3. Activity at the site's governments
Pending (dated today or later, not yet voted)
Hearing notice Project application
Battery storage (BESS) Oct 13, 2026
Pendleton Town, Niagara County, NY · Body not stated
The purpose of the hearing is to allow public input on a request for a Special Use Permit for a Battery Energy Storage System (BESS) on property located at 5960 Donner.
Quoted from: TB Public Hearing Special use permit BESS 10.13.26 (notice, meeting Oct 13, 2026). Source: D4 p.1
Adopted, extended or rescinded
Adopted Siting ordinance
Battery storage (BESS) Mar 9, 2026
Pendleton Town, Niagara County, NY · Planning Board
The Town Board hereby adopts A Local Law to Amend the Town of Pendleton Code to Regulate Battery Energy Storage Systems, in the form presented to the Town Board and on file with the Town Clerk.
Quoted from: Regular Meeting – March 9 (minutes, meeting Mar 9, 2026). Sources: D40 p.5 D41 p.7 D42 p.7 D43 p.7 D44 p.2 D45 p.2 D46 p.2 D47 p.2 +8 more · 20 detections grouped
Adopted Zoning amendment
Battery storage (BESS) Solar Wind Mar 9, 2026
Pendleton Town, Niagara County, NY · Planning Board
Maerten, Buechler, Lukasik, Rumbold, Kantor Nays 0 Absent 0 WHEREAS, the Town Board of the Town of Pendleton (the “Town Board”) has proposed a local law entitled A Local Law to Amend the Town of Pendleton Code to Regulate Battery Energy Storage Systems (the “Local Law”), which amends Chapter 247, Article IX, of the Town of Pendleton Code to establish comprehensive
Quoted from: Regular Meeting – March 9 (minutes, meeting Mar 9, 2026). Sources: D40 p.5 D51 p.4 D52 p.6 D56 p.5 D53 p.6 D57 p.5 D54 p.6 D58 p.5 +2 more · 10 detections grouped
Adopted Extended Moratorium
Battery storage (BESS) Dec 22, 2025
Pendleton Town, Niagara County, NY · Planning Board
PENDLETON THAT: The Moratorium on Battery Energy Storage Facilities established by Local Law No. 2 of 2025 is hereby extended for an additional three (3) month period, commencing upon adoption of this Resolution and expiring three (3) months thereafter unless sooner terminated by further action
Quoted from: Work Session December 22 (minutes, meeting Dec 22, 2025). Sources: D75 p.6 D76 p.5 D77 p.1 D78 p.6 D79 p.5 D80 p.1 D81 p.6 D82 p.5 +1 more · 30 detections grouped
Adopted Project application
Solar Oct 13, 2025
Pendleton Town, Niagara County, NY · Planning Board
NOW, THEREFORE BE IT RESOLVED, by the Town Board of the Town of Pendleton on this 13th day of October 2025, that a Special Use Permit is approved for Pendleton Solar 2, which is located at 6000 Donner Road.
Quoted from: Regular Meeting – October 13 (minutes, meeting Oct 13, 2025). Sources: D89 p.10 D90 p.9 D91 p.10 D92 p.9 D93 p.1 D94 p.1 D95 p.1 D96 p.2 +2 more · 16 detections grouped
The Moratorium Nation inventory also records 1 enacted moratorium for the site's governments (details in section 5). M7
Earlier-stage and other recorded items
Public hearing Planning commission recommendation Project application
Battery storage (BESS) Solar lower-confidence match Sep 15, 2026
Pendleton Town, Niagara County, NY · Planning Board
Nexamp Special Use Permit Annual Renewal – 6000 Donner Rd The board was updated on the solar panel site.
Quoted from: September (minutes, meeting Sep 15, 2026). Sources: D16 p.1 D17 p.1 · 3 detections grouped
Hearing notice Planning commission recommendation Project application
Battery storage (BESS) Sep 14, 2026
Pendleton Town, Niagara County, NY · Body not stated
Resolution Scheduling Public Hearing WHEREAS, the Planning Board of the Town of Pendleton has recommended to the Town Board the issuance of a Special Use Permit for a Battery Energy Storage System (BESS) project to be located on property at 5960 Donner Road and communicated such recommendation in the meeting minutes of the Planning Board’s August 18, 2026 meeting
Quoted from: Resolution Scheduling Public Hearing (notice, meeting Sep 14, 2026). Source: D19 p.1 · 2 detections grouped
Discussion Hearing notice Public hearing Planning commission recommendation Project application
Battery storage (BESS) Solar Aug 18, 2026
Pendleton Town, Niagara County, NY · Planning Board
Ayes 5 Maerten, Buechler, Kantor, Lukasik, Rumbold Nays 0 WHEREAS, the Planning Board of the Town of Pendleton has recommended to the Town Board the issuance of a Special Use Permit for a Battery Energy Storage System (BESS) project to be located on property at 5960 Donner Road and communicated such recommendation in the meeting minutes of the Planning Board’s
Quoted from: Regular Meeting – September 14 (Pending Approval) (minutes, meeting Sep 14, 2026). Sources: D21 p.4 D22 p.2 D23 p.1 D24 p.1 D25 p.1 · 7 detections grouped
Public hearing Planning commission recommendation Project application
Battery storage (BESS) lower-confidence match Jun 16, 2026
Pendleton Town, Niagara County, NY · Planning Board
7:10PM Public Hearing A public Hearing was opened for the proposed project. Nexamp representatives briefed the 5MW battery storage proposal.
Quoted from: June (minutes, meeting Jun 16, 2026). Source: D32 p.2 · 2 detections grouped
Hearing notice Siting ordinance
Battery storage (BESS) Dec 22, 2025
Pendleton Town, Niagara County, NY · Body not stated
2025, at 6:55 p.m. at the Pendleton Town Hall, 6570 Campbell Boulevard, Lockport, New York 14094, to consider the adoption of a proposed Local Law entitled “A Local Law to Establish Standards and Permitting Requirements for Battery Energy Storage Systems in the Town of Pendleton.” The purpose of this Local Law is to amend the Town Code to add new provisions
Quoted from: BESS Law – Public Hearing 12.22.25 (notice, meeting Dec 22, 2025). Source: D84 p.1
Hearing notice Siting ordinance
Battery storage (BESS) Dec 8, 2025
Pendleton Town, Niagara County, NY · Planning Board
BE IT RESOLVED, by the Town Board of the Town of Pendleton, on this 8th day of December 2025, that a public hearing is scheduled for the proposed Local Law, A Local Law to Amend the Town of Pendleton Code to Regulate Battery Energy Storage Systems, on December 22, 2025 at 6:55 pm.
Quoted from: Regular Meeting – December 8 (minutes, meeting Dec 8, 2025). Sources: D85 p.3 D86 p.3 D87 p.3 D88 p.1 · 4 detections grouped
4. Within 25 miles
Pending items at other governments
Vote scheduled Moratorium
Crypto mining Data centers Sep 29, 2026
City of Buffalo, Erie County, NY · 9.9 mi · Common Council
26-000627 Golombek—Resolution to Adopt a Two-Year Moratorium on Cryptocurrency Mining and Data Processing Centers 9/29/26 CC Finance
Quoted from: Common Council - 9/29/26: AGENDA - CC 9/29/26 (agenda, meeting Sep 29, 2026). Source: D7 p.7
Hearing notice Moratorium
Battery storage (BESS) Solar lower-confidence match Oct 5, 2026
Albion Town, Orleans County, NY · 24.0 mi · Body not stated
The Town of Albion Town Board Is holding a Public Hearing on October 5th, 2026 at 5:00PM to hear comments for and against the proposed Local Law 106 Imposing a Moratorium on Chapter 106 Battery Energy Storage Systems in the Town Albion.
Quoted from: Page snapshot: Public Hearing – Town of Albion, Est. 1875 (other). Sources: D5 p.1 D6 p.1 · 4 detections grouped
Discussion Siting ordinance
Battery storage (BESS) lower-confidence match Dec 7, 2026
Cambria Town, Niagara County, NY · 2.3 mi · 2025 Town Board Meetings
Wendel is also suggesting that the Town updates the battery storage law because other companies will be piggybacking behind these 94 C projects and moving into our towns and potentially wanting to put up battery storage.
Quoted from: Regular Mtg Minutes (minutes, meeting Dec 7, 2026). Source: D2 p.2
Discussion Project application
Solar Dec 7, 2026
Cambria Town, Niagara County, NY · 2.3 mi · 2025 Town Board Meetings
Supervisor Foe reported as follows: Bear Ridge Solar- There was a preliminary discussion about where the Town is going and what the opportunities are for community solar, community benefits and/or for PILOT.
Quoted from: Regular Mtg Minutes (minutes, meeting Dec 7, 2026). Source: D3 p.5
Adopted, extended or rescinded at other governments
Adopted Project application
Solar Sep 14, 2026
Aurora Town, Erie County, NY · 22.2 mi · Town Board Meetings
and further RESOLVED that a negative declaration is issued with regard to the Special Use Permit (SUP)for an expansion of the existing ground mounted solar array and system at 2100 Lewis Road, South Wales, NY.
Quoted from: 9/14/26 TOWN BOARD MEETING MINUTES DRAFT (minutes, meeting Sep 14, 2026). Source: D18 p.2 · 3 detections grouped
Adopted Siting ordinance
Solar Apr 13, 2026
Aurora Town, Erie County, NY · 22.2 mi · Town Board Meetings
Town of Aurora | Town Board Meeting | April 13, 2026 NOW, THEREFORE, BE IT RESOLVED, that the Town Board adopts Local Law No. 5-2026, the “Solar Energy Systems Code of the Town of Aurora, Erie County, and State of New York”;
Quoted from: April 13, 2026-Town Board Meeting Minutes.pdf (minutes, meeting Apr 13, 2026). Sources: D35 p.13 D36 p.1 D37 p.1 · 4 detections grouped
Adopted Rescinded Project application
Solar lower-confidence match Apr 13, 2026
Aurora Town, Erie County, NY · 22.2 mi · Town Board Meetings
SPECIAL USE PERMIT CRITERIA. Special use permits issued for utility-scale solar energy systems shall meet the following conditions:
Quoted from: April 13, 2026-Town Board Meeting Minutes.pdf (minutes, meeting Apr 13, 2026). Sources: D38 p.15 D35 p.13 · 5 detections grouped
Adopted Rescinded Zoning amendment
Solar Apr 13, 2026
Aurora Town, Erie County, NY · 22.2 mi · Town Board Meetings
LAW NO. 5-2026 A LOCAL LAW, TO AMEND LOCAL LAW 1-1990 “ADOPTION OF CODE” ADOPTED BY THE TOWN BOARD OF THE TOWN OF AURORA ON JANUARY 22, 1990, BY REPEALING AND AMENDING ARTICLE I OF CHAPTER 95A “SOLAR ENERGY SYSTEMS”;
Quoted from: April 13, 2026-Town Board Meeting Minutes.pdf (minutes, meeting Apr 13, 2026). Sources: D35 p.13 D39 p.12 · 4 detections grouped
Adopted Extended Moratorium
Battery storage (BESS) Dec 22, 2025
Aurora Town, Erie County, NY · 22.2 mi · 2025 Town Board
and WHEREAS, a six (6) month extension is required on the Moratorium to allow more time for the Comprehensive Plan to be completed and adopted and a Local Law for battery energy storage systems to be completed and adopted.
Quoted from: M INUTES (minutes, meeting Dec 22, 2025). Source: D74 p.11 · 2 detections grouped
Adopted Moratorium
Data centers lower-confidence match date not stated
Cambria Town, Niagara County, NY · 2.3 mi · Town Board
Adopted:"Local Law #5 Moratorium AI/Data Centers
Quoted from: Page snapshot: Town Board Meetings | Town of Cambria (other). Source: D101 p.1
Adopted Siting ordinance
Solar General / multiple uses date not stated
Aurora Town, Erie County, NY · 22.2 mi · Planning Board
TOWN OF AURORA LOCAL LAW ____ - 2025 THIS LOCAL LAW KNOWS AS THE “RENEWABLE ENERGY SYSTEMS PILOT LAW OF THE TOWN OF AURORA, NEW YORK.” BE IT ENACTED BY THE TOWN BOARD OF THE TOWN OF AURORA AS FOLLOWS: SECTION 1.
Quoted from: ENERGY PILOTS-PART 1 (minutes). Sources: D102 p.1 D103 p.1 D104 p.2 D105 p.1 · 4 detections grouped
Governments with recorded activity
| # | Government | Distance | Pending | Items in our documents (enacted) | Moratorium Nation | Latest item |
| 1 |
Cambria Town Town, Niagara County · monitored S17 |
2.3 mi |
1 |
3 (1) |
0 |
Dec 7, 2026 D2 p.2 D3 p.5 D101 p.1 |
| 2 |
City of Buffalo City, Erie County · monitored S20 |
9.9 mi |
1 |
3 (0) |
1 |
Sep 29, 2026 D7 p.7 D14 p.1 D15 p.10 +1 more |
| 3 |
Albion Town Town, Orleans County · monitored S19 |
24.0 mi |
1 |
1 (0) |
1 |
Oct 5, 2026 D5 p.1 M1 |
| 4 |
City of North Tonawanda City, Niagara County · monitored S21 |
4.7 mi |
0 |
0 (0) |
1 |
Jul 16, 2024 M6 |
| 5 |
Tonawanda Town Town, Erie County · monitored S15 |
5.7 mi |
0 |
0 (0) |
1 |
Aug 3, 2026 M10 |
| 6 |
Lewiston Town Town, Niagara County · monitored S18 |
6.7 mi |
0 |
2 (0) |
1 |
Sep 28, 2026 D8 p.5 D34 p.1 M11 |
| 7 |
Royalton Town Town, Niagara County · not monitored |
7.2 mi |
0 |
0 (0) |
1 |
March 2024 M8 |
| 8 |
Newfane Town Town, Niagara County · not monitored |
8.2 mi |
0 |
0 (0) |
1 |
February 2026 M4 |
| 9 |
Newstead Town Town, Erie County · monitored S14 |
9.3 mi |
0 |
0 (0) |
1 |
Jul 8, 2024 M5 |
| 10 |
Village of Wilson Village, Niagara County · monitored S22 |
13.8 mi |
0 |
0 (0) |
1 |
Sep 19, 2024 M12 |
| 11 |
Somerset Town Town, Niagara County · not monitored |
15.6 mi |
0 |
0 (0) |
1 |
2024 M9 |
| 12 |
Aurora Town Town, Erie County · monitored S12 |
22.2 mi |
0 |
19 (4) |
1 |
Sep 14, 2026 D18 p.2 D35 p.13 D38 p.15 +16 more |
| 13 |
Grand Island Town Town, Erie County · monitored S13 |
7.9 mi |
0 |
1 (0) |
0 |
— D99 p.1 |
| 14 |
West Seneca Town Town, Erie County · monitored S16 |
15.6 mi |
0 |
1 (0) |
0 |
— D100 p.1 |
Distance is from the site to the nearest point of the government's Census boundary (0 = the site is inside). Counts are for the selected sectors and include energy-facility rules in general. R1
Earlier-stage and other items at other governments
- 2City of Buffalo 9.9 mi
- Sep 22, 2026 · Moratorium · Vote scheduled · Crypto mining, Data centers D14 p.1
- Sep 15, 2026 · Moratorium · Vote scheduled · Crypto mining, Data centers D15 p.10
- 6Lewiston Town 6.7 mi
- Sep 28, 2026 · Moratorium · Discussion / Drafting / Public hearing / Vote scheduled · Battery storage (BESS), Solar D8 p.5 D9 p.4 D10 p.1 D11 p.1 +2 more
- Apr 13, 2026 · Moratorium · Public hearing / Vote scheduled · Crypto mining, Data centers D34 p.1
- 12Aurora Town 22.2 mi
- Aug 24, 2026 · Project application · Public hearing · Solar D20 p.1
- Aug 10, 2026 · Project application · Public hearing · Solar · lower-confidence match D26 p.1
- Aug 5, 2026 · Project application · Discussion · Solar · lower-confidence match D27 p.1
- Jul 24, 2026 · Project application · Planning commission recommendation · Solar · lower-confidence match D28 p.5
- Jul 13, 2026 · Project application · Discussion / Planning commission recommendation · Solar D29 p.2 D30 p.1
- Jun 22, 2026 · Project application · Public hearing / Planning commission recommendation · Solar D31 p.44
- Apr 27, 2026 · Project application · Discussion · Solar D33 p.3
- Feb 23, 2026 · Project application · Public hearing / Planning commission recommendation · Solar D61 p.21 D62 p.2
- Feb 9, 2026 · Project application · Hearing notice / Public hearing · Solar D63 p.1 D64 p.1
- Jan 18, 2026 · Zoning amendment · Discussion · Solar, Wind, Battery storage (BESS) · lower-confidence match D65 p.102 D66 p.96 D67 p.91 D68 p.90 +2 more
- Jan 18, 2026 · Siting ordinance · Discussion · General / multiple uses, Solar · lower-confidence match D71 p.73 D72 p.74
- Jan 7, 2026 · Project application · Discussion · Solar · lower-confidence match D73 p.1
- date not stated · Project application · Discussion / Public hearing / Planning commission recommendation / Vote scheduled · Solar D106 p.8 D107 p.2 D108 p.4 D103 p.1
- 13Grand Island Town 7.9 mi
- date not stated · Siting ordinance · Vote scheduled · Battery storage (BESS) · lower-confidence match D99 p.1
- 14West Seneca Town 15.6 mi
- date not stated · Moratorium · Public hearing · Data centers D100 p.1
9. Methodology, limits and disclaimer
What this is. A snapshot of what Siting Radar holds on Sep 29, 2026 about local moratoria and siting rules affecting battery storage (bess), solar, data centers near the site. Every factual line carries a citation to a stored public document (with page), a Moratorium Nation dataset row, a Census boundary or a monitored source; every quotation is checked, before delivery, to appear word for word in the text we stored for the cited page.
Governing jurisdictions are the governments whose Census TIGER/Line 2025 boundaries contain the site: the incorporated city or village if there is one, otherwise the township or town, plus the county. Boundary data are approximate at parcel scale; confirm the parcel's jurisdiction with the county auditor, assessor or GIS office.
Items are detected automatically in agendas, packets, minutes and legal notices by rules (and, where noted, a language model), then grouped per government, action and meeting date. Stage labels (discussion, hearing, adopted, ...) are the detector's reading of the text and can be wrong; the quotation and the cited page are the evidence. Items classified "other" (energy topics that are not a moratorium, zoning amendment, siting ordinance or project application) and items below the alert confidence threshold (0.5) are not shown. Items flagged wrong by our reviewers are removed. Matches below 0.7 confidence are labelled "lower-confidence match".
Dates are the meeting or document date an item refers to. For a codified ordinance, a packet or an ordinance book the date can be that of the document rather than of the vote; the cited page shows which.
Pending means a pre-vote stage whose meeting date is today or later. Governments often act at a meeting whose agenda is posted only days before; an empty pending list is not a guarantee.
Legal-notice text from statewide notice aggregators is not reproduced (their terms allow internal use only); we give our own one-line description and a link to the original notice.
Moratorium Nation records are third-party data, shown with attribution under CC BY 4.0 and matched to our registry by name, type and location.
Coverage. We monitor only governments whose agendas we found online; section 8 lists what we watch for the site's governments and how much of the radius is covered. Governments without an online agenda source can act without appearing here.
State siting. Depending on the state and the project, a state body (New York Office of Renewable Energy Siting and Electric Transmission (ORES) R2) or state law can permit, certify or limit some projects and can limit or override local rules for them; section 2 summarises who decides siting in New York as of Sep 29, 2026. Whether local rules apply to a particular project is a legal question for counsel.
The activity level is the fixed rule shown in section 1 applied to the counts in this report. It is not a probability, a forecast of any vote, or an opinion about whether a project can be permitted.
Not legal advice. This report is information extracted from public documents and third-party data. It may be incomplete, out of date or wrong, and it does not interpret any ordinance. Read the cited sources, confirm with the local government, and consult counsel before relying on it.