended by Local Law 2026-01) (Moratorium Nation)
2024 NY Clymer Town Chautauqua County Battery storage (BESS) In force
Extended
Town of Clymer battery storage moratorium (all-BESS scope) (Moratorium Nation)
2024 NY Claverack Town Columbia County Battery storage (BESS) In force
Extended
Town of Claverack Local Law No. 2 of 2024, a moratorium on Battery Energy Storage Systems (Moratorium Nation)
2024 NY Carmel Town Putnam County Battery storage (BESS), Solar Ended
Replaced by permanent rules
Town of Carmel Local Law #5 of 2024 (moratorium), superseded by a permanent zoning law banning Tier 2 battery energy storage systems (>600 kWh) (Moratorium Nation)
2024 NY Busti Town Chautauqua County Battery storage (BESS) In force
Active
Local Law 3 of 2026 (extending prior commercial BESS moratorium) (Moratorium Nation)
2024 NY Brasher Town St. Lawrence County Battery storage (BESS) In force
Extended
Town of Brasher moratorium on battery energy storage systems (Moratorium Nation)
2024 NY Boston Town Erie County Battery storage (BESS) In force
Extended
Town of Boston Local Law No. 2-2024, a six-month moratorium prohibiting review and approval of battery energy storage system applications (Moratorium Nation)
2024 IN Boone County — Solar, Wind, Battery storage (BESS) Ended
Replaced by permanent rules
Ordinance 2024-06 (moratorium), superseded by Ordinance 2025-18 (Energy Overlay District), recorded January 2026 (Moratorium Nation)
2023-10 NY Village of Port Chester Westchester County Battery storage (BESS) Ended
Expired
Chapter 345 of the Code of the Village of Port Chester (temporary development moratorium on BESS) (Moratorium Nation)
NY Lysander Town Onondaga County Battery storage (BESS) In force
Extended
Town Code Chapter 102 (Battery Energy Storage Systems), Tier 2 BESS moratorium footnote; original L.L. No. 8-2023 (2023-09-21); extended by L.L.... (Moratorium Nation)
NY Southampton Town Suffolk County Battery storage (BESS) Ended
Replaced by permanent rules
Former Chapter 314, Moratorium on Battery Energy Storage Systems (adopted by L.L. No. 28-2023), amended by L.L. 1-2024, L.L. 15-2024, L.L. 10-2025 (Moratorium Nation)
NY Southold Town Suffolk County Battery storage (BESS) In force
Extended
Town of Southold moratorium on Battery Energy Storage System (BESS) facilities (Moratorium Nation)
2023 NY Warwick Town Orange County Battery storage (BESS) Ended
Replaced by permanent rules
Local Law No. 4 of 2023, as extended by Local Law No. 10 of 2024 and amended by Local Law No. 3 of 2025; superseded by Local Law #5 of 2026... (Moratorium Nation)
2023 NY Oswegatchie Town St. Lawrence County Battery storage (BESS) In force
Extended
Local Law #2 of 2023, a moratorium on battery energy storage systems in the Town of Oswegatchie; extended by Resolution 155-2024 (six months) (Moratorium Nation)
2023 NY Long Lake Town Hamilton County Battery storage (BESS) Ended
Replaced by permanent rules
Town of Long Lake Battery Energy Storage System Law, as amended by Local Law 3 of 2023; superseded by revised BESS law (Proposed Local Law No. 1 of 2024) (Moratorium Nation)
2023 NY Chautauqua Town Chautauqua County Battery storage (BESS), Solar, Wind In force
Active
Local Law No. 4 of 2026 (extending the moratorium on Battery Energy Storage Systems; companion Local Laws 3 and 5 of 2026 extend wind and... (Moratorium Nation)
— NY Yorktown Town Westchester County Battery storage (BESS) Ended
Expired
Town of Yorktown local law (BESS moratorium); Town Board separately adopted a permanent ban on new Tier 2 BESS on 2025-05-29 (Moratorium Nation)
— MI Wales Township St. Clair County Battery storage (BESS) Ended
Expired
(Moratorium Nation)
— NY Virgil Town Cortland County Battery storage (BESS) In force
Active
(Moratorium Nation)
— NY Ripley Town Chautauqua County Battery storage (BESS) Ended
Expired
(Moratorium Nation)
— NY Le Ray Town Jefferson County Battery storage (BESS) Ended
Expired
Town of Le Ray local law ("LL - Moratorium EnergyBattery") (Moratorium Nation)
— MI Howard Township Cass County Data centers, Battery storage (BESS) Pending
Pending (not yet enacted)
Proposed Resolution 2026-10; proposed Ordinance No. 237 (non-zoning temporary moratorium on data centers and battery energy storage systems);... (Moratorium Nation)
— NY Harrison Town Westchester County Battery storage (BESS) Ended
Expired
Harrison Town Code (former) 235-95, Moratorium of battery energy storage systems (Moratorium Nation)
— NY Halfmoon Town Saratoga County Battery storage (BESS) In force
Extended
(Moratorium Nation)
— NY Greenwood Town Steuben County Battery storage (BESS) In force
Active
(Moratorium Nation)
— NY Gainesville Town Wyoming County Battery storage (BESS) In force
Active
(Moratorium Nation)
— NY Freedom Town Cattaraugus County Battery storage (BESS) In force
Active
(Moratorium Nation)
— NY Frankfort Town Herkimer County Battery storage (BESS), Solar, Wind Pending
Pending (not yet enacted)
Proposed Local Law No. 2, 2026 (six-month moratorium on solar, wind, and battery storage) (Moratorium Nation)
— MI Fayette Township Hillsdale County Wind, Battery storage (BESS), Data centers Pending
Pending (not yet enacted)
Proposed township resolution/moratorium recommended by the Fayette Township Planning Commission (Moratorium Nation)
— NY Essex County — Battery storage (BESS) In force
Active
(Moratorium Nation)
— NY Elba Town Genesee County Battery storage (BESS), Solar In force
Active
Proposed Local Law No. 1 of 2026 (extending a 12-month moratorium on Tier 3 solar, large battery storage, and other renewable energy facilities) (Moratorium Nation)
— NY Corning Town Steuben County Battery storage (BESS) In force
Extended
(Moratorium Nation)
— NY Collins Town Erie County Battery storage (BESS) In force
Active
(Moratorium Nation)
— NY Carrollton Town Cattaraugus County Battery storage (BESS) Ended
Expired
(Moratorium Nation)
— NY Carlton Town Orleans County Battery storage (BESS) In force
Extended
Town of Carlton local law extending a moratorium on large battery energy storage systems (Local Law No. 6 of 2025) (Moratorium Nation)
— NY Campbell Town Steuben County Battery storage (BESS) In force
Active
(Moratorium Nation)
— NY Allen Town Allegany County Battery storage (BESS) In force
Active
(Moratorium Nation)

Moratorium records marked “Moratorium Nation” come from the Moratorium Nation inventory by Michael J. Bommarito, licensed CC BY 4.0; status follows that inventory, and we mark a record ended once its recorded end date has passed. Records marked “Siting Radar” are our own detections in public meeting documents: the status is the latest step we saw, with a link to the source. Not legal advice.

Recent battery storage zoning and siting-ordinance activity (last 90 days)

On the agenda (before the vote) Siting ordinance Battery storage (BESS)Data centers

Caledonia Township, MI

Caledonia Planning Commission · · Kent County
“he August Meeting, and Comparison of the Draft Battery Storage, Data Center, and Digital Mining Ordinance (§ 16.55) to the Michigan Townships Association Model Data Center Ordinance, Version 1.0 This memo has three…”
Source document, p. 43 (opens in a new tab) Agenda +14 related mentions
On the agenda (before the vote) Siting ordinance Battery storage (BESS)Data centersSolar

Webster Township, MI

Zoning Board of Appeals · · Washtenaw County
“…A.The Commissioners discussed the items in the Matrix and determined the high-priority items will be Data Centers Ordinance, Battery Storage Systems and Land Division Ordinance.”
Source document, p. 3 (opens in a new tab) Packet +1 related mention
On the agenda (before the vote) Zoning amendment Battery storage (BESS)

Marcellus Town, NY

Onondaga County Planning Board (Syracuse-Onondaga County Planning Agency staff) · · Onondaga County
“endment of a zoning ordinance or local law SUMMARY: the applicant is proposing Local Law C of 2026 to amend Chapter 235 of the Code of the Town of Marcellus to add a section regulating Battery Energy Storage Systems…”
Source document, p. 61 (opens in a new tab) Agenda +5 related mentions
On the agenda (before the vote) Siting ordinance Battery storage (BESS)Solar

Alfred Town, NY

Allegany County Planning Board · · Allegany County
“Town of Alfred - Local Law 1 of 2026 - Zoning Law Amendments to Regulation for Solar Energy and Battery Energy Storage Systems;”
On the agenda (before the vote) Siting ordinance Battery storage (BESS)Solar

Nelson County, VA

Board of Supervisors ·
“Staff Recommendation: Adopt proposed Resolution R2025-79 to approve the siting agreements with Piney River VA BESS 1, LLC and Colleen VA BESS 1, LLC.”
On the agenda (before the vote) Siting ordinance Battery storage (BESS)Data centersSolar

Webster Township, MI

Zoning Board of Appeals · · Washtenaw County
“A. The Commissioners discussed the items in the Matrix and determined the high-priority items will be Data Centers Ordinance, Battery Storage Systems and Land Division Ordinance.”
Hearing notice Zoning amendment Battery storage (BESS)Solar

City of Harrison, MI

Planning Commission · · Clare County

Hearing notice: battery storage/solar zoning amendment, Planning Commission; meeting Sep 8, 2026. The notice text is not reproduced here; open the original notice to read it.

Adopted Zoning amendment Battery storage (BESS)Data centersSolarWind

Montmorency Township, MI

Township Board · · Montmorency County

Adopted: battery storage/data center/solar/wind zoning amendment, Township Board; meeting Sep 8, 2026. The notice text is not reproduced here; open the original notice to read it.

On the agenda (before the vote) Siting ordinance Battery storage (BESS)Solar

Marathon Township, MI

Governing body not stated · · Lapeer County

On the agenda (before the vote): battery storage/solar siting ordinance; meeting Aug 28, 2026. The notice text is not reproduced here; open the original notice to read it.

Hearing notice Zoning amendment Battery storage (BESS)Data centers

Casco Township, MI

Planning Commission · · St. Clair County

Hearing notice: battery storage/data center zoning amendment, Planning Commission; meeting Aug 23, 2026. The notice text is not reproduced here; open the original notice to read it.

Original notice (opens in a new tab) Notice +1 related mention
Hearing notice Siting ordinance Battery storage (BESS)Crypto miningData centers

Speaker Township, MI

Planning Commission · · Sanilac County

Hearing notice: battery storage/crypto mining/data center siting ordinance, Planning Commission; meeting Jul 22, 2026. The notice text is not reproduced here; open the original notice to read it.

Hearing notice Zoning amendment Battery storage (BESS)

City of Harbor Beach, MI

Planning Commission · · Huron County

Hearing notice: battery storage zoning amendment, Planning Commission; meeting Jul 13, 2026. The notice text is not reproduced here; open the original notice to read it.

Adopted Siting ordinance Battery storage (BESS)Solar

Marathon Township, MI

Township Board · · Lapeer County

Adopted: battery storage/solar siting ordinance, Township Board; meeting Jul 8, 2026. The notice text is not reproduced here; open the original notice to read it.

Original notice (opens in a new tab) Notice for Aug 19, 2026 +1 related mention

Frequently asked questions

How many local battery storage moratoria are there in Ohio, Michigan, New York, North Carolina, Georgia, Indiana and Virginia?

As of Sep 30, 2026 we list 172 local battery storage moratoria in the seven states we cover: 110 in force or recently adopted, 22 pending or proposed and 40 ended. In force or adopted by state: Ohio 2, Michigan 20, New York 81, North Carolina 1, Georgia 3 and Indiana 3. Records come from the Moratorium Nation inventory (CC BY 4.0) and from meeting documents we monitor.

Which townships and counties have banned battery energy storage systems (BESS)?

Most local actions are temporary moratoria, not permanent bans. As of Sep 30, 2026, 110 governments in our coverage have a battery storage moratorium in force or recently adopted, including Zeeland Charter Township (MI), City of Elkhart (IN), Orangetown Town (NY), City of Kalamazoo (MI), Burlington Township (MI), Vevay Township (MI), Fayette Township (MI), Putnam County (GA), Gun Plain Township (MI), Orleans Township (MI), Kalamazoo Charter Township (MI), Village of Lordstown (OH) and 98 more. The table on this page lists every record with its date and source.

Are there upcoming votes on battery storage moratoria or siting rules?

Yes: 6 upcoming hearings or votes in the next 120 days as of Sep 30, 2026. The next is in Southport Town, NY on Oct 5, 2026 (on the agenda (before the vote)).

What is the difference between a moratorium and a siting ordinance?

A moratorium temporarily pauses applications or permits for a use (often 6 to 12 months) while the government writes rules. A siting ordinance or zoning amendment sets the lasting rules: where the use is allowed, setbacks, height, noise, decommissioning and similar standards. Many moratoria end when such rules are adopted.

Can I download this data?

Yes. The CSV on this page lists our own detections for battery energy storage systems (BESS) (moratoria, zoning amendments and siting ordinances) with our one-line summaries and links to the source documents. Moratorium Nation records are shown on the page with attribution; get the full inventory from its publisher.

Is this legal advice?

No. It is information compiled automatically from public records. Confirm anything that matters with the local government and your counsel.