| 2026-09-21 |
Fayette County |
Data centers |
Board of County Commissioners resolution (county zoning authority, emergency) imposing a moratorium on data center-related applications, zoning approvals... |
| 2026-09-16 |
Village of McDonald |
Data centers |
Emergency ordinance of McDonald Village Council (ordinance number not published in sources found) |
| 2026-09-14 |
City of Lima |
Data centers |
Ordinance 198-26, 'An ordinance enacting an eighteen-month moratorium on the establishment, development, processing, review and approval of stand-alone data... |
| 2026-09-14 |
Village of Pioneer |
Data centers |
Pioneer Village Council legislation imposing a six-month moratorium on data centers (form and number not reported) |
| 2026-09-09 |
City of Warren |
Data centers |
Ordinance of Warren City Council establishing a one-year moratorium on data centers larger than 1,000 sq ft and directing the mayor to form a Data Center... |
| 2026-09-08 |
Fairfield Township |
Data centers |
Fairfield Township (Butler County) Resolution No. 26-85, 'Resolution Imposing a Six-Month Data Center Moratorium for Fairfield Township' |
| 2026-09-08 |
Northfield Center Township |
Data centers |
Trustee Resolution 26/09-08 B imposing a temporary moratorium on the acceptance, processing and issuance of zoning certificates, permits and approvals for... |
| 2026-09-03 |
City of Westlake |
Data centers |
City of Westlake Ordinance No. 2026-99 (emergency), moratorium on zoning approvals and occupancy permits for data centers as a use, not to exceed six months |
| 2026-09-02 |
Village of Newton Falls |
Data centers |
Emergency ordinance of Newton Falls council imposing a 12-month moratorium on data center permits (number not found) |
| 2026-09-01 |
City of Defiance |
Data centers |
Emergency ordinance of Defiance City Council placing a six-month moratorium on 'the acceptance, review, processing and approval of applications for data... |
| 2026-09-01 |
City of Miamisburg |
Data centers |
City of Miamisburg Council legislation imposing a nine-month moratorium on data center development (ordinance/resolution number not located) |
| 2026-09 |
Bridgewater Township |
Data centers |
Bridgewater Township (Williams County) Board of Trustees action approving a 12-month moratorium on data centers; instrument number not found |
| 2026-09 |
Northwest Township |
Data centers |
Northwest Township (Williams County) trustee resolution (number not found) |
| 2026-08-24 |
City of Chillicothe |
Data centers |
City of Chillicothe Ordinance 44-26 (emergency), moratorium on accepting/issuing zoning permits and approvals for new (auxiliary and large-scale) data center uses |
| 2026-08-17 |
City of Fairborn |
Data centers, General / multiple uses |
Resolution 38-26 (City of Fairborn), placing 12-month temporary moratoriums on data centers, self-storage facilities, gas stations, convenience stores and... |
| 2026-08-17 |
Village of Jefferson |
Data centers |
Village of Jefferson (Ashtabula County) emergency ordinance establishing a moratorium on accepting for filing and consideration, and/or issuing zoning... |
| 2026-08-17 |
Village of Mount Gilead |
Data centers |
Village of Mount Gilead Ordinance 2027, temporary moratorium not to exceed one year on new permits and on receipt/processing of permit applications for data centers |
| 2026-08-12 |
Village of Garrettsville |
Data centers |
Ordinance No. 2026-16 (Village of Garrettsville), emergency, imposing a twelve-month moratorium on acceptance of any zoning application for data centers |
| 2026-08-10 |
Village of Plain City |
Data centers |
Ordinance 37-2026, 'Establishing a Temporary Moratorium on Data Center Development Within the Corporate Limits of the Village of Plain City and Declaring an... |
| 2026-08-03 |
City of Athens |
Data centers |
City of Athens Ordinance 70-26 (0-70-26), temporary moratorium on data centers (AI and large-scale data storage), emergency measure |
| 2026-08-01 |
Athens Township |
Data centers |
Athens Township Trustees Resolution 08-01-2026, temporary moratorium on receipt, processing or approval of zoning certificate applications for data center... |
| 2026-07-28 |
Perry Township |
Data centers |
Perry Township (Lake County) Trustee Resolution 2026-30, 'Resolution Imposing a Zoning Moratorium for Data Center Uses Located in Perry Township' (R.C. Chapter 519) |
| 2026-07-27 |
Village of Buckeye Lake |
Data centers |
Village of Buckeye Lake Resolution No. 2026-13 (emergency, under Village Charter home-rule powers), a one-year moratorium on accepting and issuing... |
| 2026-07-27 |
Clear Creek Township |
Data centers |
Clearcreek Township (Warren County) trustee resolution imposing a one-year moratorium on issuance of permits for data centers (number not found) |
| 2026-07-21 |
City of North Royalton |
Data centers |
City of North Royalton Ordinance No. 26-118 (emergency), temporary one-year moratorium on zoning, occupancy, conditional use and building permit... |
| 2026-07-16 |
City of Clayton |
Data centers, Crypto mining |
City of Clayton Resolution No. R-07-26-46 (immediate temporary 365-day moratorium on zoning, conditional use and building permit applications for data... |
| 2026-07-15 |
City of Cleveland |
Data centers |
Ordinance 556-2026, following Councilmember Charles Slife's initial proposal; advanced by the Utilities Committee (chaired by Brian Kazy) and passed by full... |
| 2026-07-14 |
Green Township |
Data centers, General / multiple uses |
Trustee resolution (number not published) imposing a 12-month moratorium on new development; adopted alongside a resolution to begin establishing township... |
| 2026-07-14 |
City of Hudson |
Data centers |
City Council legislation (six-month stay/moratorium on filing, review and approval of new data center applications), adopted on consent agenda 2026-07-14;... |
| 2026-07-14 |
City of Springfield |
Data centers |
City Commission ordinance, passed 5-0 on second reading; Ordinance 159-26 |
| 2026-07-14 |
City of Willoughby |
Data centers |
City of Willoughby Resolution No. 2026-98 (emergency), a temporary one-year moratorium on permits and on plan consideration, review or approval for data centers |
| 2026-07-13 |
City of Girard |
Data centers |
Girard City Council emergency ordinance imposing a 12-month moratorium on data center permits (passed on third reading 2026-07-13; ordinance number not... |
| 2026-07-13 |
City of Jackson |
Data centers |
City of Jackson Resolution No. 19-2026 (emergency), temporary moratorium on establishing or converting structures into data centers |
| 2026-07-09 |
Village of Middlefield |
Data centers |
Village of Middlefield Ordinance 26-136 (emergency), twelve-month moratorium on accepting any zoning application for data centers |
| 2026-07-06 |
City of Alliance |
Data centers |
City Council ordinance/legislation approved 5-1 (Councilman Phillip Mastroianni opposed; Councilwoman Jennifer Kiko absent), denying permits for any 'AI... |
| 2026-07-06 |
Village of Lordstown |
Battery storage (BESS) |
Ordinance No. 38-2026 (emergency), temporary moratorium not to exceed 180 days on new permits and permit applications for business entities utilizing... |
| 2026-07 |
City of Upper Sandusky |
Data centers |
City of Upper Sandusky council legislation (number not found) imposing a six-month moratorium on acceptance and processing of new data center developments... |
| 2026-06-30 |
City of Aurora |
Data centers |
City of Aurora (Portage County) Ordinance 2026-117 (emergency), moratorium on filing, consideration and issuance of zoning/occupancy permits involving data centers |
| 2026-06-25 |
City of Xenia |
Data centers |
City of Xenia ordinance (number not found) establishing a one-year moratorium on applications to establish, construct or convert buildings for data centers |
| 2026-06-23 |
City of Middleburg Heights |
Data centers |
City of Middleburg Heights Ordinance No. 2026-42 (emergency), moratorium on filing/issuing zoning and occupancy permits for data centers, not to exceed 12 months |
| 2026-06-22 |
City of Avon Lake |
Data centers |
City of Avon Lake Ordinance 26-60, a one-year moratorium on the development or construction of data centers |
| 2026-06-22 |
City of Broadview Heights |
Data centers, Crypto mining |
City of Broadview Heights council resolution imposing a six-month moratorium on accepting for filing, consideration, review and approval of new applications... |
| 2026-06-22 |
Village of Mayfield |
Data centers |
Mayfield Village Ordinance No. 2026-12 (emergency), 12-month temporary moratorium on rezonings, variances, conditional use permits, zoning/building permits... |
| 2026-06-22 |
City of St. Marys |
Data centers |
City Council Emergency Resolution 2026-08 |
| 2026-06-22 |
City of Wickliffe |
Data centers |
City of Wickliffe Ordinance No. 2026-39 (emergency), a moratorium on accepting, considering or issuing zoning and occupancy permits for data centers as a... |
| 2026-06-17 |
Montgomery Township |
Data centers |
Township trustee resolution under R.C. Chapter 519 |
| 2026-06-16 |
Butler County |
Data centers |
Board of County Commissioners resolution; Resolution 26-06-00963, covering unincorporated areas of Hanover, Lemon, Madison, Milford, Oxford, and Ross... |
| 2026-06-16 |
Village of Clinton |
Data centers |
Resolution No. R-26-06 (Village of Clinton), a resolution implementing a moratorium on the development of data centers within the village and declaring an emergency |
| 2026-06-15 |
City of Berea |
Data centers |
City Council emergency ordinance; Ordinance 6-6 |
| 2026-06-10 |
Ashtabula Township |
Data centers |
Ashtabula Township Board of Trustees 12-month moratorium on issuing permits for data centers (resolution number not located) |
| 2026-06-10 |
Ellsworth Township |
Data centers |
Ellsworth Township (Mahoning County) Board of Trustees data center moratorium (instrument number not located) |
| 2026-06-10 |
Howland Township |
Data centers |
Township trustee resolution under R.C. Chapter 519 (resolution number not confirmed in sources reviewed) [VERIFY] |
| 2026-06-08 |
City of Bellevue |
Data centers |
Ordinance No. 15-26 (City of Bellevue), emergency, imposing a temporary moratorium on the establishment or conversion of buildings into data centers for 12 months |
| 2026-06-08 |
City of Geneva |
Data centers |
City of Geneva emergency ordinance imposing a 12-month moratorium on the acceptance and processing of applications for zoning and/or occupancy permit... |
| 2026-06-04 |
Village of North Perry |
Data centers |
North Perry Village Council resolution (number not published) imposing a 12-month moratorium on granting permits for data centers |
| 2026-06-02 |
Braceville Township |
Data centers |
Township trustee resolution under R.C. Chapter 519 (resolution number not confirmed in sources reviewed) [VERIFY] |
| 2026-06-01 |
City of Hubbard |
Data centers |
City Council emergency ordinance (ordinance number not confirmed in sources reviewed) [VERIFY] |
| 2026-06-01 |
City of Cortland |
Data centers |
City Council emergency ordinance (ordinance number not confirmed in sources reviewed) [VERIFY] |
| 2026-06-01 |
City of Grove City |
Data centers |
City Council emergency ordinance; Ordinance C-22-26, passed 6-1 |
| 2026-06 |
City of Brooklyn |
Data centers |
City of Brooklyn Resolution 2026-21 (emergency) imposing a 180-day moratorium on building permits / certificates of occupancy for data centers |
| 2026-06 |
Washington Township |
Data centers |
Washington Township (Pickaway County) Board of Trustees data center moratorium (instrument not seen; legal notice at publicnoticesohio.com ID 297107) |
| 2026-05-28 |
Madison Township |
Data centers |
Madison Township (Lake County) Board of Trustees Resolution #26-074, a 12-month moratorium on establishing, permitting, approving, locating, constructing or... |
| 2026-05-27 |
Village of Carrollton |
Data centers |
Village of Carrollton Ordinance No. 2026-10, 'An Ordinance Authorizing a Moratorium on Data Centers in the Village of Carrollton' (effective at the earliest... |
| 2026-05-20 |
Hamilton Township |
Data centers |
Hamilton Township (Warren County) Trustee Resolution 26-0520B (emergency) under limited home-rule and R.C. 519.02 |
| 2026-05-20 |
City of New Franklin |
Data centers |
Resolution No. 26-R-28 (City of New Franklin), declaring a 6-month stay on the filing, consideration, review and/or approval of all new applications for... |
| 2026-05-20 |
City of Niles |
Data centers |
Emergency ordinance of Niles City Council placing a 180-day moratorium on granting/issuing permits and receiving/processing applications for data centers... |
| 2026-05-19 |
Village of Grafton |
Data centers |
Village Council emergency ordinance 'Establishing a Temporary Moratorium on Data Center Development in the Village of Grafton' (on the 2026-05-19 agenda... |
| 2026-05-18 |
City of North Ridgeville |
Data centers, Crypto mining |
City of North Ridgeville Ordinance No. 2026-57 (emergency), a 12-month moratorium on planning, zoning and building approvals for data centers,... |
| 2026-05-18 |
Village of Yellow Springs |
Data centers |
Village Council emergency ordinance; Ordinance 2026-08 |
| 2026-05-12 |
Bazetta Township |
Data centers |
Trustee Resolution 085-26 imposing a 180-day moratorium on the acceptance of applications, permitting and construction of data centers in Bazetta Township... |
| 2026-05-12 |
Jackson Township |
Data centers |
Resolution 2026-049, "Data Center Moratorium," Jackson Township Board of Trustees, 3756 Hoover Road, Grove City, Ohio 43123 |
| 2026-05-12 |
Painesville Township |
Data centers |
Painesville Township Trustee Resolution 2026-057, an immediate zoning moratorium for data center uses (township zoning under R.C. 519) |
| 2026-05-12 |
Village of South Point |
Data centers |
Village of South Point ordinance (number not published), a six-month moratorium on AI data centers, passed on third reading |
| 2026-05-06 |
City of Ontario |
Data centers |
Ordinance No. 26-13 (City of Ontario), emergency, imposing a six-month moratorium on applications for licensing, zoning, occupancy or other permits relating... |
| 2026-05-05 |
St. Clair Township |
Data centers |
St. Clair Township (Butler County) Board of Trustees resolution imposing a one-year moratorium on data centers (number not located) |
| 2026-05-04 |
City of Bucyrus |
Data centers |
City of Bucyrus Ordinance No. 28-2026, 'An Ordinance Implementing a Moratorium on the Development of Data Centers within the City of Bucyrus, Ohio, and... |
| 2026-05-04 |
Village of Commercial Point |
Data centers |
Village of Commercial Point Ordinance 2026-09, 18-month moratorium on data center development under R.C. 715.01 and 713.02, declared an emergency |
| 2026-05-04 |
Village of Lakeview |
Data centers |
Village of Lakeview (Logan County) Resolution No. 2026-07, a resolution to enact a twelve-month moratorium on the receipt, processing, issuance or approval... |
| 2026-05-04 |
Village of Waynesville |
Data centers |
Village of Waynesville Ordinance No. 2026-020 (emergency): temporary moratorium on acceptance, processing and approval of applications for large-scale data... |
| 2026-05 |
Swan Creek Township |
Data centers, Solar |
Swancreek Township (Fulton County) Board of Trustees motion/resolution imposing a six-month moratorium on zoning permits for data centers and solar fields... |
| 2026-05 |
Windham Township |
Data centers |
Windham Township (Portage County) Board of Trustees motion approving a moratorium on AI data centers; resolution number and text not found |
| 2026-04-30 |
Weathersfield Township |
Data centers |
Weathersfield Township (Trumbull County) trustee resolution under R.C. 519 imposing a six-month moratorium on building, zoning or approval of data centers;... |
| 2026-04-28 |
Boardman Township |
Data centers |
Boardman Township (Mahoning County) Board of Trustees one-year data center moratorium (resolution number not located) |
| 2026-04-27 |
Lake Township |
Data centers |
Lake Township (Stark County) Trustee Resolution 26-177, six-month moratorium on the operation/location of any new data center |
| 2026-04-27 |
City of Streetsboro |
Data centers, Crypto mining |
Ordinance No. 2026-70 (T-7990), emergency, placing a temporary moratorium on planning, zoning and building permits, approvals and certificates for data... |
| 2026-04-21 |
City of Findlay |
Data centers |
Ordinance 2026-042 |
| 2026-04-20 |
Brimfield Township |
Data centers |
Brimfield Township (Portage County) Board of Trustees resolution (Motion #2026-177), six-month moratorium on the operation/location of any new data center |
| 2026-04-20 |
City of Ravenna |
Data centers, Crypto mining |
City Council ordinance/paperwork reported by Record-Courier [CITE primary text not captured] |
| 2026-04-20 |
City of Tiffin |
Data centers |
Resolution 2026-42 (sharpened from "unnumbered ordinance" — confirmed via tiffinohio.net reporting) |
| 2026-04-20 |
City of Vandalia |
Data centers |
City of Vandalia Resolution 26-R-27, temporary moratorium on acceptance, consideration and/or granting of zoning, occupancy or other permits or applications... |
| 2026-04-20 |
City of Vermilion |
Data centers |
Ordinance 2026-17 |
| 2026-04-20 |
Washington Township |
Data centers |
Washington Township (Montgomery County) Board of Trustees resolution prohibiting issuance/processing of zoning permits and approvals for data center uses... |
| 2026-04-15 |
City of Kent |
Data centers |
Ordinance 2026-31 |
| 2026-04-15 |
Prairie Township |
Data centers |
Prairie Township (Franklin County) Trustee Resolution No. 18-26, six-month moratorium on zoning permits for data centers |
| 2026-04-15 |
Providence Township |
Data centers |
Trustee action using Waterville Township language, per Toledo Free Press [CITE primary text not captured] |
| 2026-04-15 |
City of Sunbury |
Data centers |
City of Sunbury Resolution No. 2026.12, temporary moratorium on data centers (permits, certificates of use, development plans, rezoning to L-I) through... |
| 2026-04-14 |
City of Avon |
Data centers |
Ordinance 37-26 (text confirmed via cityofavon.com PDF capture) |
| 2026-04-14 |
City of Twinsburg |
Data centers |
Ordinance No. 2026-065 (City of Twinsburg), emergency, establishing a moratorium on accepting for filing and issuing zoning and/or occupancy permits for any... |
| 2026-04-13 |
City of Rittman |
Data centers |
City of Rittman Ordinance No. 8519 (declared an emergency): 180-day moratorium on receipt, processing, issuance and approval of zoning certificates for... |
| 2026-04-13 |
Shawnee Township |
Data centers, Battery storage (BESS), Solar |
Trustee resolution reported by WLIO [CITE primary text not captured] |
| 2026-04-13 |
City of Tallmadge |
Data centers |
Ordinance 2026-38 |
| 2026-04-09 |
Canton Township |
Data centers |
Trustee resolution drafted by township law director [CITE primary text not captured] |
| 2026-04-07 |
Village of Ada |
Data centers, Crypto mining |
Village of Ada Resolution 2026-101 (emergency) imposing a temporary moratorium on data centers and cryptocurrency mining centers; extended by Resolution... |
| 2026-04-07 |
Clay Township |
Data centers |
Clay Township (Montgomery County) Trustee Resolution 2026-016 under R.C. 519.01, 519.02, 519.12 |
| 2026-04-06 |
Village of Archbold |
Data centers |
Resolution No. 2026-16 (temporary moratorium on data centers, advanced manufacturing facilities and technology storage facilities, adopted 2026-04-06,... |
| 2026-04-06 |
City of Massillon |
Data centers |
City Council ordinance [CITE primary text not captured] |
| 2026-04-06 |
Washington Township |
Data centers |
Board of Trustees resolution (township zoning, R.C. Chapter 519) placing a twelve-month moratorium on any new data centers; resolution number not given |
| 2026-04-01 |
Trenton Township |
Data centers |
Trenton Township Board of Trustees resolution imposing a temporary moratorium on zoning certificates, site plans and development applications for data... |
| 2026-03-24 |
Plain Township |
Data centers |
Trustee resolution [CITE primary text not captured] |
| 2026-03-19 |
Freedom Township |
Data centers |
Freedom Township (Portage County) Board of Trustees motion 03.18.26.04 imposing a one-year moratorium on data centers (no separate resolution text located) |
| 2026-03-16 |
Village of Wellington |
Data centers |
Ordinance 2026-07 (Village of Wellington), temporarily halting issuance of zoning certificates for data processing and hosting facilities |
| 2026-03-12 |
Village of Blanchester |
Data centers |
Ordinance 2026.007, "Ordinance Establishing Data Center Moratorium" |
| 2026-03-12 |
Village of Williamsburg |
Data centers |
Ordinance 1249-26, "An Ordinance Imposing a Moratorium on the Authorization or Establishment of Computer Data Centers within the Village of Williamsburg,... |
| 2026-03-05 |
Scioto Township |
Data centers |
Trustee resolution reported by Scioto Post [CITE: resolution number not posted to township website 2026-04-29] |
| 2026-03-05 |
Spencer Township |
Data centers |
Resolution 2026-03-05, imposing a 12-month moratorium on 'the approval, establishment or construction of advanced manufacturing facilities or uses' within... |
| 2026-03-04 |
Vermilion Township |
Data centers |
Vermilion Township (Erie County) Trustee Resolution 2026-06, twelve-month moratorium on receiving, processing, issuing or approving zoning permits for NAICS... |
| 2026-03-03 |
Lake Township |
Data centers |
Trustee action reported by The Press/Muck Rack excerpt [CITE primary text not captured] |
| 2026-03-03 |
Village of Mount Orab |
Data centers |
Village council ordinance [CITE: ordinance number not posted on Mt.Orab village website 2026-04-29; village site has minimal online presence] |
| 2026-03-03 |
Village of Richfield |
Data centers |
Ordinance No. 18-2026 (Village of Richfield), 180-day moratorium on zoning certificates for NAICS 518 data processing, hosting and related services (data... |
| 2026-03-03 |
City of Urbana |
Data centers |
City of Urbana emergency legislation imposing a 12-month moratorium on new data centers (ordinance number not located) |
| 2026-03-02 |
Jackson Township |
Data centers |
Jackson Township (Clermont County) Board of Trustees resolution establishing a 12-month moratorium on data center development; resolution number not published |
| 2026-03-02 |
Sprigg Township |
Data centers |
Trustee action reported by WCPO [CITE primary text not captured] |
| 2026-03 |
Monroe Township |
Data centers, General / multiple uses |
Monroe Township (Adams County) Board of Trustees resolution (number not located) imposing a 12-month moratorium on new proposals and development of data... |
| 2026-03 |
Morgan Township |
Data centers |
Morgan Township (Butler County) Board of Trustees data center moratorium resolution (number not located) |
| 2026-03 |
Plain Township |
Data centers |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found |
| 2026-03 |
Portage Township |
Data centers |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found |
| 2026-02-24 |
Village of Monroeville |
Data centers |
Village of Monroeville Resolution 2026-01 (emergency), temporary moratorium on establishing data centers or converting structures into data centers |
| 2026-02-24 |
Pleasant Township |
Data centers |
Pleasant Township (Franklin County) Trustee Resolution 11 (2026) placing a moratorium on any building of data centers in the township |
| 2026-02-17 |
City of New Carlisle |
Data centers |
Ordinance 2026-06 |
| 2026-02-17 |
Monclova Township |
Data centers |
Resolution 02172026-01 |
| 2026-02-17 |
Richfield Township |
Data centers |
Resolution 021726-01, a 12-month moratorium on data center facilities, energy-producing/storage facilities, and commercial/industrial high-energy-use... |
| 2026-02-17 |
Vienna Township |
Data centers |
Trustee resolution (Vienna Township, Trumbull County) under R.C. 519, adapted from Hubbard Township's moratorium; extension resolution August 2026 |
| 2026-02-12 |
City of Ironton |
Data centers |
Ordinance 26-01 (as amended to add Section 3, tying automatic repeal to passage of Ordinance 26-09) |
| 2026-02-11 |
Pierce Township |
Data centers |
Resolution 2026-002 |
| 2026-02-10 |
Hubbard Township |
Data centers |
Trustee resolution drafted by township legal counsel and reviewed by Trumbull County Planning Commission [CITE: primary resolution text not posted to... |
| 2026-02-02 |
City of Maumee |
Data centers |
Resolution No. 005-2026, 'A Resolution Imposing a Temporary Moratorium on the Establishment, Conversion of Other Structures or Buildings into a Data Center... |
| 2026-02-02 |
Muhlenberg Township |
Data centers |
Muhlenberg Township (Pickaway County) Trustee Resolution 2026-10, 12-month moratorium on receipt, processing, issuance or approval of zoning certificate... |
| 2026-02 |
City of Cincinnati |
Data centers |
Emergency ordinance of Cincinnati City Council establishing Interim Development Control (IDC) Overlay District No. 89, "Data Centers", under Cincinnati... |
| 2026-02 |
Paris Township |
Data centers |
Paris Township (Union County) trustee resolution (number not found) under R.C. 519 |
| 2026-01-26 |
Williamsburg Township |
Data centers |
Williamsburg Township (Clermont County) Trustees Resolution No. 2026-04 (2026-01-26), six-month moratorium on the receipt, processing, issuance or approval... |
| 2026-01-05 |
Village of Lordstown |
Data centers |
Ordinance 1-2026; extended by a second emergency ordinance passed by Village Council in mid-June 2026 following a 2026-06-15 public hearing (exact ordinance... |
| 2026-01 |
Freedom Township |
Data centers |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found |
| 2026 |
Henry Township |
Data centers |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found |
| 2026 |
Liberty Township |
Data centers |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found |
| 2026 |
Weston Township |
Data centers |
Township trustee resolution/motion imposing a temporary data center moratorium (R.C. Chapter 519 township zoning); resolution number not found |
| 2025-12-22 |
Village of Ashville |
Data centers |
Ordinance 2025-13; extended by Ordinance 2026-14 (adopted 2026-07-06 as an emergency measure, readings waived) |
| 2025-12-17 |
Waterville Township |
Data centers |
Township trustee resolution [CITE: resolution number not posted to township website; Toledo Free Press cited the 12-month moratorium and committee process] |
| 2025-12-15 |
Village of South Bloomfield |
Data centers |
Ordinance 2025-28, 'An Ordinance Imposing a 180-Day Moratorium on the Receipt, Processing, Issuance, and Approval of Any Application for a Zoning... |
| 2025-12-09 |
Washington Township |
Data centers |
Board of Trustees Motion #2025.12.09.001 (90-day initial moratorium, 2025-12-09), extended by Resolution #2026.02.10.005 (2026-02-10), citing R.C. 519.02... |
| 2025-12-08 |
City of Waterville |
Data centers |
Resolution 34-25, "A RESOLUTION IMPOSING A MORATORIUM ON THE ISSUANCE OR GRANTING OF APPLICATIONS OR PERMITS FOR DATA CENTERS AND ANCILLARY FACILITIES IN... |
| 2025-12-01 |
City of Norton |
Data centers |
Ordinance 108-2025; extended by Ordinance 55-2026 (adopted 2026-05-18 as an emergency measure) |
| 2025-11-25 |
City of Eastlake |
Data centers |
City of Eastlake Resolution No. 2025-103 (emergency), a five-year moratorium on permitting any data centers |
| 2025-11-12 |
Village of Boston Heights |
Data centers |
Resolution 2025-11-50 (Village of Boston Heights), emergency, declaring a 12-month moratorium on accepting for filing, review and approval of all new... |
| 2025-11-10 |
City of Barberton |
Data centers |
Resolution/Ordinance No. 157-2025 (emergency) instituting a moratorium on data centers within Barberton; later Ordinance No. 50-2026 (passed 2026-04-13)... |
| 2025-11 |
Shalersville Township |
Data centers |
Board of Trustees resolution (township zoning, R.C. Chapter 519) imposing a six-month moratorium on data center applications; six-month extension resolution... |
| 2025-09-03 |
Jerome Township |
Data centers |
Resolution 25-061 |
| 2022-09-06 |
City of Fairborn |
Data centers, Crypto mining |
Ordinance 25-22, 'An Emergency Ordinance Imposing a Temporary Moratorium for a Period of 180 Days from the Date Hereof on the Issuance of Any Permits,... |
| Pending: Building and Lands Committee unanimously recommended the moratorium legislation to full City Council on 2026-09-22; next council meeting 2026-09-28 |
City of Amherst |
Data centers |
Proposed City of Amherst (Lorain County) legislation (sponsored by Ward 1 Council member Brian Dembinski) prohibiting data centers larger than 2.5 MW during... |
| Pending: Ordinance No. 2026-13 had its first reading 2026-08-13 (read, not voted) and was on the 2026-09-10 agenda for second reading; no adoption record found as of 2026-09-23 |
Village of Perry |
Data centers |
Village of Perry (Lake County) proposed Ordinance No. 2026-13, a one-year moratorium on accepting and approving applications for data centers, excluding the... |
| Pending: 12-month moratorium legislation before council, vote possible Thursday 2026-09-24 (per WVXU 2026-09-23) |
Village of St. Bernard |
Data centers |
Proposed St. Bernard council legislation for a 12-month moratorium on accepting/processing applications, permits and approvals for data centers (number not found) |